Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail MCU16/0066 & OPW16/0133 - Engineering report & Stormwater Mgmt Plan (2 of 4).
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn S2 S1
LANDSCAPING
ONE WAY
1 13
CARPARK EXIT
WAITING BAY
LOT 1 LOT 3 14 22
9No CYLCLE
PARKING 23
OUTDOOR
DINING AREA
34
ATH
WATER
COLLECT
OVERFLOW
FOOT P
LANDSCAPING FUEL
FAST FOOD
APING
AIR AND
VENTS
PARKING 330 m2
LANDSC
APING
UNDERGROUND
SERVICE STATION FUEL TANKS
BOWSERS (8No)
LANDSC
TAYLOR
DINING AREA
PAY
DRIVE THROUGH
36
COURT
UNDERGROUND
FUEL TANK
ORDER
ENTRY
EXIT
SERVICE
STATION 33
195 m2
SALES AREA
PURUSE
120 m2
1 4
SERVICE MOTORCYLCLE
80 m2 SERVICE BAY PARKING
D
GROUN
UNDER K
E TE N TION TAN
D
(5x10x2)
CAPING
LANDS
WATER ONE WAY
TANK
WATER
TANK PUMP
BOOSTER
OT 1)
EASE MENT (L
ACCESS
Consulting Civil & PROPOSED SERVICE 161968 SWMP01
Structural Engineers STORMWATER CENTRE TAYLOR COURT, A
Project Management MANAGEMENT LAYOUT PLAN HASS HOLDINGS ATF, COOROY,
ASSOCIATES PTY LTD
APPROVAL
& Planning THE QUASAR TRUST QUEENSLAND
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.