Council archive · source document
08/0749 - Op Works - Dam [As Published] · 142008.749
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
FA sto s Dt tyne a He} dud SOD IP Reqnateon Shed 6 PN ede elton set cd part do kebee 4 deer A Niet Act 2000 oo tas SOB a!
pesado Ao wb a Mad Reer fae
49 \s the proposed operational work for the following?
{i) For the construction of a referable dam as defined under the Water Act 2000 [% No 0 Yes
(ii) To increase the storage capacity of a referable dam by more than 10% [] No DO Yes
If yes to either or both (i) or (ii) above - (Complete torn 1. Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is nol the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
PA scRetde o pert Plane d lem 1 IP Reguiauou sehednin 2 halle 2 den 1)
(TIDAL WORK; WILD RIVER AREA . ~ 7
4.10 ts any of the proposed operational work tidal work, other than excluded work defined under the IPA?
DX] No -Gotoo4.11 ([] Yes - Answer (a) and {b) below
IPA schedule 8, vart 1, table 4, dem 4 IP Regulation, schedule 2 table 2 tems 12, M4 and 17, 1P Regulation, schedule 1, paut 3, table 4, teins 4A and 5
Coastal Protectiun and Management Act 1995. section 104A (itd tiver areaj
(COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA |
411 ls any of the operational work proposed to be carried out within a coastal management district?
IX) No -Gowaaiz [Yes
IPA schedule 8 part 1 table 4, xem 4 (P Regutavun, schedule 2 able 2. dems 12 and 14 IP Reguiation scheduie 1 part 3. table 4, tems IA and §
Coastal Prutecuon and Management Act 1995 Act 1995, section 104A (wild river area); Wid Rivers Act 2005 section 43A
WATERWAY BARRIER WORKS; WILD RIVER AREA ]
4.12 ls any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No -Gota413 [_] Yes
DA a ad Li
Row :
% ea Woda TESA
ote NT A
ase SHURE CULE) Rage UNCUT I Ener det 28
wn ik
Ts bart fob nid Ko
DECLARED FISH HABITAT AREA; WILD RIVER AREA |
4.13 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
No -GotoQa.14
(J Yes
IPA scheme 8 pat) Mabie 1 tent. IPA schirbile R par 2 lable 4 don 3) Fisheries Requtson 1999 9 113A (seit asseusrible ones), IP Reguaben, schediite 2 1 ahle 2 tern 8 WP
Reyetoton, schedute b part t talae 1 tem 7 ACU Rivers Bvt 20RD oeabotn S4A Feterits Act sector (ebC ay kd iver cre ad
(REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA |
4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
KK] No -Gotoaa1s [] Yes
BP Royrtited stot
Bb 2 ton ee
fanens Widdd Rind st ete
WILD RIVER AREA |
4.15 {s any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
KX] No -Gotwa16 (_] Yes
IPA schedule 8 part tabie 4, ten 10 IP Regulation schedulr 2 table 2 tem 37 Wid Rivers Act 7005, sections 42. 13A
STATE-CONTROLLED ROAD |
4.16 ls any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
DX] No -Endofsectiona ((] Yes
IP Requsation: schedille 2 table 2 dem 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0749 - Op Works - Dam [As Published]Related documentApplication case desk ↗
About this file
- File size
- 970 KB (small file)
- File type
No other editions are linked here.