Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Stormwater Management Plan

Attached to the e-mail MCU16/0066 & OPW16/0133 - Engineering report & Stormwater Mgmt Plan (2 of 4).

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
am
COVEY

ASSOCIATES PTY LTD

Consulting Engineers

 

STORMWATER MANAGEMENT PLAN
HIGHWAY SERVICE CENTRE
COOROY
FOR
HASS HOLDING ATF THE QUASAR TRUST

DATE: JUNE 2016
PROJECT No: 161968
REPORT No: 100415 RPT ISSUE A

Maroochydore | Gladstone | Rockhampton | Tamworth www.covey.com.au

 
Log in to download the original file

Stormwater Management Plan.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 26 pages

Page 2

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                              Location: Taylor Court, Cooroy


                           DOCUMENT ISSUE APPROVAL

Project No:           161968


Title:                Stormwater Management Plan


Client:               Hass Holdings ATF The Quasar Trust


Date:                 June 2016


Issue:                A


Distribution:         Hass Holdings ATF The Quasar Trust – One (1) copy
                      Noosa Shire Council – One (1) copy
                      Covey Associates Pty Ltd – One (1) copy




© Copyright Covey Associates Pty Ltd (2016).

This document is the property of Covey Associates Pty Ltd. This document and the information
contained in it are solely for the use of the authorised recipient and this document may not be
used, copies of reproduced in whole or part for any purpose other than that for which it was
supplied by Covey Associates Pty Ltd. Covey Associates Pty Ltd makes no representation,
undertakes no duty and accepts no responsibility to any third party who may use or rely upon this
document or the information contained in it.

COPYRIGHT NOTICE:             Parts of this document contain material originally prepared by:

This material is the intellectual property and copyright of Covey Associates Pty Ltd.




Author: Jennifer Mullaney                                 Reviewed: Jade Mohr
MA (Hons), PhD                                            BEng (Civil)




Reviewed: Chris Walker                                    Reviewed: Shane Rynne
BEnvSc, BSc (Hons), PhD, CPESC                            BEng (Civil), GradDipMunEng, MIEAust

Page 3

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                 Location: Taylor Court, Cooroy

                                       CONTENTS

1.0 INTRODUCTION                                                                       1

2.0 SITE DESCRIPTION                                                                   1

    2.1    Site Location                                                               1

    2.2    Previous Land-use, Topography and Drainage                                  2

    2.3    Proposed Land-use                                                           2

3.0 WATER QUALITY AND TREATMENT OBJECTIVES                                             2

    3.1    Water Quality Objectives                                                    3

    3.2    Area of Treatment                                                           3

    3.3    Non-treatment Areas                                                         3

4.0 WATER QUALITY MODELLING ASSESSMENT/APPROACH                                        4

    4.1    Scenario Methodology                                                        4

    4.2    MUSIC Model Parameters                                                      4

    4.3    Land Use/Source Node Areas.                                                 4

    4.4    Proposed Stormwater Treatment Train                                         5

    4.5    Pollutant Reduction Results                                                 5

5.0 MAINTENANCE PERIOD                                                                 6

    5.1 Bioretention Basin                                                             6
   5.1.1 Maintenance During ‘Construction Phase’                                       6

6.0 STORMWATER QUANTITY                                                                6

    6.1    Stormwater Quantity Management                                              6

    6.2    Hydrology (XP-RAFTS)                                                        6

    6.3 XP-RAFTS Data                                                                  7
   6.3.1 Model Scenarios                                                               7
   6.3.2    Rainfall Intensities                                                       7
   6.3.3    Existing and Proposed Development Areas                                    7
   6.3.4    Initial and Continuing Losses                                              7
   6.3.5    Pervious and Impervious Areas                                              8
   6.3.6    Manning’s Values                                                           8
   6.3.7    Catchment Slope                                                            8
   6.3.8    Storm Durations                                                            8

Page 4

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                       Location: Taylor Court, Cooroy
    6.4 Calibration                                                                          8
   6.4.1 Rational Method                                                                     8

    6.5 Design Discharges Unmitigated                                                        9
   6.5.1 Peak Durations                                                                      9

    6.6 Stormwater Detention                                                                 9
   6.6.1  Detention Tank                                                                    10

7.0 CONCLUSIONS AND RECOMMENDATIONS                                                        10

REFERENCES                                                                                 11

______________________________________________________________________________



                              LIST OF APPENDICES
APPENDIX A     Site Layout Plan by Reddog Architects
APPENDIX B     Stormwater Management Plans by Covey Associates
APPENDIX C     MUSIC Concept Map
APPENDIX D     Stormwater Quantity Catchment Plans
APPENDIX E     Rainfall Data, Rational Method Data and Results

Page 5

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                            Location: Taylor Court, Cooroy

1.0 INTRODUCTION
This Stormwater Management Plan (SMP) contains information regarding the stormwater
management strategies for a proposed Highway Service Centre, including a fast food outlet at
Taylor Court, Cooroy. This report refers to the stormwater quality and quantity treatment measures
proposed of the site in its entirety.

Noosa Shire Council (NSC) requires that stormwater be appropriately managed prior to discharge
from the site. The Queensland State Planning Policy (2014) also requires that urban development
projects demonstrate how the potential impacts to receiving environments are mitigated.

2.0 SITE DESCRIPTION
2.1 Site Location

The site is located at 6 Taylor Court, Cooroy. The real property description is Lot 3 on SP197517
(Figure 1). The site is bounded by vacant land to the west and south, Taylor Court exists to the
east and Holts Road and the Bruce Highway to the north (Figure 2). The site is adjacent to the
newly upgraded section of the Bruce Highway.

A Site Plan is presented in Appendix A for additional information and details of the proposed
development.




                                                          Site
                                                          Area




                                       Figure 1 - Site area




Covey Associates Pty Ltd                    1                                     Project No: 161968
Consulting Engineers                                                                 100415 Rpt Iss A

Page 6

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                   Location: Taylor Court, Cooroy




                                               Site
                                               Area




                 Figure 2 - Site Locality (image accessed from Nearmap on 11 August 2015)

2.2 Previous Land-use, Topography and Drainage

The site is currently vacant land and was previously used as a temporary depot for the machinery
used for the upgrade of the Bruce Highway. The site predominantly drains from north to south, with
an approximate slope of 4%.

2.3 Proposed Land-use

The overall site area is approximately 8243m2, with the area of the proposed new development
utilising the entirety of the site. The proposed development for a highway service centre includes
the service station bowsers, fast food outlet, service station, children’s play area, services, truck
parking and associated carparking and landscaped areas.

A Site Plan is located in Appendix A for further detail.

3.0 WATER QUALITY AND TREATMENT OBJECTIVES
This SMP will demonstrate how the proposed stormwater management strategy complies with the
requirements of the Noosa Shire Council (NSC) and the State Planning Policy (2014), in terms of
demonstrating how the relevant stormwater pollutant reduction objectives will be met. Discharge
from the site must achieve pollutant load reduction targets (Table 1) and be demonstrated through
use of the appropriate modeling software.

                      Table 1 – Pollutant Reduction Targets for South East Queensland
          Pollutant Type                                   Reduction Objective
   Total Suspended Solids (TSS)     80% reduction in average annual load of pollutants
   Total Phosphorus (TP)            60% reduction in average annual load of pollutants
   Total Nitrogen (TN)              45% reduction in average annual load of pollutants
   Gross Pollutants (GP)            90% reduction in average annual load of pollutants




Covey Associates Pty Ltd                        2                                        Project No: 161968
Consulting Engineers                                                                        100415 Rpt Iss A

Page 7

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                              Location: Taylor Court, Cooroy


3.1 Water Quality Objectives

The nearest water course to the site is the North Maroochy River and is located within the
Maroochy River Basin Catchment Plan. The Environmental Protection Water Policy 2009 South
East Queensland Map Series (Plan WQ1411) identifies North Maroochy River to be lowland
freshwaters. Table 2 outlines the specific performance criteria required within lowland freshwaters
in the Maroochy River Basin Environmental Values and Water Quality Objectives – Basin No. 141
(part) including all tributaries of the Maroochy River (Department of Environment and Resource
Management, 2010).

                                   Table 2 – Site Stormwater Quality Objectives
                                Pollutant                 Water Quality Objectives
                                                           Lowland Freshwater Values
                           Suspended Solids (SS)   <6 mg/L (annual mean concentration)
                           Total Phosphorus        <50 µg/L (annual mean concentration)
                           Total Nitrogen          <500 µg/L (annual mean concentration)
                           Turbidity               <10 NTU
                                                   Aim for no visible oils, petrochemicals, films
                           Hydrocarbons
                                                   or odours
                           Dissolved Oxygen        85 – 110 % saturation
                           Chlorophyll-a           5 µg/l
                           pH                      6.5 – 8.0
                           Litter                  Aim for no anthropogenic material greater
                                                   than 5 mm in any dimension.


3.2 Area of Treatment

The total area of the site to be treated is approximately of 8243 m2. The site has been modelled as
one (1) catchment. The catchment consists of the north exit point, south entrance and exit road,
car and truck parking, service area and food outlets and the landscaped areas. Refer to the Site
Plan in Appendix A for further details.

3.3 Non-treatment Areas

The southern entry/exit point at the site onto Taylor court is unable to be treated due to the site
topography. This area comprises 673 m2 of the site and is not considered likely to cause adverse
impacts to the surrounding environment due to its small area. This area has been included within
the model as untreated road and untreated landscaping area. Refer to Figure 3 for details on the
untreated area.




Covey Associates Pty Ltd                              3                                             Project No: 161968
Consulting Engineers                                                                                   100415 Rpt Iss A

Page 8

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                            Location: Taylor Court, Cooroy




                           Treated Area

                                                                     Untreated Area




                                          Figure 3 Catchment Areas

4.0 WATER QUALITY MODELLING ASSESSMENT/APPROACH
4.1 Scenario Methodology

The site was modelled using split catchment source nodes, comprised of roof area, road area and
groundcover nodes. The hardstand area of pavement and play-park has been modelled as
groundcover at 100% impervious. The stormwater treatment proposed for the site consists of one
(1) bioretention basin.

The runoff within the area beneath the service station bowser canopy will be captured by a grated
channel surrounding the area and directed to a holding tank. This will reduce the risk of any
potential runoff containing hydrocarbons entering the stormwater network in the event of a spill.
The holding tank will be monitored and emptied when required, particularly prior to a large rain
event. Roof Runoff from the canopy will be directed to the bioretention basin for treatment.

Refer to Stormwater Quality Management Plan in Appendix B.

4.2 MUSIC Model Parameters

The MUSIC Modelling Guidelines – South East Queensland Version 1.0 (2010) was used to
source base and storm flow concentrations and runoff generation. The model was calibrated using
the Bureau of Meteorology (BOM) data from Cooroy Composite, 1973 - 1983, at a 6-minute time
step. This is in accordance with Water by Design’s MUSIC Modelling Guidelines – South East
Queensland Version 1.0 (2010). All source nodes were set up in accordance with this guideline,
specifically for split catchments. The source nodes were set up as ‘commercial’ due to the site
characteristics being similar to those in a commercial area. No routing of drainage links was
adopted for the purpose of taking a conservative approach. This approach assumes that the flow
through the drainage system takes no time, which over estimates the likely pollutant load.

4.3 Land Use/Source Node Areas.

The proposed development has been treated as one (1) catchment. The catchment has further
been divided into contributing roof, landscaping, hardstand and road area. Refer to Table 3 for
details. A MUSIC model concept map is located in Appendix C.
Covey Associates Pty Ltd                         4                                Project No: 161968
Consulting Engineers                                                                 100415 Rpt Iss A

Page 9

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                         Location: Taylor Court, Cooroy

                                Table 3 – MUSIC Source Node Attribute Summary
                                                                        Area
                                         Source Node
                                                                         (ha)
                                              Roof                      0.096
                                             Road                       0.437
                                          Landscaping                   0.181
                                           Hardstand                    0.042
                                        Untreated Road                  0.054
                                     Untreated Landscaping              0.013
                                             Total                      0.823

4.4 Proposed Stormwater Treatment Train

The development has been modelled as one (1) catchment with the following mitigation measures
proposed. Refer to Stormwater Management Plans in Appendix B for details.

Stormwater runoff from the site will be treated by a Bioretention Basin prior to discharge off site.
Refer to Table 4 for bioretention basin sizing. Filter media is established to a depth of 0.5 m, with a
0.1 m and 0.2 m transition and drainage layer, respectively. The extended detention depth is 0.3
m.

                             Table 4 –Type and Size of Stormwater Treatment Device
            Stormwater Treatment Device         Detail
            Catchment 1
            Bioretention basin                            115 m2 Surface Area, 115 m2 Filter Area

4.5 Pollutant Reduction Results

MUSIC modelling of the proposed stormwater treatment strategy for the site was performed to
ensure the identified load based pollutant reduction objectives were achieved. MUSIC version 6.2
has been used to model the effectiveness of the designed stormwater treatment trains.

The target reductions in stormwater pollutants are based on a comparison of an unmitigated
scenario i.e. having no treatment on site, and the mitigated scenario, which has stormwater
treatment measures incorporated into the site. The results of the MUSIC models for the each
catchment and the overall site can be found in Table 5 and demonstrate that compliance has been
met or exceeded for all the required pollutant load reduction objectives stated in the State Planning
Policy (2014) at catchment and site level.

                             Table 5 – MUSIC Results –Treatment Train Effectiveness
                                                              Reduction          Target
                           Unmitigated      Mitigated
      Pollutant                                               Achieved          Reduction       Compliance
                             (kg/yr)         (kg/yr)
                                                                 (%)               (%)
          TSS                 3380             687                 80               80               Y
           TP                 6.54             1.61                75               60               Y
           TN                 35.3             14.8                58               45               Y
          GP                  234              19.7                92               90               Y

As the results in Table 5 demonstrates, the stormwater quality management strategies proposed
for the proposed Highway Service Station meet or exceed the target reduction rates required by
the NSC and the State Planning Policy (2014).




Covey Associates Pty Ltd                              5                                        Project No: 161968
Consulting Engineers                                                                              100415 Rpt Iss A

Page 10

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                               Location: Taylor Court, Cooroy


5.0 MAINTENANCE PERIOD
5.1 Bioretention Basin

The proposed bioretention basin will require consideration and management during both the
construction and operational phases of the development. In order to establish vegetation and
treatment functions in the bioretention system, the filter media must be protected from pollutants
commonly generated in the construction phases. During the operational phase, regular
maintenance of bioretention system is required to ensure comprehensive vegetation
establishment, a critical component in stormwater pollutant uptake. Below are details on the
general maintenance periods and requirements for the construction and operational periods.

5.1.1 Maintenance During ‘Construction Phase’

Erosion and sediment control devices will be installed at the commencement of all the staged
works to capture and treat runoff during construction works. The sediment control devices should
be cleaned out as required and at the end of the works. During the construction stage, all sediment
control devices are to be inspected weekly, after runoff generating rain events and prior and after
prolonged site shut downs (e.g. holiday periods).

Following construction of the roadways and buildings on site the basin will be constructed to the
final design and filter media layers and plants will be installed. Leaving the completion of the
bioretention basin until after construction is completed will prevent any potential clogging of the
system during the construction period.

6.0 STORMWATER QUANTITY
The proposed stormwater quantity management for this site ensures non-worsening of flows as a
result of the proposed development. Development of the site will result in an increase in
impervious area and a corresponding increase in peak stormwater runoff rates which will be
mitigated through on-site detention. This section of the report encompasses the hydrological and
hydraulic analysis for the proposed development and identifies the stormwater detention measures
required to ensure non-worsening conditions.

6.1 Stormwater Quantity Management

An analysis of the stormwater (quantity) required for the site, involved the following processes:

      Determining the overall catchment areas contributing to flow from the proposed development
       site;
      Calculating the 1%, 10% and 39% Annual Exceedance Probability (AEP) peak discharges
       using XP-RAFTS for existing case;
      Rational method calculations for comparison and calibration of the XP-RAFTS runoff model
       to ensure the accuracy of results; and
      XP-RAFTS detention modelling for the 1%, 10% and 39% AEP design discharges to
       demonstrate that peak discharges are mitigated in the developed case and flows leaving the
       site are ‘non-worsening’.

6.2 Hydrology (XP-RAFTS)

XP-RAFTS was utilised to determine the peak stormwater discharges for the subject site for pre-
development and post-development scenarios.



Covey Associates Pty Ltd                     6                                       Project No: 161968
Consulting Engineers                                                                    100415 Rpt Iss A

Page 11

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                             Location: Taylor Court, Cooroy

The proposed development site has an area of 0.824 ha. The site receives a very small upstream
catchment which when combined with the site area gives a total area of 0.924 ha. The majority of
this upstream area is a landscaping buffer between the site and Holts Road.

6.3 XP-RAFTS Data

6.3.1 Model Scenarios

The existing and proposed conditions for the 1%, 10% and 39% AEP events were modelled in XP-
RAFTS to determine the peak stormwater flows for the site.

The three scenarios modelled for this investigation are:

      CSS_E01b - represents the existing characteristics of the subject site (pre-development);
      CSS_D01b - represents the subject site as fully developed (no detention); and
      CSS_M01b - represents the subject site as fully developed and the effects of the proposed
       detention tank.

6.3.2 Rainfall Intensities

The rainfall intensities used in XP-RAFTS are typical to Cooroy and were generated from the
Bureau of Meteorology’s online IFD data website (accessed 30 May 2016). The rainfall intensity
tables are contained in Appendix E.

6.3.3 Existing and Proposed Development Areas

The total catchment area has been modelled as one (1) catchment. The existing and proposed
catchment boundaries are the same for each modelling scenario. Refer to Figure 5 for the
stormwater quantity catchment boundary. Refer to Appendix D for a detailed Stormwater Quantity
Catchment Plan.




                           Figure 5 Stormwater Quantity Catchment Boundaries

6.3.4 Initial and Continuing Losses
Initial and Continuing Rainfall Loss parameters were adopted as per Table 6.




Covey Associates Pty Ltd                      7                                    Project No: 161968
Consulting Engineers                                                                  100415 Rpt Iss A

Page 12

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                           Location: Taylor Court, Cooroy

                                      Table 6 – Initial and Continuing Losses

                                          Pervious Catchments                   Impervious Catchments

                                      Initial Loss       Cont. Loss        Initial Loss           Cont. Loss
                Event                    (mm)             (mm/hr)               (mm)               (mm/hr)
               AEP 1%                     0                 2.5                  0                    0
          AEP 10% and 39%                12.5               2.5                  0                    0

6.3.5 Pervious and Impervious Areas

The proposed development site and external catchment in its existing state has a total area of
0.924 ha and is completely pervious.

The proposed development and external catchment has a total area of 0.924 ha and a proposed
impervious area of 0.63 ha for the developed case, equating to 62%. This will increase total
contributing catchment’s percentage impervious from 0% to 62%.

All pervious and impervious areas for the existing and developed scenarios are detailed in Table 7.

                           Table 7 – Existing and Developed Catchment Areas and Slopes
                 Catchment             Area          Pervious         Impervious          Slope
                                        (ha)             (ha)            (ha)               (%)
                 Existing
                 Site                   0.92             0.92             0                  5
                 Developed
                 Site                   0.92             0.29            0.63                5

The stormwater quantity catchment boundaries are shown in Appendix D.

6.3.6 Manning’s Values

Manning’s values varied due to the differing catchment characteristics / land uses and were
applied independently to the catchment. The values were generally adopted as follows:

     Pervious Area, n = 0.032; and
     Impervious Area, n = 0.018.

6.3.7 Catchment Slope

The Equal Area method was used to determine the catchment slope, which is summarised in
Table 7. The catchment slope in the developed case is unchanged from the existing case scenario.

6.3.8 Storm Durations

Standard storm durations of 15, 20, 25, 30, 45 60 and 90 minutes were modelled to estimate the
peak discharge.

6.4 Calibration

6.4.1 Rational Method

Rational Method calculations were undertaken for the site for calibration of the existing case XP-
RAFTS model – Table 8.

Covey Associates Pty Ltd                             8                                             Project No: 161968
Consulting Engineers                                                                                  100415 Rpt Iss A

Page 13

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                           Location: Taylor Court, Cooroy


Variable         Value           Units
Area:            0.924           ha
Tc               5.9             minutes
C10              0.68            fraction

                                      Table 8 - Rational Method Calculations
                               Variable                1% AEP       10% AEP     39% AEP
                               Freq Factor                1.2         1.0         0.85
                               Intensity (mm/hr)         299.5       205.2       149.1
                               Discharge (m3/s)          0.628       0.358       0.221

The Rational Method Calculations for the 1%, 10% and 39% AEP events generally reflect results
from the XP-RAFTS model. Thus, the XP-RAFTS peak flows have been adopted for hydrological
modelling and detention sizing purposes. A comparison of the results is provided in Table 9.

                           Table 9 - XP-RAFTS and Rational Method Comparison
                                            Rational        XP-RAFTS           Difference
                                AEP          (m3/s)           (m3/s)               (%)
                                 1%          0.628            0.630                0.4
                                10%          0.358            0.357                -0.4
                                39%          0.221            0.219                -1.1

6.5 Design Discharges Unmitigated

6.5.1 Peak Durations

Temporal patterns from Australian Rainfall and Runoff, Volume 2, (1987) have been adopted for
each storm duration. A range of storm durations were analysed to determine the peak discharge
for the catchment. Table 10 presents the flows generated using XP-RAFTS from design storms at
the proposed development site for the existing and developed (unmitigated) case scenarios.

                           Table 10 - XP-RAFTS Design Discharges (Unmitigated)
                                                         Existing                  Developed
                                                                  Peak                       Peak
                                                Critical                       Critical
                  Catchment           AEP                         Flow                       Flow
                                               Duration                       Duration
                                                                 (m3/s)                     (m3/s)
                                      1%           25 min        0.630         15 min       0.724
                      Outlet          10%          60 min        0.357         25 min       0.518
                                      39%          60 min        0.219         25 min       0.331

The peak flows discharging from the site have increased in the developed case scenario due to the
resulting increase in impervious area. To reduce the flows to meet non-worsening conditions, a
detention tank is proposed to increase detention capacity on site and reduce the offsite flows.

6.6     Stormwater Detention

The pre-developed and post-developed (mitigated) conditions were modelled in XP-RAFTS to
demonstrate that stormwater flows will not be increased with the inclusion of an appropriately
designed storage device. The increases in peak flows have been mitigated on site through the use
of a detention tank. Detention provided by the bioretention basin to treat water quality will also be
utilised on site.


Covey Associates Pty Ltd                             9                                           Project No: 161968
Consulting Engineers                                                                                100415 Rpt Iss A

Page 14

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                  Location: Taylor Court, Cooroy

Refer to Site Plans in Appendix B for the proposed detention tank location and details.

6.6.1 Detention Tank

The flows up to 39% AEP will be directed to and will be detained within the proposed bioretention
basin and flow greater than the 39% AEP will be detained within the detention tank located at the
lowest point of the site in the south western corner. A diversion chamber prior to the bioretention
basin inlet will divert all flow above a 39% AEP event to the detention tank. Refer to Stormwater
Management Plan in Appendix B. The bioretention basin has a storage component 1.25 m deep
with a surface area of 115 m2, providing a storage volume of 143.75m3. The proposed detention
tank dimensions are approximately 5 m wide x 10 m long x 2 m high providing a maximum
detention volume of 100 m3. The combined detention volume provided between the bioretention
basin and the detention basin is 243.75 m3 with a minimum available depth of about 2.7 m. The
required detention is 171m3 peaking at a depth of 2.12 m in the 1% AEP event. The tank will slow
release via one (1) 325 mm orifice plate and a weir 1.5 m high and 0.45 m wide discharging into a
chamber and connecting to an existing stormwater network on site. Refer to the Stormwater
Management Plan in Appendix B for detail.

Table 11 summarises stormwater flows, storage volumes and stage height for the required
detention tank.
                           Table 11 - Post-Development Conditions – XP-RAFTS
                             Stormwater Flows for proposed detention basin
                                                              Basin                            Peak
                                     Basin Inflow                        Peak Depth
       Basin               AEP                               Outflow                          Storage
                                       (m3/sec)              (m3/sec)         (m)               (m3)
                           1%            0.724                0.624          2.12               171
     Det_tank              10%           0.518                0.349          1.78               122
                           39%           0.331                0.211          1.45               73

XP-RAFTS modelling predicts that the proposed detention tank will reduce the post-development
peak stormwater flows for all critical storm events. Refer to Table 12 below for detail.

     Table 12 - Comparison of Pre & Post-Development (mitigated) Stormwater flows in XP-RAFTS
                                                  Existing                    Mitigated
          Catchment          AEP         Critical      Peak Flow         Critical   Peak Flow
                                        Duration         (m3/s)         Duration      (m3/s)
                             1%          25 min              0.630       25 min        0.624
            Site Area        10%         25 min              0.357       25 min        0.349
                             39%         60 min              0.219       25 min        0.211

7.0 CONCLUSIONS AND RECOMMENDATIONS
As described in Table 5, the stormwater treatment measures selected for the proposed
development achieve the performance criteria set by the NSC and by the State Planning Policy
(2014). Annual load reductions of TSS, TP and TN between the unmitigated and mitigated MUSIC
model scenarios have been met or exceeded. It is considered that a conservative approach has
been taken as no routing in the drainage links has been adopted.

This site based SWMP has demonstrated that the proposed development, when incorporating the
proposed detention strategies, can be undertaken with non-worsening to the quantity of runoff to
downstream environments.


Covey Associates Pty Ltd                         10                                       Project No: 161968
Consulting Engineers                                                                         100415 Rpt Iss A

Page 15

                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                             Location: Taylor Court, Cooroy

Sufficient consideration of stormwater controls has been demonstrated by:

      Compliance with QUDM (2013)
      Compliance with the requirements of Noosa Shire Council’s Load Based Objectives
      Compliance with the State Planning Policy (2014)
      Compliance with the EPP (Water) 1997
      Ecological sustainability in terms of the development’s impact upon receiving waters and the
       viability of the proposed site development.

The measures proposed within this report to manage stormwater quality and quantity achieve the
nominated requirements of NSC and the State Planning Policy (2014). This preliminary design of
the quality and quantity management measures is based on the current and best-practice
principles.

REFERENCES
Department of Environment and Resource Management (2010) Environmental Protection (Water)
     Policy 2009 – Maroochy River Environmental Values and Water Quality Objectives Basin No,
     141 (part) including all tributaries of the Maroochy River

Department of State Development, Infrastructure and Planning (2014) State Planning Policy,
     Brisbane, Queensland.

Institute of Public Works Engineering Australia, Queensland Division Ltd (2013) Queensland Urban
       Drainage Manual, Third Edition.

Noosa Shire Council (2013) The Noosa Plan

Water by Design (2010) MUSIC Modelling Guidelines – South East Queensland, Version 1.

Water by Design (2014) Bioretention Technical Design Guidelines, Version 1.1.




Covey Associates Pty Ltd                     11                                    Project No: 161968
Consulting Engineers                                                                  100415 Rpt Iss A

Page 16

APPENDIX A

SITE LAYOUT PLAN

Page 17

                                                                                                                                                                                                                     1
                                                                                                                                                                                                                   DA-05

                                                                                                   H O L T S            R O A D




                                               SITE BOUNDARY                                             122° 10' 50"   75.04m                                                                                                                                                                       120° 48' 20"        28.239m




                                     SITE BO




                                                                                                                                                             5,000
                                                                                                                                                                                        S2                                                                                                                                                          S1
                                                                                                                                                                                                                       LANDSCAPING




                                                                                                                                                                        SETBACK
                                                                                                                                                                         10,000




                                                                                                                                                                                                                                                                                                                                                            210° 48' 40"
                                       UNDAR                                                                                                                                                                                              ONE WAY
                                         Y




                                                                                                                                                                                                                                                                                                                                                             27.134m
                                                                                                                                                                              1                                                                                    13


                                                                                                                                                                                                                                                                                                                                                                              EXIT




                                                                                                                                                                                             6,400
                                                                                                                                                                                                        CARPARK




                                                                                                                           WAITING BAY
                                                                                                                                                                                     2,700
                     L O T       1                                             L O T           3                                                                         14                                                          22




                                                                                                                                                                                                                                                                                                                                                                  SITE BOU
                                                                                                                                                                     9No CYLCLE
                                                                                                                                                                      PARKING                                                                 23                                                                                  4,000
                                                                                                                                                                                                                                                                                                                                        K
                                                                                                                                                                                                                                                                                                                                 SETBAC




                                                                                                                                                                                                                                                                                                                                                                           NDARY
                                                                                                                                                                                             OUTDOOR                                                                                                                                                5,000




                                                                                                                                                                                                                                                                                                                                                                                                        T A Y L
                                                                                                                                                                                             DINING AREA
                               2                                                                                                                                                                75 m2
                                                                                                                                                                                                                                                                                                                                                                                                                                       1
                             DA-07                                                                                                                                                                                                                                                                                                  34                                                                                               DA-07
                                               202° 08




                                                                                                                                                                                                                                                                                                                                                                                           FOOT P
                                                                                                                                                                                                                                                                                                                                     AIR AND
                                                                                                                                                         COLLECT
                                                                                     OVERFLOW
                                                                                                                                                                                       FAST2 FOOD




                                                                                                                                                                                                                                      2,600
                                                                                                                                                                                                                                                                                                                                                         FUEL




                                                                                                                           LANDSCAPING
                                                      '




                                                                                                                                                                                                                                                                                                                                                                               202° 30'
                                                                                      PARKING




                                                                                                                                                                                                                                                                                                                                                                                               ATH
                                                                                                                                                                                                                                                                                                                                                         VENTS
                                                              LANDSC




                                                                                                                                                                                                                                                                                                                                         WATER
                                                                                                                                                                                       330 m




                                                                                                                                                                                                                                                                                                                                                                                                          O R
                                                                                                                                                                                                                                                                                                                 UNDERGROUND




                                                                                                                                                                                                                                                                                                                                                             LANDSC
                                                                                                                                                                                                                                                                            SERVICE STATION
                                                     86.32m


                                                                APING




                                                                                                                                                                                                                                                                                                                  FUEL TANKS
                                                                                                                                                                                                         DINING AREA                                                        BOWSERS (8No)




                                                                                                                                                                                                                                                                                                                                                                  APING
                                                                1,088 m2




                                                                                                                                                                                                                                                                                                                                                                                     37.233m
                                                                                                                                                                                                         180 m2

                                                                                                                                                         PAY




                                                                                                                                                                                                                                                                                                                                                                                                             C O U R
                                                                                                                         125 m2
                                                                                                                                         DRIVE THROUGH
                                                                                                                                                                                                                                                                                                                                                                      133 m2
                                                                                                                                                                                                                                                                                                                                               36
                                                                       5,000
                                                                                                                                                                                                                                                          UNDERGROUND
                                                                                                                                                                                                                                                            FUEL TANK
                                                                                                                                                         ORDER




                                                                                                                                                                                                                                                                                                                                                                                                     ENTRY




                                                                                                                                                                                                                                                                                                                                                                                                                  T
                                                                                                                                                                                                                                                                                                                                                                               9,000
                                                                                                                                                                                                                                                                                                                                                                                                     EXIT
                                                                                                                                                                                       SERVICE
                                                                                                                                                                                       STATION
                                                                                                                                                                                          2
                                                                                                                                                                                                                                              33
                                                                                                                                                                                        195 m
                                                                                                                                                                                                         SALES AREA
                                                                                                                                                         PURUSE




                                                                                                                                                                                                         120 m2
                                                                                                                                                                                                                              1         4
                                                                                                                                                                       SERVICE                                               MOTORCYLCLE




                                                                                                                                                                                                                                                                                                                                                                                              5"
                                                                                                                                                                        80 m2                                                   PARKING
                                                                                                                                                                                                     SERVICE BAY




                                                                                                                                                                                                                                                                                                                                                                                          0' 2
                                                                                                                                                                                                                                                                                                                                                                                        °2
                                                                                                                                                                                                                                                                                                                                                                                     242
                                                                                                                                                                                                                                                                   UNDERGROUND




                                                                                                                                                                                                                                                                                                                                                                                 m
                                                                                                                                                                                                                                                                                                                                                                              048
                                                                                                                                                                                                                                                                   DETENTION TANK




                                                                                                                                                                                                                                                                                                                                                                           14.
                                                                                                                                                                                                     ONE WAY                                                                                                            CAPING
                                                                               WATER                                                                                                                                                                                                                           LANDS




                                                                                                                                                                                                                                                                                                      5,000
                                                                               TANK                                                                                                                                                                                                                            434 m2

                                                                                                                                                                                                                                                   BIO RETENTION
                                                                                                                                                                                                                                                        BASIN                                        44.312m
                                                                                                                                                                                                                                                                                            ' 10"
                                                                                       WATER                                                                                                                                                                                         291° 20
                                                                                       TANK           PUMP


                                                                                                                                                 300° 48' 40"              46.768m
                                                                                                                                                                                                                                                                                          (LOT 1)
                                                                                                     BOOSTER
                                                                                                                                                                                                                                                                                     MENT
                                                                                                                                                                                                                                                                               S EASE
                                                                                                                                                                                                                                                                          ACCES
                                                                                                                                                                                                                     1
                                                                                                                                                                                                                   DA-06



                 1   SITE PLAN
                     SCALE - 1:250                                               -




                                                                                                     PRELIMINARY                                                                                                                                                                                                                                                                                                       HIGHWAY SERVICE
                                                                                                                                                                                                                                                         ISSUE          DATE                BY      DESCRIPTION                                     CHKD

                                                                                                                                                                                                                                                         P1             23.05.2016          RP      PRELIMINARY                                     PW



reddogarchitects.com
                                                                                                                                                                                                                                                         P2

                                                                                                                                                                                                                                                         P3
                                                                                                                                                                                                                                                                        25.05.2016

                                                                                                                                                                                                                                                                        31.05.2016
                                                                                                                                                                                                                                                                                            RP

                                                                                                                                                                                                                                                                                            RP
                                                                                                                                                                                                                                                                                                    PRELIMINARY

                                                                                                                                                                                                                                                                                                    PRELIMINARY
                                                                                                                                                                                                                                                                                                                                                    PW

                                                                                                                                                                                                                                                                                                                                                    PW
                                                                                                                                                                                                                                                                                                                                                                                                                       STATION, COOROY
P 07 3252 8912 F 07 3252 8914                                                                                                                                                                                                                            P4             31.05.2016          RP      PRELIMINARY                                     PW                                                                 PROJECT NO.           DRAWING NO.   ISSUE
[email protected]
                                                                                                                                                                                                                                                                                                                                                                                                                       2480-276              DA-02         P4

Page 18

APPENDIX B

STORMWATER QUALITY MANAGEMENT PLANS
BY COVEY ASSOCIATES

Page 19

                                                                                                                            S2                                                                                                                                       S1
                                                                                                                                                         LANDSCAPING




                                                                                                                                                                            ONE WAY




                                                                                                                       1                                                                    13



                                                                                                                                          CARPARK                                                                                                                                          EXIT




                                                                     WAITING BAY
LOT 1                            LOT 3                                                                            14                                                   22




                                                                                                               9No CYLCLE
                                                                                                                PARKING                                                      23
                                                                                                                                 OUTDOOR
                                                                                                                                 DINING AREA

                                                                                                                                                                                                                                                   34




                                                                                                                                                                                                                                                                                              ATH
                                                                                                                                                                                                                                                        WATER
                                                                                                     COLLECT
                                     OVERFLOW




                                                                                                                                                                                                                                                                                              FOOT P
                                                                     LANDSCAPING                                                                                                                                                                                          FUEL
                                                                                                                            FAST FOOD
                         APING




                                                                                                                                                                                                                                                          AIR AND
                                                                                                                                                                                                                                                                          VENTS
                                      PARKING                                                                               330 m2
                   LANDSC




                                                                                                                                                                                                                                                                                   APING
                                                                                                                                                                                                                                   UNDERGROUND
                                                                                                                                                                                                        SERVICE STATION             FUEL TANKS
                                                                                                                                                                                                        BOWSERS (8No)




                                                                                                                                                                                                                                                                             LANDSC




                                                                                                                                                                                                                                                                                                               TAYLOR
                                                                                                                                           DINING AREA
                                                                                                     PAY
                                                                                     DRIVE THROUGH




                                                                                                                                                                                                                                                                36




                                                                                                                                                                                                                                                                                                                 COURT
                                                                                                                                                                                      UNDERGROUND
                                                                                                                                                                                        FUEL TANK
                                                                                                     ORDER




                                                                                                                                                                                                                                                                                                       ENTRY
                                                                                                                                                                                                                                                                                                       EXIT
                                                                                                                            SERVICE
                                                                                                                            STATION                                          33
                                                                                                                            195 m2
                                                                                                                                           SALES AREA
                                                                                                     PURUSE




                                                                                                                                           120 m2
                                                                                                                                                                 1           4
                                                                                                                 SERVICE                                       MOTORCYLCLE
                                                                                                                  80 m2                SERVICE BAY               PARKING

                                                                                                                                                                                                                                     D
                                                                                                                                                                                                                              GROUN
                                                                                                                                                                                                                     UNDER             K
                                                                                                                                                                                                                       E TE N TION TAN
                                                                                                                                                                                                                     D
                                                                                                                                                                                                                            (5x10x2)
                                                                                                                                                                                                                                                CAPING
                                                                                                                                                                                                                                           LANDS
                                 WATER                                                                                                ONE WAY
                                  TANK




                                         WATER
                                         TANK    PUMP



                                                 BOOSTER
                                                                                                                                                                                                                          OT 1)
                                                                                                                                                                                                           EASE   MENT (L
                                                                                                                                                                                                    ACCESS




                                                                                   Consulting Civil &                                                                                                                     PROPOSED SERVICE                                                                               161968   SWMP01
                                                                                   Structural Engineers                                                          STORMWATER                                               CENTRE                                                              TAYLOR COURT,                          A
                                                                                   Project Management                                                            MANAGEMENT LAYOUT PLAN                                   HASS HOLDINGS ATF,                                                  COOROY,
                                                    ASSOCIATES PTY LTD
        APPROVAL
                                                                                   & Planning                                                                                                                             THE QUASAR TRUST                                                    QUEENSLAND

Page 20

                                                                                                                                    UN
                                                                                                                                        DE
                                                                                                                                     FU RG
                                                                                                                                        E RO
                                                                                                                                  LEGEND L
                                                                                                                                           TA UN
                                                                                                                                             NK D




                                                                                                    03
                                                                                               SW A
                                                                                                 MP
                                                                                      B
                                                                               SW
                                                                                  MP0
                                                                                     3




                                                                                                                    30
                                                                                                                  MP
                                                                                                                SW C
                                                                                         0 3
                                                                                      MP
                                                                                       A
                                                                                      SW
                                                                                                                         B
                                                                                                                  SW
                                                                                                                     MP




                                                                                                         C
                                                                                                                             03




                                Consulting Civil &                              PROPOSED SERVICE                                               161968   SWMP02
                                Structural Engineers   CONCEPT BIO-BASIN AND    CENTRE                       TAYLOR COURT,                                 A
                                Project Management     DETENTION TANK LAYOUT    HASS HOLDINGS ATF,           COOROY,
           ASSOCIATES PTY LTD
APPROVAL
                                & Planning             PLAN                     THE QUASAR TRUST             QUEENSLAND

Page 21

           SECTION A-A




                                                           SECTION B-B                                                           SECTION C-C




                                    Consulting Civil &                                            PROPOSED SERVICE                             161968   SWMP03
                                    Structural Engineers                 CONCEPT BIO-BASIN AND    CENTRE               TAYLOR COURT,                       A
                                    Project Management                   DETENTION TANK DETAILS   HASS HOLDINGS ATF,   COOROY,
               ASSOCIATES PTY LTD
APPROVAL
                                    & Planning                           PLAN                     THE QUASAR TRUST     QUEENSLAND

Page 22

APPENDIX C
MUSIC CONCEPT MAP

Page 23

Hardstand

Untreated

untreated road [Mixed]

Landscaping

 

Page 24

APPENDIX D

STORMWATER QUANTITY CATCHMENT PLANS

Page 25

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

| Cooroy Service Centre
Appendix D
| Catchment Boundary
Plan
mY Ye
SMM 0 25 _*

 

 

 

 

 

 

 

 

O:\0JOBS\16\161968\GIS\MapIinfo\Maps\PDF\161968-0001A_CatchmentBoundaries.wor

 

Page 26

APPENDIX E

RAINFALL DATA, RATIONAL METHOD DATA
AND RESULTS

Page 27

Rational Method Data
Location:   Cooroy

Australian Rainfall & Runoff IFD Coefficents

   2I        2I        2I        50I     50I     50I     F2     F50      G
     1         12        72         1       12      72

 50.33      10.62     3.48      91.03   24.96    8.8     4.39   17.57   0.13


Rainfall Intensity (mm/hr)

   DURATION                             AVERAGE RECURRENCE INTERVAL (years)
 hours  minutes         1         2        5    10    20     50    100      200    500
 0.08       5         124       158      195   217   247    286    317      347    389
 0.10       6         116       148      184   204   232    269    298      327    366
 0.17      10          96       122      151   168   191    222    246      270    303
 0.25      15          80       102      127   141   161    187    207      228    255
 0.33      20          70        89      111   124   141    164    182      200    224
 0.42      25          63        80      100   111   127    147    163      180    202
  0.5      30          57        73       91   101   116    135    149      164    184
 0.75      45         45.9       59       73    82    94    109    121      133    150
   1       60         39.1       50       63    70    80     93    103      114    128
  1.5      90         30.3      39.0     49.7   56    65     76     85       94    106
   2      120         25.2      32.6     42.0 47.7    55     66     74       82     93
   3      180         19.4      25.2     33.1 38.0   44.4    53     60       67     77
  4.5     270         14.9      19.5     26.1 30.2   35.6   43.0  48.8       55     63
   6      360         12.3      16.3     22.0 25.7   30.4   37.0  42.2      47.6    55
   9      540         9.50      12.6     17.4 20.4   24.4   29.9  34.4      39.0   45.6
  12      720         7.89      10.5     14.7 17.4   20.9   25.8  29.7      33.9   39.8
  18     1080         6.20      8.29     11.6 13.9   16.7   20.7  23.9      27.3   32.1
  24     1440         5.23      6.99     9.87 11.8   14.2   17.6  20.4      23.4   27.6
  30     1800         4.56      6.11     8.66 10.3   12.5   15.6  18.0      20.7   24.4
  36     2160         4.07      5.46     7.76 9.28   11.2   14.0  16.2      18.6   22.1
  48     2880         3.38      4.54     6.49 7.79   9.46   11.8  13.7      15.8   18.7
  72     4320         2.55      3.44     4.95 5.97   7.27   9.12  10.6      12.2   14.5

Catchment Data

Variable    Value      Unit
 Area       0.9241      ha
  C10        0.68    fraction
   tc        5.9     minutes


Rational Results

                              AVERAGE RECURRENCE INTERVAL (years)
     Variable          1          2     5     10    20     50      100
    Freq Factor      0.544      0.578 0.646  0.68 0.714  0.782    0.816
 Intensity (mm/hr)   117.1      149.1 184.6 205.2 233.6  270.9    299.5
 Discharge (m3/s)    0.164      0.221 0.306 0.358 0.428  0.544    0.628


[OCR of page images]
Rational Method Data

Location: Cooroy

Australian Rainfall & Runoff IFD Coefficents

 

 

ah 2h 2l72 50], 5012 50172 F2 F50 G

 

50.33 10.62 3.48 | 91.03 | 24.96 8.8 4.39 17.57 0.13

 

 

 

 

 

 

 

 

 

Rainfall Intensity (mm/hr

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DURATION AVERAGE RECURRENCE INTERVAL (years)
hours minutes 1 2 5 10 20 50 100 200 500
0.08 5 124 158 195 217 247 286 317 347 389
0.10 6 116 148 184 204 232 269 298 327 366
0.17 10 96 122 151 168 191 222 246 270 303
0.25 15 80 102 127 141 161 187 207 228 255
0.33 20 70 89 111 124 141 164 182 200 224
0.42 25 63 80 100 111 127 147 163 180 202
0.5 30 57 73 91 101 116 135 149 164 184
0.75 45 45.9 59 73 82 94 109 121 133 150
1 60 39.1 50 63 70 80 93 103 114 128
1.5 90 30.3 39.0 | 49.7 56 65 76 85 94 106
2 120 25.2 32.6 | 42.0 47.7 55 66 74 82 93
3 180 19.4 25.2 | 33.1 38.0 44.4 53 60 67 77
45 270 14.9 19.5 | 26.1 30.2 35.6 43.0 48.8 55 63
6 360 12.3 16.3 | 22.0 25.7 30.4 37.0 42.2 47.6 55
9 540 9.50 12.6 17.4 20.4 24.4 29.9 34.4 39.0 45.6
12 720 7.89 10.5 14.7 17.4 20.9 25.8 29.7 33.9 39.8
18 1080 6.20 8.29 11.6 13.9 16.7 20.7 23.9 27.3 32.1
24 1440 5.23 6.99 | 9.87 11.8 14.2 17.6 20.4 23.4 27.6
30 1800 4.56 6.11 8.66 10.3 12.5 15.6 18.0 20.7 24.4
36 2160 4.07 5.46 | 7.76 9.28 11.2 14.0 16.2 18.6 22.1
48 2880 3.38 4.54 | 6.49 7.79 9.46 11.8 13.7 15.8 18.7
72 4320 2.55 3.44 | 4.95 5.97 7.27 9.12 10.6 12.2 14.5
Catchment Data
Variable | Value Unit
Area 0.9241 ha
Cio 0.68 fraction
te 5.9 minutes

 

 

 

Rational Results

 

AVERAGE RECURRENCE INTERVAL (years
Variable 1 2 5 10 20 50 100

 

 

Freq Factor 0.544 | 0.578 | 0.646 | 0.68 0.714 | 0.782 | 0.816

 

Intensity (mm/hr) 117.1 | 149.1 | 184.6 | 205.2 | 233.6 | 270.9 | 299.5

 

 

 

 

 

 

 

 

 

 

Discharge (m°/s) 0.164 | 0.221 | 0.306 | 0.358 | 0.428 | 0.544 | 0.628

 

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.