Skip to the record
Noosa’s premier civic archive.

Council archive · source document

08/1072 - Operational Works - Transport Type 5 - Domestic Marine (Jetty & Boatlifting Device) [As Published] · 142008.1072

of 20

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008

rar ra

  
   
 

      
 

 
 

De sure tester

Part E

Building &/or operational works assessable
against a planning scheme

 

‘Nature of the works — oo oS |
1. Nature of work that requires assessment against a planning scheme:
(J Building work - Complete Table A KX] Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?

{[] Roadworks (J Stormwater ([] Water infrastructure ([] Sewerage infrastructure
(2) Landscaping ([] Earthworks (J Drainage Works (] Signage
(CJ Clearing vegetation under the planning scheme [X] Other - Specify betow

 

New timber jetty 3 koat sleroge_dlesic@_.-
(ii) What type of approval is being sought? (NOTE: you have indicated multiple operational works in. question (). abave.and your answers to-this -
| — ------ - - questionrwoutd-be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
[DX] Development Permit (Preliminary approval [7] Both (Specify betow)
(iii) Is the operational work necessary to facilitate the creation of new lots (cc. subdivision)?
No [7] Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)

BNo [_] Yes - Complete Table B(a)

 

 

 

 

 

 

2. Whatis the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 13500

 

 

 

Mandatory Information

3, Confirm that the following mandatory information accompanies this application

 

 

 

 

 

 

 

 

 

 

oeggoment of Method of lodgement
Pans, andspeciations if applicable, showing the nature and location of the proposed works (incuding the Confirmed _ | over the counter
OFFICE USE ONLY
Date Received Reference Numbers

 

 

 

 

Advice for completing Part £

 

General advice
* Part A must also be completed for all IDAS devetopment applications.
» The applicant is responsible for answering all questions fully and correctly, unless following @ response there is a statement to go directly to another question,

 

 

Qi ‘A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur

 

 

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1072 - Operational Works - Transport Type 5 - Domestic Marine (Jetty & Boatlifting Device) [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.