Council archive · source document
08/0749 - Op Works - Dam [As Published] · 142008.749
28" April 2008 Sunshine Coast Regional Council PO Box 141 Tewantin 4565 Attn : Tracey Arthur Senior Planning Officer Re: Your Reference 06/2596 Please find enclosed our new development application for operational works to install rural dams on 56 Beechtree Road, Black Mountain. We have enclosed a cheque for $787.50 being 75% of the advised application cost of $1050.00. ( Reduction in fees approved by Mark Lewis ) We would request that council consider a further reduction of the fees for the renewed application on the basis that no complete assessment was made on the original application, with fees paid in the initial instance of $780. We thank you for your patience and await your response. Yours faithfully, Bob McCdsker PO Box 1222 Gladstone 4680 ( mob phone 0408 372 708 )
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 15 pages
Page 2
ee
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Form 1 Development Application
Part A
Common details
OTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.
Applicant détails (The Applica is the person responsible for making the apphcaton and need not be the owner of the land. The Applicant is responsibte for ensuring the
Je‘ormasan prowded on the IDAS Appiice"9n Form is correct. Thrs xv‘ormenon is fe! ed upon by the Assessment Manager and any referral agencies when assessing and
Sdeuid'ng this application By lodging tvs eppiicaton, the Appicent incurs the ob! gaions and responsib'“ies prescribed by the IPA. Any development permit or pre“nt-nary
approval that may be issued a8 a Consequence of this apptca'.on w.5 be issued lo the App*cant.}
Company/organisation name (if applicable) [
Individual applicant/Contact person (If there is more than one applicant, provide additional applicant details on an attachment to this form)
Title (wr | First name Lastname |McCosker
Postal address [Po Box 1125 , Gladstone .Qld 4680
Contact telephone number 107 49700100 Mobile phone number 0408 372 708
Facsimile number 07 49722304 e-mail address [email protected]
Details of the premises (ie the land on whch the development is propased = refer ta he advice atthe end of the form) oe }
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A Ifthe application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.
| Name of each local goverment area in which the mobile and temporary ERA is proposed to operate
{1
OR
Table 8 Street address for the premises (tick applicable bax/es below and insert property description in the table. Identify each lot in a separate row.)
(i) {XJ Street address / lot on plan for the premises (Appropriate for most applications including building applications), OF
(i) [7] Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty,
pontoon etc) (Note: Loton plan details may be obtained from tite documents, a ‘Rate’ notice, or from the local government.)
} Street Address Lot on pian description
Ta Seer Blan type and Local government area (e.g. Logan, |
No. | No. Street Name and official suburbflocality name | Post Code} Lot NO. | pian Number Caims)
4 56 BEECHTREE ROAD.BLACK MOUNTAIN 4563 4 849480 SUNSHINE COAST
AND/OR
Table C Coordinates and/or a map of the premises (Appropriate for development in remote afeas, over part of a fot, in water (e.g. channel dredging in Moreton
Bay) etc.)
Coordinates
{Note: place each set of coordinates in a separate row) Zone Local government area
: , : . Reference Datum (if applicable)
Easting Northing Latitude Longitude
1 ([] depass
C1 weses
O Other -
2. Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)
Page 3
INTEGRATED PLANNING ACT 1997 : Part A, Version 3,1, 3 March 2008 Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal) Name of water body, watercourse or aquifer (If known) [1 [wa Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994 Lot on pian description for strategic port land Port Authority for the lot [1 [wa Table F Complete if the premises are in tidal water Name of local government for the tidal area (if applicable) Name of port authority for the tidal area (if applicable) [4 [Na 3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water) Total area of premises 8.00 LJ? hectares (Tick applicable unit) Existing use of the premises ] 4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.) [1 | VACANT LAND | §. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)? & No O Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application Proposal details ] 6. Brief description of the proposal (e.g. 6 unit apartment building, 30 Jot residential subdivision, a bore, aquaculture) Development Permit for Operational Works - Dam Construction 7. Does the poposal include new buildings or operational work (including any services) on the premises? No Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application [Resource entitlement (if appicab’e) further information is provided in the advice section at the end of the form ] 8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application involves State land (leased and freehold), declared Fish Habital areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.} &) No - Goto a9 oO Yes -Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource allocation or entitlement must be submitted with the application. You do nat need to answer Q9 - go to the next section. Owner's consent (if appiicable) - further information is provided i the advice section at the end of the form * 9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management Act 1995, or work on rail corridor land defined under the Transport Infrastructure Act 1994 - provide details for each owner on a Separate row, or on an attachment to this form if applicable. Date consent Premises Owner's name/s Details of the premises owned Table H . was obtained ‘ . and postal address (street address or lot on plan description) Owner's signature 1 NIA * Owner's signature cannot be provided on the farm if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a company may sign as owner. Templates for the provision of owner's consent are available on the IPA website . F . - ‘Attachments and supporting information (Compiete Table! - Use a separate row for each type of attachment or information, including information required tunes this Part) Please ensure all documentation submitted with this form, inckxding other Parts of Form 1, or owner's consent, etc, are securely attached to this Part of the Form. Description of attachment or information — Ti . . itle (if applicable) Method of delivery to Table | feg. Pan c of Form . omar consent entece of resource (e.g. Geners! Aahoniy. James Sveet Trafic Repo) Date essment manager
Page 4
INTEGRATED PLANNING ACT 1997 Part A, Version 21,3 March 2008
‘Portable Long Service Leave (PLSL) levy (Ape'ccbie lor certain bu:ktag and corsstuction work valued over $80,000 ony) mY
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: { Tick box if applicable)
LJ the application seeks a preliminary approval only;
[BX] the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1997, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes. land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);
[X] all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(J the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a Ql.eave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
Sighted by the assessment manager before a development permit can be given,
11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
BX) No = Endot Part a
(1s Yes - Answer Q12 below
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
Fee ($) Date received Receiving officers Reference
name numbers
{ NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER |
To: Council. | have been engaged as the private certifier for the building work referred to in this application.
Date of Name BSA Certification number | Building classification’s
engagement
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private cestifier if applicable)
Date receipted
Description of the work QLeave Project Number | Amount paid ($)} Date paid fom sighted PY Name of offer who sighted the
manager
{1
Privacy Statement
The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP} in accordance with the processing and assessment of your Application,
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legisiation (including the Freedom of Information Act 1992) or as
required by Parliament. This information may be Stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.
Advice for completing Part A
General advice
. Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible
for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an apptication that is not properly made.
. The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.
Applicant details
° If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.
Page 5
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Details of the premises
The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and fand (whether or not a building or other
structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.
Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. instead complete
Table A.
The premises may be identified in a number of ways --
e Street address and lot on plan are most common and will apply to most applications.
« Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other
(specified) datum such as Zone Reference or GS84 may be provided.
The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.
StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand.
StrategicPortLandis declared under the Transport infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on
strategic port land) and the Queensland Transport (Ports) website.
“Tidal water’ is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic
port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water
mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless
provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection
Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and
deciding applications for prescribed tidal works within the focal government tidal area, and the planning scheme may be applied to that
assessment (to the extent provided for in the code for prescribed tidal work).
Resource entitlement
Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the /ntegrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
Regulation. Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence.
For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.
For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
Evidence may be required from more than one Department responsible for a State-owned resource, @.g. from the Environmental Pratection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.
Owner's consent
Section 3,2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the
application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the Transport Infrastructure Act 1994,
Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.
“Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
teceive the rent for the {and (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.
Portable Long Service Leave (PLSL) Levy
The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensland,
The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry
(Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.
The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
Pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.
The PLSL tevy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued.
The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www.dleave.qid.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web:
www. gleave.qid.gov.au }
Page 6
Part E, Version 3,1, 3 March 2008
Part E
Building &/or operational works assessable
against a planning scheme
(Nature of the works |
1. Nature of work that requires assessment against a planning scheme:
(J Building work - Complete Table A LX] Operational work - Complete Table B
Table B
(i) Whatis the nature of the operational work?
(FD Roadworks (1 Stormwater ([] Water infrastructure [LJ Sewerage infrastructure
{_] Landscaping (7) Earthworks [[] Drainage Works LJ Signage
(7) Clearing vegetation under the planning scheme XX] Other - Specify below
Rural Dam Construction
{ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question {i} above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
[X] Development Permit (2 Preliminary approval L] Both (Specify below)
(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
IX] No [| Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.9. Development Permit or Preliminary Appraval for MCU ar reconfiguring
alot)
[XI No [] Yes - Complete Table B(a)
2. What is the dollar value of this operational work? (i.e. the total value including GST, materials and labour) |$ 26000
Mandatory Information |
3. Confirm that the following mandatory information accompanies this application
“od ent of Method of lodgement
Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the . ,
extent of any cut and fit) [X] Confirmed — | mail
OFFICE USE ONLY
Date Received Reference Numbers
Advice for completing Part E
General advice
je Part A must also be completed for all IDAS development applications.
. The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.
Q1 A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur
Page 7
# f a / ; 7 fn oo x
\ f ee! ts d i /
Nu 4, ya
~Yamee - . fey) |
ah ne rf of aks
: Bushings Aaa Th
ky Fe J “ an /
/ Jy a oe he NF
TE OMT.
= EGN | ,
/
La
Tae
/)
fff 4
RY i
it 6 WY Ul
YEE
Wt
op
/ /
if
LICENSC® JAHD & ENGINEERING
Sur ivigiod a Fearing | Comeultomts (F if ob
Page 8
. GF M4 McCOSKER CONTRACTING PTY. LTD. CALCULATION SHEET Project title: . Noes ric. Dae a .-. Job No: Description: TAHP ICAt K~SECFIOA/E Date: / fu fob Page: . t
Page 9
M McC OSKER CALCULATION SHEET Project title:,§ ee toe 2 a. dob No: Description. _. _. oe ee ee eee eee --- Datet Page:.<.. of 2
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 34 March 2008 \ AS _Form 1 Development Application IDAS Assessment Checklist IDAS Development Application Form 1 is the approved form for all development appfications under the integrated Planning Act 1997 PA). Form 1 is made up of various Parts. Part A (Common details) of Form 1 must be completed for all applications. The relevance of other Parts of Form 1 depends on the nature of the application. Form 1 also includes the IDAS Assessment Checklist, which is used to assist in determining State assessment and referral requirements, and the Parts of Form 1 relevant to the application, Section 1 and all other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, must be completed for all development applications except those proposed on land in an urban development area, or for building work requiring assessment against the Building Act 1975 only. For more information about development applications on land in an urban development area, refer to www.ulda.gid.gov.au. For more advice about building applications refer to Part B of the IDAS Application Form. Answering the fallowing questions will assist you in determining which sections of the checklist must be completed for your application. For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of tis checklist Does the application seek approval to materially change use of the premises? CYes |pRNo ifyes - complete Section 2 of this checklist Does the application seek approval to reconfigure a lot? Yes |52No ‘yes - complete Section 3 of this checklist and Part F of IDAS Application Farin 1. Assessment is by the focal government. Does the application seek approval to carry out operational work? if yes - complete Section 4 of this checklist Yes |[JNo Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Coes |BRNo if yes - complete Section 5 of this checklist Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application? if yes - complete Section 6 of this checklist, OYes |—k)No Does the application seek approval to carry out building work requiring assessment against a local government planning scheme? OYes |KNo if yes - complete Part E of IDAS Application Form 1. Assessment is by the local government. Does the application seek approval to carry out building work requiring assessment against the Building Act 1975? if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. OYes |[XJNo Assessment is by a building certifier SECTION 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist. [HERITAGE | 11 Answer both A and B below. A |s any part of the proposal intended to be carried out on a Queensland Heritage place under the Queensland Heritage Act 1992? IX] No - Gots LJ Yes
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
B Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
{development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered
in a Local Heritage Register under Part 7B of the Queensland Heritage Act 1992?
4] No - Goto Q1.2 O Yes - (Complete Form 1, Part C,) This application requires assessment by the relevant local government against the IDAS
Cade in the Queensland Heritage Regulation 2003. if the development involves building work and the local
government is not the Assessment Manager for the application, the focal government has jurisdiction as Concurrence
Agency.
Tae Bed cE oy a a oa BG
[REMOVING QUARRY MATERIAL; WILD RIVER AREA |
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
IX} No-Gotwar3 [_] Yes
IPA, schesiute 8 part 1 table $. tom 7, 1P Reyulaten schedule 2, table 2. dem 11, 1P Regulation, schedute 1 table 5, tem 2 (wid uver area}; Water Act 2000,
Section 9660, Wid Rivers Aci 2005 section 3A
[ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA |
13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
PX] No-Gotonr4 {[] Yes
IPA scesdoie 3 pant tiabhe’ em 7 eA schedule d pat} table $ dems 3 cnd 4 {P Reguia wenedute 2 rable 7 toms Pand 2. binonmemal Prutcchen Act 1994, section
TRAA twaid iv ate) And Rivers Act /005 secuan 434 seie .ant wel iver declarauon, Wild Rivers Cade
WITHIN THE LIMITS OF A PORT |
1.4 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
[IX] No - Goto. 01.5
(1 Yes
IP Requatan schedute 2. tabio 2 tems fs ane 16
DECLARED FISH HABITAT AREA |
16 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
KX] No - Gow ars
oO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation. schedule 2. table 2 dem 26
‘COMMUNITY INFRASTRUCTURE ‘1
16 Is any part of the premises designated for community infrastructure?
[IX] No -Got0.01.7
LJ Yes
IP Regulation scnegite 3 faite d teat 7
WASTE WATER MANAGEMENT }
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
[XJ No - nd of Section? {[_] Yes
JP Regulation schedule 2 table 3 tem §
IS ECTION 4 - Section 4 must be completed when the application seeks approval to carry out operational work.
‘PLANNING SCHEME |
41 Is any of the proposed operational work assessable under a planning scheme?
LJ No - Go to. Q4.2 DX] Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
‘STATE-CONTROLLED ROAD 4]
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No
(Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
K] No - Gotoasr2
oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regiedbon SfeGie tat 2 fend et Re nadben 3 Mien 2 lah sien Tae
‘ACID SULFATE SOILS ]
4.1.2 |s any of the operational work proposed in a local government area listed*’ in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
BX] No - Got 04.13 (7 Yes
4Taurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Catfiope, Caloundra, Cardwell, Carpentaria, Cook, Cootoola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
IP Requ.ation schedule 2. table 3 den 4 State Pianeing Polwy 202) Fiannng und Manuyss; Devetopmeni vivelving Aud Scifaie Sovy secon 3 6
|EASEMENTS AND SUBSTATIONS \
4.1.3 Is any of the proposed operational work for filling or excavation?
(C1 No - Goto Qa.14
Yes
If yes, is the filling or excavation associated with reconfiguring a lot?
(J Yes - Goto 94.1.4
DX] No - Answer both (a) and (b) below
(a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994?
X] No
C] Yes
(b) !s any of the operational work proposed to be located within 10m of a substation site under the Electricity
Act 1994?
& No oO Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
IP Regulation, schedule 2, table 4 teu f(a), #P Regulation, schedule 2 table 3 den 10{b)
4.1.4 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
BX] No -Gotoa415 (] Yes
JP Regulation scheriia 2 table 3 ten dy
[PUBLIC PASSENGER TRANSPORT |
4.1.5 Is any of the proposed operational work listed in schedule 13C of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
Dd No- Go to 04.1.6 (J Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Requauion schedule 2 table 3. tem 14
[RAILWAY SAFETY AND EFFICIENCY ]
4.1.6 Is any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
[X] No- Goto 04.1.7 LJ Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Regulation scheme 2 bible 4 dem 15
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
_
KOALA CONSERVATION
ara ——
]
4.1.7 s any part of the premises in a koala conservation area or koala sustainability area?
X] No -Gotoas2 [_] Yes
IP RYE Oh sched 2 late 3 tem 1s
WILD RIVER AREA - Although legislation provides for assessment of operational works for residential, commercial and industrial
development for the purposes of the Wild Rivers Act 2005, currently no declarations for any of the wild river areas apply the Wild Rivers
code to that type of development.
we
/ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
AREA
4.2 ls any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
(XJ No -Gotoas3 [_] Yes
IPA, schedule 8, part i, table 4 don 2, IP Regulation, schedule 1, part 2. table 5, tens Uc)
Wild Rivers code (Nole’ the code does not currently contain applicable provisions for residential industiat or commercial development mide a designated urban
asea)
(VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA ]
4.3 ls any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
XX] No -cowars (] Yes
IPA scheaine 3 path) table ditenis TA 1G, HE Regubihon ysRedile 2 tahie 6 dete d (vogeiaton evar) IP Requiauon sehedaik ¢ tithe 2 deny 34 (kode
Lenservatant 1 Reguith me schedule) pat 3 tabled tend peegetaitan cientig wid aver area? Vegetation MM aageinenit Act T4Q2 se ton 22A (vegetation
cleannylert: vet 2d) Wid Rivets AC 2004 sections JTF and 43a
(TAKING OR INTERFERING WITH WATER; WILD RIVER AREA 1
44 ts any of the proposed operational work for any thing constructed or installed that allows, under the Waler Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water, and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
& No -GotoQ4.5 O Yes - Answer (a) and (b} below
IPA, scheguic A part | labig tows
area), Wid Rwers Act 200 seria
(DIP Rogulaioe, seredil’ 2 table 2 fein 8 IP Regulation seheanle F parts table t tems 4 and 3A Weter Act 7000 serton GobA yu cot
| relewaat wilt iver declurahon, Wid Rivers Cate
45 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water}?
] No Goto 04.6 O Yes - (Complete Form 1, Part K;) This application requires assessment by the Department of Natural Resources and Water
(NRW). IFNRW is nol the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA schetide 8 part 1 table 4 agit ob) IP Regwtahon schedule ? sable 2 teri 31 Ruyuration seheda'e T part 3. tabie 4, ton. 3
Wid Rivers cutie (Note. the Code Goes nat Cui nthy (OMEO dppaceke prosiOns Jol takiiy oF mtertenny wl anesian water)
46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[X] No -Gotoas7 (_] Yes - Answer (a) and (b} below
IPA senea ot B pitt table 4,
Me Rivers ALE AUPE see
D Setiredin 2 hatte 2 PR AY Re gquilahge ye Pour TD pee? bie tenn 3 Water Act 2009 soctut YOGA byild pone ate a?
WOME APE yet de
47 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water}?
No -Gotoa1s [(] Yes
IPA sche
Water Ar
Vid Beer
B pot tate 4d dem Fejty) IP Revotat on scRedele oo tabiv 2. a
section S66A (maid nver ated) (Ncte. qu current Vid River dec
cade {Note the cage does not cunenty comer applicable prowess tor Suk 4
3 IP Reaiotor subtedue 1 part 3 lati haient 3
Zanes tdkeng or nitertenng wil subaiestitt vuler as dssessalle)
se se water)
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water}?
DX] No -Gotoa49 [[] Yes - Answer both (a) and (b) below
Page 14
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
FA sto s Dt tyne a He} dud SOD IP Reqnateon Shed 6 PN ede elton set cd part do kebee 4 deer A Niet Act 2000 oo tas SOB a!
pesado Ao wb a Mad Reer fae
49 \s the proposed operational work for the following?
{i) For the construction of a referable dam as defined under the Water Act 2000 [% No 0 Yes
(ii) To increase the storage capacity of a referable dam by more than 10% [] No DO Yes
If yes to either or both (i) or (ii) above - (Complete torn 1. Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is nol the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
PA scRetde o pert Plane d lem 1 IP Reguiauou sehednin 2 halle 2 den 1)
(TIDAL WORK; WILD RIVER AREA . ~ 7
4.10 ts any of the proposed operational work tidal work, other than excluded work defined under the IPA?
DX] No -Gotoo4.11 ([] Yes - Answer (a) and {b) below
IPA schedule 8, vart 1, table 4, dem 4 IP Regulation, schedule 2 table 2 tems 12, M4 and 17, 1P Regulation, schedule 1, paut 3, table 4, teins 4A and 5
Coastal Protectiun and Management Act 1995. section 104A (itd tiver areaj
(COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA |
411 ls any of the operational work proposed to be carried out within a coastal management district?
IX) No -Gowaaiz [Yes
IPA schedule 8 part 1 table 4, xem 4 (P Regutavun, schedule 2 able 2. dems 12 and 14 IP Reguiation scheduie 1 part 3. table 4, tems IA and §
Coastal Prutecuon and Management Act 1995 Act 1995, section 104A (wild river area); Wid Rivers Act 2005 section 43A
WATERWAY BARRIER WORKS; WILD RIVER AREA ]
4.12 ls any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No -Gota413 [_] Yes
DA a ad Li
Row :
% ea Woda TESA
ote NT A
ase SHURE CULE) Rage UNCUT I Ener det 28
wn ik
Ts bart fob nid Ko
DECLARED FISH HABITAT AREA; WILD RIVER AREA |
4.13 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
No -GotoQa.14
(J Yes
IPA scheme 8 pat) Mabie 1 tent. IPA schirbile R par 2 lable 4 don 3) Fisheries Requtson 1999 9 113A (seit asseusrible ones), IP Reguaben, schediite 2 1 ahle 2 tern 8 WP
Reyetoton, schedute b part t talae 1 tem 7 ACU Rivers Bvt 20RD oeabotn S4A Feterits Act sector (ebC ay kd iver cre ad
(REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA |
4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
KK] No -Gotoaa1s [] Yes
BP Royrtited stot
Bb 2 ton ee
fanens Widdd Rind st ete
WILD RIVER AREA |
4.15 {s any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
KX] No -Gotwa16 (_] Yes
IPA schedule 8 part tabie 4, ten 10 IP Regulation schedulr 2 table 2 tem 37 Wid Rivers Act 7005, sections 42. 13A
STATE-CONTROLLED ROAD |
4.16 ls any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
DX] No -Endofsectiona ((] Yes
IP Requsation: schedille 2 table 2 dem 4
Page 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008 Disclaimer: While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances. To the full extent permitted by law DIP expressly disctaims all liability (including but not limited to liability for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your reliance on this process and the information contained on this form.
Page 16
Sunshine Coast
Regional Council
APPLICATION AND GENE
Application Fees
RAL FEES:
DEVELOMMENT FEES & CONTRIBUTIONS
(Cashier: Please Return to Admin Officer, Development)
AMOUNT. —
RECEIPT TYPE |
BONDS - Bond Refund Details
540
Road / Drainage Plan Exam
Road / Drainage Field Inspection
Legal Document Examination
Sealing Fee - Survey Plans, Legal Documents
Payee Name:
Address:
Sale of Documents, Policy Lists, Misc
Bonding Admin Fee (Contributions, uncompleted works}
Closed Circuit TV Inspection
Pre-lodgement Meeting Fee
Developer Contribution - Road Other than PSP
Developer Contribution ~ Drainage Other than PSP
Developer Contribution - Pathway Other than PSP
ICS - Water Supply (PSP)
Total of Fees Paid (Excluding Bonds)
| CPE-Date:
Security Deposits/Performance/Maintenance/Uncompleted Works Bond
Total of Fees Paid (Including Bonds)
P-JLand DevelopmentFEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc
556
CALCULATIONS
Lot Calculation
Plan Examination Calculation
Inspection Calculation
| ROADWORKS CONTRIBUTIONS __
614
51 (Cat 9)
561
557 Road/Section:
681 TION;DETAI
Development Location:
-APPLICATIONIDETAILS _. _ |
Payee Name: ZA - YN 7 Coskor
Address: ? © Cera I22Z
C rao stove
USO -
File Numbers or Reference:
ye. ZOOS OMA. \
Date application properly made:
Receipt No: 204 704 _[ Receipt Date: (7-H “OO |
U
Used in these records
08/0749 - Op Works - Dam [As Published]Related documentApplication case desk ↗
About this file
- File size
- 970 KB (small file)
- File type
No other editions are linked here.