Original source · versioned page text
MCU18.0166 - Response to Information Request (amended)
F IGURE 5-3 S ITE LAYOUT PLAN
IRIS Visual Planning + Design Page 13
[OCR of page images]
SITE LOCATION
LOT2
oe e202: Ee
rife | j
RP192052 +
LOT 21
ae SP148684 |
SITE CO-ORDINATES
MONOPOLE LOCATION
DATUM: MGA (GDA94) [ ZONE: 56
LATITUDE -26.31594"
LONGITUDE 152.83023°
EASTING 483 056
NORTHING 7 089 316
ALEGEND
Af At — EXISTING AERIAL ELECTRICAL ROUTE
— WE — mE — PROPOSED NBN ELECTRICAL ROUTE
—--——--— PROPERTY BOUNDARY
FiGURE 5-3 SITE LAYOUT PLAN
IRIS Visual Planning + Design
Lor 89
MCH1219
EXISTING DWELLING (TYP.)
LOT 10»;
RPI 64 { \é
LOT 22
OVERALL SITE PLAN
EXISTING DWELLING
EXISTING ENERGEX. y
POWER POLES: \
‘
1 6
wane
TELSTRA SITE-=—
i
DETAIL
‘SCALE 12500
SCALE 15000
¢ }
SP148684 | L
(19.06ha) “ tA
g :
' a
> =oeral |
fC Lora
a | © sprsz0v
LoT3 i
ppastaea =f
\ Lor? yo Spe
\ _RP887963
‘EXISTING ENERGEX AERIAL POWER LINES TO BE
UPGRADED (NOTE 2)
EXISTING METER BOX TO BE UPGRADED FOR NBN METERING
PROPOSED NBN SUBMAIN
EXISTING VEHICLES PROPOSED TO BE MOVED BY LANDOWNER
PROPOSED ACCESS TRACK
PROPOSEC NBN CONSTRUCTION AREA
PROPOSED NBN SITE
‘EXISTING CONTAINER PROPOSED TO BE
RELOCATED DURING CONSTRUCTION BY NBN
1. THE NBN ELECTRICAL ROUTE SHOWN ON THE
DRAWINGS IS INDICATIVE ONLY. ELECTRICAL
‘CONSENT IS NOT OBTAINED, ENERGEX WILL
INSTALL NEW AERIAL POWER LINES ON ROAD
RESERVE AT NBN’S COST. ENERGEX MAY
REQUIRE NBN TO TO VEGETATION CLEARING.
Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.