Council archive · source document
Decision Notice - 010.2008.00000310.001 [As Published] · 132008.310
2008/310
SK.04 A Section AA & Section BB – Thompsett January 2008
Architecture
SK.05 A North Elevation & East Elevation – Thompsett January 2008
Architecture
SK.06 A South Elevation – Thompsett Architecture January 2008
and as may be amended by these conditions.
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. The open space and setback areas are to be landscaped in accordance with Council’s
Landscaping Code and Planning Scheme Policy PSP3 on Landscaping Plants and Guidelines
and a properly prepared landscape plan prepared by a suitably qualified Landscape Architect
or Horticulturalist. Such landscaping is to be completed prior to the premises being occupied
and maintained at all times thereafter.
4. All fencing shall be setback at least 1 metre from the front property boundary, with at least half
of the fencing setback 2 metres. The area of land between the fence and the front property
boundary shall be densely landscaped to screen any fencing from the street.
5. Any advertising sign or device is to comply with Council's policies on advertising.
6. Secure bicycle racks shall be provided on site to accommodate a minimum of 13 bicycles.
7. The premises are to be identified by the provision of a street number in a prominent location to
ensure it is identifiable to all persons, particularly emergency services personnel.
8. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this requirement.
9. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
10. The development shall not exceed a maximum building height of 2 storeys and 8 metres
above natural and finished ground level.
11. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the maximum
allowable building height as required by either the conditions of approval or the Planning
Scheme.
12. The Development Permit for a material change of use of premises lapses if the use has not
happened by 25 August 2012, unless an application to extend the currency is approved by
Council.
Page 2 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000310.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 305 KB (small file)
- File type
No other editions are linked here.