Council archive · source document
Decision Notice - MCU22 0052 [As Published] · MCU22/0052
Officer: Georgina Schramm
Direct Telephone: 07 5329 6569
Our Reference: MCU22/0052
Your Reference: TP220001
18 December 2023
QR Ellis & TN Ellis
C/- JDBA Certifiers
PO Box 1365
MOOLOOLABA QLD 4557
[email protected]
Dear Sir/Madam,
Decision Notice
Planning Act 2016
I refer to your application and advise that on 12 December 2023, Council decided to approve the
application, subject to conditions.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: MCU22/0052
Street address: 332 Eastern Branch Road, Kin Kin
Real property description: Lot 218 MCH 186
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
Council decided to issue the following type of approval:
• Development Permit for Material Change of Use - Short-term accommodation (3 cabins)
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice, as relevant to each particular
stage, must be complied with prior to the use commencing, and then compliance maintained
at all times while the use continues.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 8
Document Set ID: 22732844
Version: 3, Version Date: 18/12/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 7 pages
Page 2
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
A.01.1 A Context Site Plan prepared by BTC Design 7 November 2023
& Drafting (as annotated by Council)
(received by Council)
A.01.2 A Site Plan prepared by BTC Design & 7 November 2023
Drafting
(received by Council)
A.01.3 A Plans and Elevations prepared by BTC 7 November 2023
Design & Drafting
(received by Council)
Currency Period
3. This development approval lapses if the use has not happened by 12 December 2029,
unless an application to extend the currency period is approved by Council.
Sunset Clause for Completion of Approved Development
4. Pursuant to s88(1) of the Planning Act 2016, the uncompleted aspects of this development
approval lapses if the whole of the approved use has not happened by 12 December 2029.
Staging
5. The development may be staged, provided that any road access and infrastructure services
required to service a particular stage are constructed with that stage. Unless otherwise
expressly stated, the conditions must be read as being applicable to all stages.
6. All rehabilitation works required as part of Condition 12 must be completed prior to the
commencement of Stage 1.
Nature and Extent of Approved Use
7. The approved use must be used only for short term visitor accommodation only. The site
must not be occupied by persons for the purpose of permanent accommodation, excluding
those persons in the existing dwelling house on the site.
8. The total number of guests accommodated at any one time must not exceed 6 people.
Building Height
9. The maximum height of the development must not exceed 5 metres above the finished
ground level and the natural ground level.
Street Identification
10. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate, the
building name.
Building Appearance
11. All air conditioning units or other mechanical equipment must be located at ground level, or
otherwise fully enclosed or screened such that they are not visible from the street frontages
nor adjoining properties.
Page 2 of 8
Document Set ID: 22732844
Version: 3, Version Date: 18/12/2023
Page 3
Landscaping Works
12. The development site must be landscaped and rehabilitated. The works must be undertaken
in accordance with an Operational Works approval and the Noosa Plan for that specific area
and must include in particular:
a. A rehabilitation management plan.
b. The land area 10 metres either side of the waterway identified in red on the annotated
plan must be rehabilitated and revegetated and removed of all weeds species listed in
Planning Scheme Policy 2 Landscaping and Council’s Biosecurity Plan 2020 pest
plants listed in Schedule 1 part 3, Schedule 2 and Non-scheduled invasive species.
c. Rehabilitation works must incorporate tree, shrubs, groundcovers, and grasses
selected and installed in accordance with the Planning Scheme Policy 2 –
Landscaping.
d. The 1 in 2 batters on the northeastern side of the car park must be landscaped with
trees shrubs and groundcovers to stabilise and screen the carpark when viewed from
Eastern Branch Road.
13. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
Bushfire Management
14. The site must be provided with a water storage reservoir having a minimum 5,000 litres of
water for emergency firefighting purposes per cabin. Such storage must be provided in
addition to the water supply capacity required for the use and must be provided in the form
of either an accessible dam, swimming pool, or rainwater tank. If by rainwater tank, water
storage for firefighting purposes must be provided either in a separate rainwater tank or a
reserve section in the main water supply tank on which:
a. the domestic take off from the tank is at or above the 5,000 litre point; and
b. standard rural fire brigade fittings are fitted to the tank outlet for access by four wheel
drive rural services vehicles.
15. The site must be provided with an auxiliary power supply such as a petrol driven fire fighter
pump (or generator), together with a hose of sufficient length to easily reach around to all
sides of the buildings.
16. A bushfire evacuation plan for the site must be prepared by a qualified person* and submitted
to Council prior to the issue of any Development Permit for Operational Works.
*(Refer to Advisory Note)
17. A copy of the bushfire evacuation plan for the development must be provided to the nearest
fire authority.
18. Certification must be submitted to Council from a qualified person* which certifies that the
development has been constructed in accordance with the bushfire management conditions
of this Decision Notice.
*(Refer to Advisory Note)
Natural Hazard Management
19. The Flood and Fire Management strategies outlined in the Natural Hazard Management
Report (doc No. 304-001-01, Rev. A) prepared by BAX Engineering must be adhered to at
all times while the use is open for business. In addition to this report, the following must also
be prepared, actioned and adhered to at all times while the use is open for business:
a. Notifying all prospective guests on all advertising devices (i.e., websites, flyers,
brochures, etc.) that the site may be inaccessible during rain and fire events;
Page 3 of 8
Document Set ID: 22732844
Version: 3, Version Date: 18/12/2023
Page 4
b. A process for management to advise booked guests for the potential for the site to be
inaccessible due to predicted weather events; and
c. On-site controls and processes for guests currently on-site during flooding and fire
events.
Water Supply
20. The development must be provided with a potable water supply connected to each cabin.
The storage capacity of the potable water supply must be a minimum of 5000 litres per guest.
The storage capacity of the potable water supply must be a minimum of 4000 litres per guest
bedroom/unit/cabin.
Wastewater Treatment and Disposal
21. The development must be provided with an on-site wastewater treatment and effluent
disposal system having a capacity sufficient for the use*.
*(Refer to Advisory Note)
Site Access and Driveways
22. An access driveway must be provided from Eastern Branch Road to all parking and
manoeuvring areas of the development. The access driveway must be constructed using an
all-purpose weather material. The works must be undertaken in accordance with an
Operational Works approval and must be generally in accordance with BAX Engineering’s
Roadworks Layout Plan Sheet 2 of 2 (dwg No. 304-001-302, Rev. B).
23. The property owner is wholly responsible for the ongoing maintenance of the proposed gravel
driveway and gravel walking track. The property owner must ensure that the gravel driveway
and gravel walking track are returned to their post-construction conditions after inclement
weather events that may have been damaged due to flooding or rainfall.
Car Parking
24. A minimum of 3 car parking spaces must be provided and marked on the site and made
available and accessible at all times while the use is open for business. The works must be
undertaken in accordance with an Operational Works approval, be generally in accordance
with BAX Engineering’s Overall Roadworks Layout Plan (dwg No. 304-001-300, Rev. B) and
must have dimensions, crossfalls and gradients in accordance with Australian Standard
AS2890: Parking Facilities.
25. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Stormwater Drainage
26. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Easements
27. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
28. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
29. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
30. All works must be carried out in accordance with the recommendations contained Douglas
Partners’ Investigation Summary Report (Doc No. R.001) dated 21 December 2022.
Page 4 of 8
Document Set ID: 22732844
Version: 3, Version Date: 18/12/2023
Page 5
Earthworks and Retaining Walls
31. All fill and associated batters must be undertaken in accordance with an Operational Works
approval, be generally in accordance with BAX Engineering’s Earthworks Layout Plan (dwg
No. 304-001-200, Rev. B) and be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
Damage to Services and Assets
32. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
304-001-200 B Earthworks Layout Plan prepared by BAX Engineering 18.10.23
304-001-300 B Overall Roadworks Layout Plan prepared by BAX 18.10.23
Engineering
304-001-301 B Roadworks Layout Plan Sheet 1 of 2 prepared by BAX 18.10.23
Engineering
304-001-302 B Roadworks Layout Plan Sheet 2 of 2 prepared by BAX 18.10.23
Engineering
304-001-200 B Earthworks Layout Plan (as annotated by Council), 18.10.23
prepared by Bax Engineering
304-001-01 A Natural Hazard Management Report prepared by BAX 4.11.2023
Engineers
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
carries out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
of Aboriginal cultural heritage.
Page 5 of 8
Document Set ID: 22732844
Version: 3, Version Date: 18/12/2023
Page 6
You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
Equitable Access and Facilities
2. The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the National Construction Code - Building Code of Australia (Volume 1) as
they relate to people with disabilities. Your attention is also directed to the fact that in addition
to the requirements of the National Construction Code as they relate to people with
disabilities, one or more of the following may impact on the proposed building work:
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Buildings) Standards.
Development Compliance Inspection
3. Prior to the commencement of the use, please contact Council's Development Assessment
Branch to arrange a Development Compliance Inspection.
Qualified Person
4. For the purpose of preparing a Landscape / Rehabilitation Plan, a qualified person is
considered to be a landscape architect, landscape designer and/or horticulturist with a
minimum of 3 years current experience in the field of landscape design.
5. For the purpose of preparing an Arborist Report, a qualified person is considered to be a
person with either:
a. ISA certification; or
b. a Diploma of Arboriculture in addition to a minimum of 3 years current experience in
the field of arboriculture.
6. For the purpose of preparing a Rehabilitation Plan, a qualified person is considered to be a
landscape architect or ecologist with a minimum of 3 years current experience in the field of
landscape design.
7. For the purpose of preparing a Fauna Management Plan, a qualified person is considered to
be an ecologist with a minimum of 3 years current experience in the field of fauna assessment
and management.
8. For the purpose of preparing a Bushfire Management Plan, and for certifying compliance
with the bushfire requirements of this Decision Notice, a qualified person is considered to be
an ecologist with a minimum of 3 years current experience in the field of bushfire assessment
and management.
Short Stay Letting
9. On 21 October 2021, Noosa Council adopted a new local law for short stay letting and home
hosted accommodation. The local law commenced on 1 February 2022. A one off application
will need to be made, under the new local law, for all existing and new properties operating
short stay letting or home hosted accommodation, unless identified as exempt.
For more information and application forms, please visit Council’s website below:
https://www.noosa.qld.gov.au/short-stay-letting-home-hosted-accommodation-local-law
Advertising Devices
10. All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1
(Administration) 2015 including both temporary and permanent signage. All freestanding,
pylon or pole signs or signage that is illuminated requires approval from Council prior to being
installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1 is
prohibited from being erected in the Shire.
Page 6 of 8
Document Set ID: 22732844
Version: 3, Version Date: 18/12/2023
Page 7
Infrastructure Charges
11. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
8. PROPERTY NOTES
Not applicable.
9. VARIATION APPROVAL DETAILS
Not applicable.
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Operational Works Road work, Drainage work, Earthworks,
Vegetation.
Development Permit for Building Works All building work.
11. SUBMISSIONS
Not applicable.
12. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a negotiated decision notice will be
issued. Only one negotiated decision notice may be given.
13. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available online at
www.noosa.qld.gov.au or at Council Offices.
Yours faithfully,
Georgina Schramm
Development Planner
Enc: Appeal Rights
Infrastructure Charge Notice
Approved Plans/Documents
cc. Unitywater
Page 7 of 8
Document Set ID: 22732844
Version: 3, Version Date: 18/12/2023
Page 8
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 8 of 8
Document Set ID: 22732844
Version: 3, Version Date: 18/12/2023
Used in these records
Decision Notice - MCU22 0052 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 159 KB (small file)
- File type
No other editions are linked here.