Council archive · source document
Minor Change Existing Approval DBW18/0004.05 (As Published)
21. Dense landscaping must be established within the northern and southern setback areas to
the east of the main building line in accordance with Councils Planning Scheme Policy
PSP03 Landscaping plants and guidelines.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
PLANNING
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
carries out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations
under the ACH Act.
Infrastructure Charges
2. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
Turtle Habitat Protection
3. To minimise the impact of development on turtle nesting sites and the sea-finding behaviour
of hatchlings, the following actions are recommended to be undertaken during construction of
the development:
a. Construction works are to be restricted to daylight hours during the turtle nesting and
hatching season (October – May).
b. Flood lighting must not be used from October – May (turtle nesting and hatching
season).
4. All lighting should be positioned and managed to reduce sky glow and light spill onto the
beach to minimise disruption to turtle nesting and sea-finding behaviour of hatchlings.
Management measures include reduced intensity, long wavelength lights; shielded, low to
the ground, and directed onto areas of interest; low reflectance building surfaces and paint;
and tinted external glass. The following should be incorporated into the development:
a. All windows, glass doors, glass panels and sky lights facing the beach (NE, E, SE) to
have 15% visible light transmittance tinting.
b. All windows, glass doors, glass panels and sky lights facing the beach (NE, E, SE) to be
fitted with opaque blinds, to be drawn from 8:00 pm during turtle nesting and hatching
season (October – May).
c. Indoor and outdoor paint/surfaces/fixtures to be matte and dark in colour and have a
maximum reflectance value of 30%.
Page 6 of 9
Document Set ID: 22421585
Version: 4, Version Date: 15/05/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval DBW18/0004.05 (As Published)Related documentApplication case desk ↗
About this file
- File size
- 174 KB (small file)
- File type
No other editions are linked here.