Council archive · source document
08/1072 - Operational Works - Transport Type 5 - Domestic Marine (Jetty & Boatlifting Device) [As Published] · 142008.1072
sunshine Coast Checklist - Applications Involving Land
Regional Council
Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
1.
APPLICATION FORMS
1.1 Form’ PartA
1.1.1. Ensure that the form is fully completed and is a current version.
4.1.2 In the case of an MCU or Op Works below the high-water mark, owner's consent is required.
1.1.2.1 Ifthere are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated by
signatory) or Company Seal required.
1.2 Form1 Part B-R Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached.
1.1.2.1 Ensure that each of Forms B-R which are attached are fully completed.
IDAS ASSESSMENT CHECKLIST *
2.1 Ensure that relevant sections have been checked and/or completed with regard to referrals
2.2. Ensure correct parts of Form 1 are provided where required (ie most common are Part J for
Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works)
ENVIRONMENTALLY RELEVANT ACTIVITIES >
3.1. Ensure that Part G is completed if EPA referral is required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Environmental Health for fees)
FORM 2 - REQUEST TO CHANGE APPROVAL
4.1. Ensure that relevant items have been checked and/or completed including information regarding
applicant details along with owners consent if not current owner of land as shown on Council records.
If over multiple properties on one or more sites, consent of Body Corporate is required.
PLANS
5.1 Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompany the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.
SUPPORTING INFORMATION
6.1. Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). {f the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping
FEE
7.1 Ensure.that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.
[7]
[|
C4
e
Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational
Work if Jetty or if including Landscaping.
Land Development Lot Reconfiguration applications and Operational Work not including Landscaping
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
NSC g:\landuse\administrative processes\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 19 pages
Page 2
INTEGRATED PLANNING ACT 1997
Part A, Version 3.1, 3 March 2008
ia eli 4 Development Application CeCe
Part A
Common details
OTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.
RECEIVED
10 JUN 2009
‘Appucant details (The App. cent is the p-rsootesponsibe lor Mizking the cppteston and need nol be the owner of tte Laut Fhe Appicart 6 responsi? hy ensiaine Die
information provdes un the IDAS Avp..ce.on Form is conect, This anurmutntys te/-0 upon by the Assessment 2G ond anny reser Ages whate Essen. Ag ciKt
fecating tks typ a2 on. By loagaag this opp cata te App. cent sacurs thee Ob: years 27x) FeO" 52S presarbed by the (PA: Any Cevclopment perins of pred neat}
feppray! thot ory he osu a5 a Consequerios OFM.» 2 Seghom hb b aseg to the Appacsic) .
Company/organisation name (if applicable) [Pite-t Pty Ltd t/a Noosa Jetty Builders
Individual appticant/Contact person (if there is more than one applicant, provide additional applicant details on an attachment to this form)
Title First name Lastname [Reed
Postal address [Po Box 299, Noosaville. QLD 4566
Contact telephone number
Mobile phone number
0408 137 526
Facsimile number
07 5474 3480
07 5474 3480
e-mail address
[email protected]
Details of the premises (re. irelenelon which he dretopmentis proposed -Teferia the atvice at imeend ofthe fariny
1. Identify the premises by completing Table A, or Table 8 and/or Table C (ensure adequate information is given to identify the premises)
Table A _ If the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.
-
~~" Name of each focal government area in which the mobile ‘and temporary ERA is proposed to operate _ |
| 1
OR
TableB Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row, )
() [_) Street address / lot on plan for the premises (Appropriate for most applications including buifcing applications); OF
(ii) [XJ Street address Alot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty,
pontaon etc) (Note: Loton plan details may be oblained from title documents, a ‘Rate’ notice, or from the focal government.)
j “Street Address {Lot on plan description a 2.
Uni | Steet Blan ype and Local. government area (e.g. Logan,
No. | No Street Nate and officiat suburbfocaliy name | PostCode} Lot No Pian Number Caims}
[ 41 18 The Promontory, Noosaville. QLD 4566 841 SP102579 Sunshine Coast Regional Council
AND/OR
TableC Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a lot, in water (e.g. channel dredging in Moreton
Bay) etc.)
—— ESS _— a —<— ——
(Note: place each set of coordin, 9s wa separate 10%} Zone mn Loca} government area |
Easting Northing “| Latitude | Longitude | Reference | (applicable) |
1 1 ocpass
[7] wessa
LD Other-
2.
tdentify if any of the following apply to the premises by comptteting Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may invalve one or more of these characteristics - complete only if applicable)
Page 3
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g.
river, creek, lake, canal)
Name of water body, watercourse or aquifer (ifknown)
[1 Noosa Waters Canal
Table E Complete if the premises are on Strategic Port Land under the Transport infrastructure Act 1994
1
Lot on plan description for strategic port land Port Authority for the lot
Table F Complete if the premises are in tidal water
~ "Name of local government for the tidal area (if app8rable)
{1
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)
"Name of part authority for the tidal area
__. Total area ofpremises '
769.00 m? [hectares (Tick applicable unit)
@ {Existing use of the premises : |
4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
[|
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, averland flow, water etc.)?
® No oO Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application
Proposal details " : . |
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture)
New timberjety € baal storage. Aewnce_
7. Does the poposal include new buildings or operational work (including any services) on the premises?
(No EX] Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
[Resource entitlement i: ascab9) «further iifarsnction 1s. provgadan (he. athaca-vectou.attheend ofthe forn : ~ vod
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Mabitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
@ X No -GotoQg oO Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need ta answer Q9 - go to the next section.
Owner's COnseMt ( appccet") tuo mormotan & proctdad te tv ctl at hs sd af ie torn 7
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 7995, or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner an a separate row, or an an attachment to this form if applicable,
Owner's signature” Date consent
was obtained
4 [Attech Properties Pty Ltd 148 The Promontory, Noosaville. QLD 4566 28/05/2008 qi
Director lan Olifent
* Owner's signature cannot be provided on the form if you intend to submil the apptication electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate wntten documentatian of the owner's consent. If the owner is a company, 8127 of the Corporations Act 2007 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .
Premises Owner's namels Details of the premises owned —
Table H and postal address (steet address ar fot an plan description)
‘Attachments and supporting information (Compete Tabizs Use a vepciate sow for each type of attachstent or infermetion, including twlormotien requited
peeks fis Px) Please ensure ail docimuntaton submited with this form, iaduding other Parts 6f Form 1, of owner's consent, ett, are Securely attached to this Patt af the Form.
~ "Description of attachment or information p Tike ff appt bie) : nod of delivery te
Fable tegration cra ca |g cminsyser ecranctae| TO | arent marae
PartE 28-May-2008 | over the counter
2 Checklist 28-May-2008 | over the counter
Page 4
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
[3 | Engineers Plans John Norden | 28-May-2008 | over the counter |
Portable Long Service Teave PLSD levy (a, ob’ fe cere bee ag aro cotton work ¥tued over ROOD ue) . __|
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ¢ Tick box if applicable)
1 the application seeks a preliminary approval only;
[_] the application is not for building and construction work under the Building and Construction industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);
{X] all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
CJ the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment requied if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.
14. ls payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
No - End of Part A
(1 Yes - Answer Q12 below
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
. Receiving officer's Reference
Fee ($)| (GO | Date received | 1, |e (08 name PS Kae | numbers | Of \ weoo.T
| oe ee NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER ro
To: Council. | have been engaged as the private certifier for the building work referred to in this application.
Date of . |. J Name BSA Cerifcatin number | Bulking classics |
engagement . : a : , |
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
see = — - — [TGR TSE | —
» Description of the work QLeave Project Number {Amount paid ($)} Date paid form sighted by | Name of oc who sighted the |
a ci . _ manager. -
1
Privacy Statement
The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.
Advice for completing Part A
General advice
je Part A of DAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible
for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not properly made.
je The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.
Applicant details
° If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.
Page 5
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Details of the premises
The term ‘premises’ is defined by the IPA, schedule 10 to mean @ building or other structure, and land (whether or not a building or other
structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.
Details of the land are not required # the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete
Table A.
The premises may be identified in a number of ways —
« Street address and lot on plan are most common and will apply to most applications.
+ Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other
(specified) datum such as Zone Reference or GS84 may be provided.
The definition of ‘water body and ‘watercourse’ can vary from Act to Act
StrategicPortLandis within a local government area but a loca! government's planning scheme does not apply onStrategicPortL and.
StrategicPortLandis declared under the Transport infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on
strategic port land) and the Queensland Transport (Ports) website.
“Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic
port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark (defined by the Coastal Act in relation to high water
mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless
provided for under the Local Government Act 7993. Unless otherwise provided for by legistation, a local government has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection
Agency generally has jurisdiction for a local government tidal area. However, the IPA gives focal governments jurisdiction for assessing and
deciding applications for prescribed tidal works within the local government tidal area, and the planning scheme may be applied to that
assessment (to the extent provided for in the code for prescribed tidal work).
\e
Resource entitlement
| __..-.gazette-notice-under-the-Transpert infrastructure Act 1994 section 50), orif the aétivity requires referral to the Department of Main Roads.
Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
Regulation. Section 3.2.1(10){a)(ii) states an application cannot be taken to be properly made without the required evidence.
For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.
For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by _
Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.
Owner's consent
Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the
application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995, or work on rail corridor land defined under the Transport Infrastructure Act 1994.
Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.
“Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant ata rent).
Templates are available from the IPA website for the provision of owners consent as an attachment to this form. However other documentation
may be used for providing owner’s consent provided it is clear the documentation relates to the development application for the premises.
Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.
Portable Long Service Leave (PLSL) Levy
The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLS|. levy) is collected on certain building and construction work carried out inQueensland.
The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry
(Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.
The Building and Construction Industry (Portable Long Service Leave) Act 1997 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.
The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued.
The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from anyQueensiandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www.qleave.qld.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web:
wow. gleave.qld.gov.au }
Page 6
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008
rar ra
De sure tester
Part E
Building &/or operational works assessable
against a planning scheme
‘Nature of the works — oo oS |
1. Nature of work that requires assessment against a planning scheme:
(J Building work - Complete Table A KX] Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
{[] Roadworks (J Stormwater ([] Water infrastructure ([] Sewerage infrastructure
(2) Landscaping ([] Earthworks (J Drainage Works (] Signage
(CJ Clearing vegetation under the planning scheme [X] Other - Specify betow
New timber jetty 3 koat sleroge_dlesic@_.-
(ii) What type of approval is being sought? (NOTE: you have indicated multiple operational works in. question (). abave.and your answers to-this -
| — ------ - - questionrwoutd-be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
[DX] Development Permit (Preliminary approval [7] Both (Specify betow)
(iii) Is the operational work necessary to facilitate the creation of new lots (cc. subdivision)?
No [7] Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)
BNo [_] Yes - Complete Table B(a)
2. Whatis the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 13500
Mandatory Information
3, Confirm that the following mandatory information accompanies this application
oeggoment of Method of lodgement
Pans, andspeciations if applicable, showing the nature and location of the proposed works (incuding the Confirmed _ | over the counter
OFFICE USE ONLY
Date Received Reference Numbers
Advice for completing Part £
General advice
* Part A must also be completed for all IDAS devetopment applications.
» The applicant is responsible for answering all questions fully and correctly, unless following @ response there is a statement to go directly to another question,
Qi ‘A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur
Page 7
INTEGRATED PLANNING ACT 1997 y IDAS Assessment Checklist IDAS Assessment Checklist, Version 21.3, 9 May 2008 boas Development Application Form 1 is the approved form for all development applications under the integrated Planning Act 1997 IPA). Form 1 is made up of vartous Parts. Part A (Comman details) of Form 1 must be completed for aft applications. The refevance of other Parts of Form 1 depends on the nature of the application. Form 1 atso includes this IDAS Assessment Checklist, which is used to assist in determining State assessment and referral requirements, and the Parts of Form 1 retevant to the application. Section 1 and all other relevant sections of the IDAS Assessment Checklist, a3 identified in the Table below, mast be jcompleted for afl development applications except those proposed on land in an urban development area, or for building work requiring assessment against the Building Act 1975 only. For more information about development applications on fand in an urban development area, refor to wenw.uida.qid gov.au. For more advice about building applications refer to Part B of the IDAS Application Form. Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If _ unsure, phone or visit your local government.ar.log_onto.the-DIP_website-www-dip.qid.gov.au-forhelp- — For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this checklist Does the application seek approval to materially change use of the premises? ClYes |52]No ifyes - complete Section 2 of this checklist Does the application seek approval to reconfigure a lot? Ces |pgNo if yes - complete Section 3 of this checklist and Part F of DAS Application Form 1. Assessment is by the focal government. Does the application seek approval to carry out operational work? if yes - complete Section 4 of this checklist KiYes |TINo Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Yes No if yes - complete Section § of this checklist 0 x Have you received a referral agency response under section 3.3.2.0f the IPA, in relation to this development application? if yes - complete Section 6 of this checklist. OYes |KINo Does the application seek approval to carry out building work requiring assessment against a local government planning scheme? RlyYes |TINo if yes - complete Part E of IDAS Application Form 1. Assessment is by the local government. Does the application seek approval to carry out building work requiring assessment against the Building Act 1975? if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of (DAS Application Form 1. (Yes |KJNo Assessment is by a building certifier Bi FL PIQES > section t rust be compieted for a!l applications that require completion of the IDAS Assessment Checklist ERITAGE 141A 's any part of the proposal intended to be carried out on a Queensland Heritage place under the Queensland Heritage Act 1992? [KX] No-cotor78 = [_] Yes
Page 8
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008 1.1B Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9 (development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered in a Local Heritage Register under Part 11 of the Queensland Heritage Act 1992? K) No - Ge to Q1.2 oO Yes - (Complete Form 1, Part C2} This application requires assessment by the relevant local government against the IDAS Code in the Queensland Heritage Regulation 2003. if the development invotves building work and the locat govemment is not the Assessment Manager for the appiication, the local government has jurisdiction as Concurrence Agency. WA, schedule 8 pat 1 table + lem 2A, schedule 9 tanies 12.4 4&4 iF Regulation s.hedkue 7 tanle 1 tem 714,14, sechan 7 3 6 Wetinitens for terms isedtin developrnent) Queensland Hertage Reculaton 7003 schedure 7 SDAS Code} ‘REMOVING QUARRY MATERIAL; WILD RIVER AREA 1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000? (KJ No-Gotoa13 [] Yes IPA, schedule 8. part I, table 5, 2em I; IP Regulation, schedule 2, table 2, item 11; IP Regulation, schedule 1, table 5, tem 2 (wild river area): Water Act 2000, section 966C; Wild Rivers Act 2005, section 43A “ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA | 1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity? @ KX] No-Gotoar4 (] Yes JPA, schedule 8, part}, table 2, tem 1. IPA, schedule # part 7 table 5, dems # and 41P Rogutation schedisie 2, table 2, ders 1 and 25; Lavwonmental Protectan Act 1994, sector 7348 (wild) river area), Wild Revers Act 2005, secon 43A; relevant mid ret declaration: Wild Revers Code WITHIN THE LINITS OF A PORT . | 1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994? [X] No - Gotoans Cvs 8 . le — IP Regulation, schedule 2, table 2, tems 15 and 16 DECLARED FISH HABITAT AREA | 15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994? No - Got0.Q1.6 oO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Advice Agency. ) IP Regulation, schedule 2, table 2, item 26 |COMMUNITY INFRASTRUCTURE — 7 1.6 Is any part of the premises designated for community infrastructure? No - Goto Q1.7 L] Yes IP Regulation, schedule 2, table 3. xem 7 (WASTE WATER MANAGEMENT ~~ 17 Does the proposal involve the establishment or expansion of a waste water disposal system? [DX] No - End of Section? [_] Yes IP Regulation, schedule 2, table 3, item 5 tg oo fad; 2 Section 4 must be-eompleted whee the appheation seeks approve! to-carry outoperntional work. PLANNING SCHEME J 41 ls any of the proposed operational work assessable under a planning scheme? (J No - Go to 04.2 KK] Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below,
Page 9
a ‘
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.3, 9 May 2008
jSTATE-CONTROLLED ROAD. }
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
XJ No
LI Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
1K] No -Gotoa4.1.2
oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regulation, schedule 2. table J, item 3; 1P Regutatians, scheduie 2. table 3 tem Hd}
‘ACID SULFATE SOILS _ ae .. _. |
41.2 Is any of the operational work proposed in a local government area listed*' in State Planning Policy 2/02: Planning and Managing
Development involving Acid Sulfate Soils
BX] No -Got0a4.1.3 C1 Yes
41 purukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
e@ Redoliffe, Redand, Rockhampton, Sarina, Thuringowa, Tiato, Torres, Townsville, Whitsunday
iP Regulation, schedule 2, table 3, item 4; State Planning Policy 202° Planning and Managing Development involving Actd Sulfate Soils, section 3.6
jEASEMENTS AND SUBSTATIONS ; . j
4.1.3 s any of the proposed operational work for filling or excavation?
(] No -Gotoas.14
CO Yes
IP Regulation, schedule 2, table 3 item 10{a}: IP Requlation. schedule 2, table 3, item 10(b) . . _ we eae
4.1.4 1s any partof the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
(No -cotoas.15 (] Yes
IP Regulation, schedule 2, table 3, item 17
PUBLIC PASSENGER TRANSPORT : |
415 Isany of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
KK] No- Go to 04.1.6 (D1 Yes - This application must be referred to QueensiandTransport (QT) as Concurrence Agency.
@ IP Regulation, schedule 2, table 3, item 14
RAILWAY SAFETY AND EFFICIENCY |
4.1.6 ts any of the proposed operational work listed in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No- Go to 04.1.7 oO Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, tem 18
IKOALA CONSERVATION Lo 1
417 \s any part of the premises in a koala conservation area or koala sustainability area?
[KJ No -Gotoas2 ([_] Yes
IP Regulation, schedule 2, table 3, item 19
LD RIVER AREA - Although legislation provides for assessment of operational works for residential, commercial and industrial
development for the purposes of the Wild Rivers Act 2005, curreniy no dectarations for any of the wild river areas apply the Wild Rivers
rode to that type of development. : : : .
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
FASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
REA
42 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
[XJ No -cowoass {_] Yes
IPA, schedule 8. part 1, table 4, tem 2. iP Requiation. schedule 1, part 2. iable 5, xem T(c}
Wild Rivers code (Note: the code does not currently contain appicable provisions for residential, mdustriai or commercial development inside a designated urban
area}
(EGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA.
43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
[EX] No -Gotooss (] Yes
IPA, scheduie 8, part 1, table 4, items 1A-1G; IP Regulation, schedule 2. table 2, tem 5 (vegetation clearing). IP Regulation, schedule 2, table 2, tem 34 {koala
conservation); !P Regulation, schedule 1, part 3, table 4, item (vegetation clearing/vald river area), Vegetation Management Act 1999, section 22A (vegetation
clearing/wid nver area). Wild Rivers Act 2005, sections 31F and 43A
FAKING OR INTERFERING WITH WATER; WILD RIVER AREA |
44 is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
e} interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5), or from a dam constructed on a watercourse or lake?
DX] No -Gotoass [_] Yes - Answer (a) and (bj below
IPA schedule 8, part 1, lable 4, items 3{a}; IP Regulation, schedule 2, table 2, tem 8: iP Regulation, schedule 1, past 3. talve 4, dems 3 and 3A; Water Act 2000, Section SS6A (wild iver
area); Wild Rivers Act 2005, section 434; relevant wid iver declaration; Wid Rivers Code
45 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water}?
KINo Gowass | 1 Yes-- (Complete Form 1,RartK,) This application requires assessment by the Department of Naturaf Resources and Waler
(NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Cancurrence Agency.
IPA, schedule 8, part 7, table 4, tem 3b}: IP Regulation, schedule 2, table 2, item 8; IP Regulation, schedule |, part 3, table 4, item 3
Wiki Rivers code (Note: the code does not cusrently contain applicable provisions for taking or interfering wih artesian water}
46 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water}?
[XI No -Gotoas7 [[] Yes - Answer (a) and (b) below
IPA, scheutle 8, part 1, table 4, tem 3c}{); 1P Regulation, schertile 2, table 2, item 8 iP Regulation, schedule 1, part 3, lable 4. kem 3; Water Act 7000, secton 966A (wald aver arect):
Wild Rivers Act 2005, section 43A; relevant wilt iver declaration, Wild Rivers Codie.
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
e@ interfering with subartesian water (other than using a water truck to pump water}?
[XJ No -cotoass (_] Yes
IPA, schedule 8, part 1, table 4, item 3{c}{u); IP Regulation, schedule 2, table 2, item 8 iP Regulation, schedule 1, part 3, table 4, tem 3
Water Act 2000, section 966A {wild river area)(Note. no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: the code does not currently contain applicable pravisions for sub artesian walet)
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water}?
[X] No -Gotoas9 [_] Yes - Answer bath (a) and (b) below
IPA, schedule 8 part 1, table 4, dems 1(C}f)) and Hd), IP Regutition, sched: 2, table 7, dem 9: IP Regulation, schedule 1. pati 3 table 4. dem 4A: Water Act 2000, section 966B (vkt
rive) area); relevant wild nver deciaraton; Wiki Rivers Code
49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [J No (Yes
(ii) To increase the storage capacity of a referable dam by more than 10% & No DD Yes
If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). if NRWis not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA, schedule &, part 1, table 4, dem 4; IP Reguiaion, schedule 2, table 2, item 10
fFIDAL WORK; WILD RIVER AREA i
4.10 ls any of the proposed operational work tidal work, other than excluded work defined under the IPA?
DX] No -Gotoa4.11 [_] Yes - Answer (a) and (b) below
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 8 May 2008
IPA, schedule 8, part 1. table 4, item 5, IP Reguiaiwon, schedule 2, table 2. tems 12. 14 and 17 IP Regulation scheduie i, pan 3 lable 4, tems 4A and 5
Coastal Protection and Management Act 1995, seckon 104A (wild nver area}
jCOASTAL MANAGEMENT DISTRICT; WILD RIVER AREA . : |
4.11 Is any of the operational work proposed to be carried out within a coastal management district?
DRI No -cotwasiz2 [_] Yes
IPA, schedule 8, part 1, table 4, item 3. IP Regulation. scnedule 2, rable 2, tems 12 and 14: IP Regulavon, schedule 1 part 3, table 4, items 44 and 5
Coastal Protection and Management Act 1995 Act 1995, secon 104A (wild nver area) Wid Rivers AcI 2008, section 43A
WATERWAY BARRIER WORKS; WILD RIVER AREA |
412 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
BX No -Gotoas73 (_] Yes
IPA schedule 8 pail} Uble 4 nem 6; IPA schedule 8 part 7, table 4 tem 2 Fishenes Regutation 1295 51134 (self assessable codes); IP Requdauon, schedule 2, lable 2, tem 28, ci
Requiatinn suliedule 1, part 3, table 4, item 6, Feshenes Act 1994, sacuon 76D (evid aver area}; Wiki Rivers Act 2005, section 43A
JDECLARED FISH HABITAT AREA; WILD RIVER AREA * . “|
4.13 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 19947
LX] No - Goto 04.14
LI Yes
IPA. schedutz 8, patl 7, lable 4, nem 7: 1PA, schedule 8, part 2, table 4, tem 3, Fishenes Regulation 1995 sT 1A (sell-assessable coves), 1? Regulation, schedite 2, table 2, tem 25: IP
Requiauon, schedule 1, part 3. table 4, ser 7; Wild Rivers Act 2008, sections 434; t ishonies Act, section 76DC (wild nver area}
{REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA : |
4.14 |s any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
EK} No -Gotoasts (_] Yes
IPA, schedule 8 part 1, table 4, tera 8; IPA,schedute & part 2, table 4, tem. 4, Fishers Regutation 1205. 113A (sall-assessable conus): F-Regutatins sehedute 2 tatte 2, temr7g: IP
“7 o> > 7 Reputation schediile 1 part 3, tatve 4, dem 8 Fisheries Act 1994. sechon 7GDB (wld river area), Wed Rivers Act 7005, section 434, relevant wild rnver dectaratwn, Wild Rivers Code
WILD RIVER AREA Te _ “|
4.15 \s any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
[KX] No -Gotoas.16 ((] Yes
IPA, schedule 8, part 1, table 4, item 10; IP Regulation, schedule 2, table 2, item 37; Wild Rivers Act 2005, sections 42, 43A
STATE-CONTROLLED ROAD ]
4.16 [s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
DX] No - End of section 4 CI Yes
IP Regulation, schedule 2, table 2, item 3
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.
To the full extent permitted by law DiP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.
Page 12
Officer: Denis Wallace
Direct Telephone: 54495179
Response Address: PO Box 141, Tewantin QLD 4565
Email: [email protected]
Our Reference: 2008/1072
25 June 2008
Noosa Jetty Builders
PO Box 299
NOOSAVILLE QLD 4566
Dear Sir
eo Acknowledgment Advice
Integrated Planning Act 1997
Council acknowledges receipt of your application.
This Acknowledgment Advice contains information relevant to the processing and assessment of the
application. The following details are confirmed:
[1 APPLICATION DETAILS ‘|
7 Application No: 2008/1072
Street address: 18 The Promontory NOOSAVILLE
Real property LOT 841 SP 102579
description:
Planning Scheme: The Noosa Plan
[2___ TYPE OF DEVELOPMENT
e The application seeks development approval for:
. . Development Permit for Operational work - Transport Type 5 - Jetty and Boatlifting device
"3 INFORMATION REQUEST |
A further information request will be made by the assessment manager.
Notification is also given in accordance with section 3.3.6(6) of the Integrated Planning Act 1997 that
the information request period is extended by 10 days.
{4 OTHER DETAILS
You may wish to follow the progress of this application online at www.sunshinecoast.qlid.gov.au.
Should you have any further queries in relation to the above, please do not hesitate to contact Denis
Wallace on the above number.
Page 13
2008/1072 Yours faithfully, Or Denis Wallace PLANNING OFFICER
Page 14
Bigs a MIRE RNS inte gene eB
TO: 54553372
RECEIVED
ov us, (Leo LIN)
LNOMS RIMS Wor} x WiC, (E00 LIN) wo} x wO'E ‘ {E00 LIN) WoL * WOE $3din9 M0
O67}
|.
(670 L4Nn}
430 10H TINH “oe * WoL |
a |
0862
0671
066 4b 0662 le 0662
17-8US-2084 01:46 FROM:SUPERIOR JETTIES SSgTa476
om mee
Page 15
Pri/l
ainda ramen, Sh Wedd 7 ww
TO: 4553372
(LEO LN)
INOUS KIMS wor) x we’ $3alnd “0
“(£00 LIN) wor, * wore {E00 LIN} WoL x Wore
YIOIOH TINH Wot * WoL
-AUS-2804 @1:46 FROM:SUPERIOR JETTIES 55970476
=>
1
Page 16
me ome
TO: S4S53372
(900 LIN}
INOYd RIMS WO") x WiC,
(go LIN)
$30Ino MO
{E00 LIM) wor * Woe (E00 LIN) WoL x WOE
(670 Lan}
Y3I01OH TNH “Oe * wo,
Sl
) |
.
J
1
L.
AUS~2004 01:46 FROM:SUPERIOR JETTIES SOgTe476
1?
Page 17
TO: 54553372
~AUS-2884 81:46 FROM:SUPERIOR JETTIES S597Hd7E,
17.
(300 LIN)
LNOYd KIMS WOy x UCT
{E00 LIN) WO? * woe
(E00 LIN) Wor x Woe
(k€0 LIA)
$309"
(670 LAN)
JO10H TINH Moe x wor |
ssf
C66———_~1
|
Page 18
Sunshine Coast LAND USE SECTION FEES Regional Council RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES Material Change of Use - Code/Impact : Consistent §21 inconsistent : 521 Assessment under Superseded Planning Scheme 521 Modification to a Development Permit 521 Extension of a Currency Period. §21 @ Operational Works - Landscaping : 521 Bldg Work assessable against the Planning Scheme 521 PRE LODGEMENT REVIEW Half Hour 522 One Hour §22° ADVERTISING . Purchase Advertised Applications 523 JETTIES : / . Jetty Application Fee - / 300 524 Jetty Bond : : _ Sado _- 51 : , : . . (Category 4) BONDS ” Performance Bond 51 , (Category 9) SIGNS : Registration Fee : . 222 SEARCH FEE . . . : Search of Land Use Section file. 112 Liquor Licensing Request m 113 TOTAL $ foo name: Avhe ct Proper kes AL ADDRESS: fog. Neos o- feting Pruwt choms ) ST kevta loircanw Se Kent “fowrs SA SOG FILENO: 6&1] io75 _ DATE: 23[elos receiptno: =| + Cay | Signature of TP Officer: PA pen 2 AUTHORITY NO: (4 | e208] 1072/1
Page 19
001 1/80. ran’ NOUHev S — waco ae oumann a nent reavopasnen sejyejoossy 9 uepion uyor = ff SUSLVM WSOON AYOLNOWOWd SH 81 'ON Ly@ LOT ALLar GaSOd0ud Id SalLYSdOd HOSLYV sygaina ALLS? YSOON Sv ONIOVELL ee LT A ed LIFT) OF 6 NOILVAA TS — | Nid ALIS hototh ON3 We wy b¥8 101 s av tL WO & wa? oeatt AYOLNOWOUd 3HL 3009 ONMid - 612 SV H.LIM FONVGHXODOV Ni GATIVLSNI 3€ TIVHS S3Wd TIV “9 GHVZVH OL GaLVSeL ONY GOOMAYVWH GaA0uddY 38 TIVHS S3Wd TIV ‘Sad 1 LNOAV1 ONINVY GaLVIUL NIN 002 @ ¢ 5 $310d GMH & ' Sto, a al ‘Said ail HOWA SM3YOS T3SLS SSI INIVLS OML HLIM Susvae OL Gaxi4 QMH #14 SZt x BE “ONDIOAQ wavs FWXALOIO GAaLVIDOSSV ONV ONIHOLd BNOLS JO YVATO 38 OL S3d ¢ - eos kg / sy nevis stasoun9 Omh L NOILVASTA ” “GHV 990 Ta YaLLVM WINING | GH O'L Ta TIWM 40 dOL ” “GH 007 Ta 1837 GO07a dacdodsY WANN |
Page 20
NOTES:
1. UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE
DURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE
ocuer: A STRESS GRADE OF F14 MIN.
76 x 38 HWOD
{178 xNot4 TYPE 17 2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL
SCREWS @ 450 CRS COMPLY WITH THE ENVIRONMENTAL PROTECTION AGENCYS'
OPERATIONAL POLICY - "BUILDING AND ENGINEERING
STANDARDS FOR TIDAL WORKS."
PLES:
@ 200 He MARINE HWD POLES 3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE
WiTH Ab ziee-PINGCOOE APPROVED MARINE GRADE 316. ALL OTHER STEELWORK
DETAIL INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC.,
SHALL BE HOT DIPPED GALVANISED OR STAINLESS STEEL.
4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED
OR RINGED.
5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM
THE DRAWINGS.
SECTION: AX
160 x 76 HWD
10 PL ANGLE BRACKET
2/M16 8/5 TO EACH MEMBER
ir ¢
DETAIL
:
180 x 78 HWD
No.18
THE PROMONTORY
NOOSA WATERS
RABRINK PTY LTD T/A
John Norden
WALKWAY DECK VERTICAL & Associates
DESIGN LIVE LOAD - 2.0 kPa Servotsral / Ciel Design Engineers
MAXIMUM MOORED VESSEL - 5m DETAIL
BERTHING VELOCITY - 0.5 m/sec
JETTY USE:
SINGLE USER, PRIVATE
NO VEHICULAR ACCESS
2M1688
180 x75 HW ————-
Ly
Suite 16 Tewantin Plaza"
Poinciene Avenue / PO Box 205
Tewentin Q 4685
:
Ph: O7 84407137 Fax: 07 64407172
Emalt: [email protected]
Used in these records
08/1072 - Operational Works - Transport Type 5 - Domestic Marine (Jetty & Boatlifting Device) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.