STORMWATER

MANAGEMENT

PLAN

FOR

NOOSA CARE – TEWANTIN

AT

COOROY – NOOSA ROAD




                        April, 2011 - 09568


[OCR of page images]
TODCONSULTING

STORMWATER
MANAGEMENT

PLAN

FOR

NOOSA CARE — TEWANTIN
AT

COOROY — NOOSA ROAD

April, 2011 - 09568 ||
Log in to download the original file

Appendix F.pdf · 4.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 45 pages

Page 2

                                                   20 Mary St, Noosaville Qld 4566
                                                    PO Box 61 Noosaville Qld 4566
                                                                  P: 07 5449 9600
                                                                   F: 07 54499494
                                                   E: [email protected]
                                                           www.todconsulting.com




CONTENTS



1.   INTRODUCTION

     1.1    PROJECT OVERVIEW
     1.2    INTENT OF S.M.P
     1.3    DESIGN PHILOSOPHY

2.   S.M.P IMPLEMENTATION

     2.1    RAINWATER HARVESTING
     2.2.   HYDROCARBON CAPTURE
     2.3    NO NET INCREASE IN OVERALL DISCHARGE

3.   DESIGN

     3.1    2 YEAR HYDROGRAPHIC REPORT
     3.2    10 YEAR HYDROGRAPHIC REPORT
     3.3    100 YEAR HYDROGRAPHIC REPORT

4.   DOCUMENTATION

     4.1    EXISTING STORMWATER DRAINAGE
     4.2    PROPOSED STORMWATER DRAINAGE
     4.3    PROVISION FOR THE FUTURE

5.   MAINTENANCE PLAN

     5.1    RAINWATER HARVESTING TANK
     5.2    DETENTION POND
     5.3    FOX OIL AND GREASE ARRESTOR




                                                        April, 2011 - 09568

Page 3

1.   INTRODUCTION

     1.1    PROJECT OVERVIEW
     Noosa Care Tewantin (Carramar) has engaged Paynter and Dixon to carry out a feasibility
     and Development Approval for the next phase of the growth of “Noosa Care” at Tewantin.
     This proposal includes two new special care buildings, an extension to the administration and
     entry building, and associated car parking and service driveway. (See Appendix 1)

     1.2    INTENT OF THE S.M.P.
     This S.M.P. is for use by Civil and Hydraulic Engineers, Compliance Assessors, Construction
     and Maintenance Contractors so that the project has minimal environmental impact and
     complies with Government Legislation and Council Policies.

     1.3    DESIGN PHILOSOPHY
     As the special care buildings are the major portion of the construction proposed covering
     some 3,000.00 square meters the total stormwater detention will be positioned adjacent to
     these buildings. All clean stormwater run-off from the New Admin and Entry Block will be `
     disposed of directly through new stormwater drains into the existing creek system, all
     stormwater from the carpark and access driveway will be cleaned from hydrocarbon
     contamination only and then be disposed of directly to the existing creek system. Individual
     blocks will have their own rainwater harvesting tanks positioned adjacent to the buildings.

2.   S.M.P. IMPLEMENTATION

     2.1     RAIN HARVESTING
     Rainwater harvesting will be implemented by the use of “Atlantis Type” underground
     tanks. (See Appendix 2) the overflow from the tanks adjacent to the Special Care Buildings
     must be discharged to the proposed detention pond adjacent to the Special Care Block „A‟.
     The over flow from the new administration and entry block must discharge to the overland
     flow path on the southern side of the Special Care Block „B‟. (See Appendix 3)

     2.2     HYDROCARBON CAPTURE
     Hydrocarbon capture will be undertaken by the use of Fox Gross Pollutant units (BPT 600).
     These units are most successful where trash and other debris cannot be controlled and where
     the potential for the presence of hydrocarbon is high but the quantities involved are minor
     which is the case in staff and visitor carparking. A Fox BPT 600 will remove pollutants at
     their source eliminating the duplication of catch pits (See Appendix 4)

     2.3     NO NET INCREASE IN OVERALL DISCHARGE
     No net increase in overall discharge will be achieved by the use of a detention pond
     situated adjacent to the new Special Care Block „A‟. This pond will be designed to
     detain and release water in a controlled manner to achieve a no worsening impact on the
     down stream flows than that flow existing before this project commences. The detention will
     take into account the un-detained run-off from the new administration and entry block, and
     the new carpark.




                                                                               April, 2011 - 09568

Page 4

3.   DESIGN




              April, 2011 - 09568


[OCR of page images]
3. DESIGN

April, 2011 - 09568 ||

Page 5

GD

7
4. POST DEVELOPED
BLOCK A & B QD
(CATCHMENT 3) 4

\ 5. POST DEVELOPED

\ CARPARK AND
\ ADMIN/ENTRY BLOCK

L | (CATCHMENT 1 & 2)

@ 6. DETENTION /
_ 7 BASIN /
Yo 2. PRE DEVELOPED \ /
, BLOCK A & B LS
1. PRE DEVELOPED (CATCHMENT 3) \ /
CARPARK AND / ’
ADMIN/ENTRY BLOCK / oe
(CATCHMENT 1 & 2) /
/ 7. TOTAL
\ / POST DEVELOPED
a5
3. TOTAL

PRE DEVELOPED

NOTE: FLOWRATE FROM 7. < FLOWRATE FROM 3.

WATERSHED MODEL SCHEMATIC

N.T.S.

SITE PLAN

 

 

 

 

 

 

 

(1530m7)

CATCHMENT 1

LEGEND (NO DETENTION)

RAY

 

 

© | TREESTO BE REMOVED

 

PON
Oy]

[| TREES TO BE RETAINED

CATCHMENT 2 1300n’)

(NO DETENTION)
CATCHMENT 3 135354
(10 DETENTION)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AUXILARY

 

 

 

 

LODGE

oo

 

 

 

 

 

 

 

 

 

ROBENA
LODGE

 

 

 

 

PIPE IL: 9.44

 

 

 

ACTIVITY
BLOCK

 

RL 10.300,

EXISTING CARPARK UNDER

(18 BAYS)

 

 

STAFF CARP!
18 BAYS UN
ACTIVITY BLOCK

~

DOWNSTREAM

 

 

 

 

 

PIPE IL: 10.1

 

\ heia ENTRY QRIVEWAY

 

 

 

 

rw

 

BLANCHE WOOD

 

DOROTHY WARD &

LODGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COOROY - NOOSA ROAD —

 

DETENTION BASIN

                                             

wee 1100 LINE

 

0 Q100 LINE

 

COPYRIGHT. These PROJECT

PROPOSED ADDITIONS TO
NOOSA CARE AGED RESIDENCES
at

COOROY-NOOSA ROAD
TEWANTIN

 

DRAWING TITLE

CATCHMENT PLAN

REVISED TO SUIT NEW ARCHITECTURAL LAYOUT
PRELIMINARY ISSUE

 

 

Drawing Record

 

 

 

I

ASSOCIATED CONSULTANT

& PAYNTER DIXON

BUILDING YOUR BUSINESS

PAYNTER DIXON QUEENSLAND PTY. LTD.

RIVE, MILTON, QLD 4064

FAX: 07-3967 4600

 

 

ENGINEERS

STRUCTURAL CIVIL

 

 

oS PRYSTUPA

Pr". VENESS

 

 

Checked

 

 

 

 

 

1. GRAY C._DOWDING N/A
Shee comer Delon
Zot 4 AHD
Job No. Drawing No. Issue
09568 Sk2_ [x]8] |

 

 

 

 

Page 6

                                                                                                                                                    1
Hydrograph Return Period Recap
                         Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25


Hyd. Hydrograph   Inflow                                      Peak Outflow (cms)                                               Hydrograph
No.      type     hyd(s)                                                                                                       Description
       (origin)              1-yr        2-yr     3-yr        5-yr        10-yr    25-yr       50-yr       100-yr



 1    Rational      ------     -------    0.049     -------     -------    0.067     -------     -------    0.097   pre developed catchment 1 & 2

 2    Rational      ------     -------    0.096     -------     -------    0.130     -------     -------    0.187   pre developed catchment 3

 3    Combine        1, 2      -------    0.145     -------     -------    0.197     -------     -------    0.283   TOTAL PRE DEVELOPED

 4    Rational      ------     -------    0.144     -------     -------    0.195     -------     -------    0.281   post development catchment 3

 5    Rational      ------     -------    0.074     -------     -------    0.101     -------     -------    0.145   post development catchment 1 & 2

 6    Reservoir       4        -------    0.091     -------     -------    0.106     -------     -------    0.125   DETENTION BASIN

 7    Combine        5, 6      -------    0.152     -------     -------    0.192     -------     -------    0.250   TOTAL POST DEVELOPED




 Proj. file: J:\2009\09568_Noosacare_Inc_Carramar\Design\hydraulics\DETENTION-2-
                                                                         Tuesday,ABOVE
                                                                                  Apr 5, GROUND05-04.gpw
                                                                                         2011


[OCR of page images]
1
Hydrograph Return Period Reca

Hydraflow Prooraphs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25

 

 

 

Hyd. |Hydrograph [Inflow Peak Outflow (cms) Hydrograph
No. type hyd(s) Description
(origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
1 {Rational =f wwww== f= 0.049 | ------- | ------- 0.067 | ------- | ------- 0.097 | pre developed catchment 1 & 2
2 {Rational = | wwww== f= 0.096 | ------- | ------- 0.130 | ------- | ------- 0.187 | pre developed catchment 3
3. |Combine 1,2 0 | we 0.145 | ------- | ------- 0.197 | ------- | ------- 0.283 TOTAL PRE DEVELOPED
4 |Rational =| ------ | ---=-- 0.144 | ------- | ------- 0.195 | ------- | ------- 0.281 | post development catchment 3
5 |Rational = | wwww== fH 0.074 | ------- | ------- 0.101 | ------- | ------- 0.145 | post development catchment 1 & 2
6 |Reservoir Af wreeeee 0.091 | ------- | ------- 0.106 | ------- | ------- 0.125 DETENTION BASIN
7  |Combine 5,6 0.152 0.192 0.250 TOTAL POST DEVELOPED

         

 

 

 

 

 

 

 

 

 

 

 

 

 

Proj. file: J:\2009\09568_Noosacare_Inc_Carramar\Design\hydraulics\DETENTIG8da ABPME GROQUNDO5-04.gpw

 

 

 

Page 7

                                                                                                                             2
Hydrograph Summary Report
                       Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25


Hyd. Hydrograph   Peak     Time    Time to   Hyd.     Inflow      Maximum        Total               Hydrograph
No.      type     flow     interval Peak     volume   hyd(s)      elevation     strge used           Description
       (origin)   (cms)    (min)   (min)     (cum)                   (m)         (cum)



 1    Rational     0.049      1       8       30.9       ------        ------       ------   pre developed catchment 1 & 2

 2    Rational     0.096      1       8       59.7       ------        ------       ------   pre developed catchment 3

 3    Combine      0.145      1       8       87.1       1, 2          ------       ------   TOTAL PRE DEVELOPED

 4    Rational     0.144      1       6       67.2       ------        ------       ------   post development catchment 3

 5    Rational     0.074      1       6       34.7       ------        ------       ------   post development catchment 1 & 2

 6    Reservoir    0.091      1       9       64.5         4         7.89         768        DETENTION BASIN

 7    Combine      0.152      1       7       97.9       5, 6          ------       ------   TOTAL POST DEVELOPED




 J:\2009\09568_Noosacare_Inc_Carramar\Design\hydraulics\DETENTION-2-
                                        Return Period: 2 Year        ABOVE
                                                                      Tuesday,
                                                                            GROUND05-04.gpw
                                                                               Apr 5, 2011

Page 8

                                                                                                                               3
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                          Tuesday, Apr 5, 2011


 Hyd. No. 1
 pre developed catchment 1 & 2

 Hydrograph type                    = Rational                                   Peak discharge           = 0.049 cms
 Storm frequency                    = 2 yrs                                      Time to peak             = 8 min
 Time interval                      = 1 min                                      Hyd. volume              = 30.9 cum
 Drainage area                      = 0.183 hectare                              Runoff coeff.            = 0.7
 Intensity                          = 140.114 mm/hr                              Tc by User               = 8.00     min
 IDF Curve                          = NOOSA.IDF                                  Asc/Rec limb fact        = 1/1.6




                                               pre developed catchment 1 & 2
Q (cms)                                                                                                                      Q (cms)
                                                           Hyd. No. 1 -- 2 Year
0.060                                                                                                                        0.060




0.030                                                                                                                        0.030




0.000                                                                                                                        0.000
          0         2          4          6          8          10         12          14   16       18       20        22
                                                                                                                     Time (min)
                 Hyd No. 1

Page 9

                                                                                                                               4
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                          Tuesday, Apr 5, 2011


 Hyd. No. 2
 pre developed catchment 3

 Hydrograph type                    = Rational                                   Peak discharge           = 0.096 cms
 Storm frequency                    = 2 yrs                                      Time to peak             = 8 min
 Time interval                      = 1 min                                      Hyd. volume              = 59.7 cum
 Drainage area                      = 0.354 hectare                              Runoff coeff.            = 0.7
 Intensity                          = 140.114 mm/hr                              Tc by User               = 8.00     min
 IDF Curve                          = NOOSA.IDF                                  Asc/Rec limb fact        = 1/1.6




                                                  pre developed catchment 3
Q (cms)                                                                                                                      Q (cms)
                                                           Hyd. No. 2 -- 2 Year
0.120                                                                                                                        0.120




0.090                                                                                                                        0.090




0.060                                                                                                                        0.060




0.030                                                                                                                        0.030




0.000                                                                                                                        0.000
          0         2          4          6          8          10         12          14   16       18       20        22
                                                                                                                     Time (min)
                 Hyd No. 2

Page 10

                                                                                                                             5
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                        Tuesday, Apr 5, 2011


 Hyd. No. 3
 TOTAL PRE DEVELOPED

 Hydrograph type                     = Combine                                   Peak discharge         = 0.145 cms
 Storm frequency                     = 2 yrs                                     Time to peak           = 8 min
 Time interval                       = 1 min                                     Hyd. volume            = 87.1 cum
 Inflow hyds.                        = 1, 2                                      Contrib. drain. area   = 0.537 hectare




                                                   TOTAL PRE DEVELOPED
Q (cms)                                                                                                                    Q (cms)
                                                           Hyd. No. 3 -- 2 Year
0.180                                                                                                                      0.180




0.150                                                                                                                      0.150




0.120                                                                                                                      0.120




0.090                                                                                                                      0.090




0.060                                                                                                                      0.060




0.030                                                                                                                      0.030




0.000                                                                                                                      0.000
          0          2           4           6            8          10          12       14       16      18         20
                                                                                                                   Time (min)
                 Hyd No. 3                       Hyd No. 1                    Hyd No. 2

Page 11

                                                                                                                            6
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                       Tuesday, Apr 5, 2011


 Hyd. No. 4
 post development catchment 3

 Hydrograph type                    = Rational                                   Peak discharge      = 0.144 cms
 Storm frequency                    = 2 yrs                                      Time to peak        = 6 min
 Time interval                      = 1 min                                      Hyd. volume         = 67.2 cum
 Drainage area                      = 0.354 hectare                              Runoff coeff.       = 0.95
 Intensity                          = 154.906 mm/hr                              Tc by User          = 6.00     min
 IDF Curve                          = NOOSA.IDF                                  Asc/Rec limb fact   = 1/1.6




                                               post development catchment 3
Q (cms)                                                                                                                   Q (cms)
                                                           Hyd. No. 4 -- 2 Year
0.180                                                                                                                     0.180




0.150                                                                                                                     0.150




0.120                                                                                                                     0.120




0.090                                                                                                                     0.090




0.060                                                                                                                     0.060




0.030                                                                                                                     0.030




0.000                                                                                                                     0.000
          0             2              4               6              8                10    12       14             16
                                                                                                                  Time (min)
                 Hyd No. 4

Page 12

                                                                                                                            7
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                       Tuesday, Apr 5, 2011


 Hyd. No. 5
 post development catchment 1 & 2

 Hydrograph type                    = Rational                                   Peak discharge      = 0.074 cms
 Storm frequency                    = 2 yrs                                      Time to peak        = 6 min
 Time interval                      = 1 min                                      Hyd. volume         = 34.7 cum
 Drainage area                      = 0.183 hectare                              Runoff coeff.       = 0.95
 Intensity                          = 154.906 mm/hr                              Tc by User          = 6.00     min
 IDF Curve                          = NOOSA.IDF                                  Asc/Rec limb fact   = 1/1.6




                                            post development catchment 1 & 2
Q (cms)                                                                                                                   Q (cms)
                                                           Hyd. No. 5 -- 2 Year
0.090                                                                                                                     0.090




0.060                                                                                                                     0.060




0.030                                                                                                                     0.030




0.000                                                                                                                     0.000
          0             2              4               6              8                10    12       14             16
                                                                                                                  Time (min)
                 Hyd No. 5

Page 13

                                                                                                                                   8
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                              Tuesday, Apr 5, 2011


 Hyd. No. 6
 DETENTION BASIN

 Hydrograph type                    = Reservoir                  Peak discharge                             = 0.091 cms
 Storm frequency                    = 2 yrs                      Time to peak                               = 9 min
 Time interval                      = 1 min                      Hyd. volume                                = 64.5 cum
 Inflow hyd. No.                    = 4 - post development catchment
                                                                 Max.3 Elevation                            = 7.89 m
 Reservoir name                     = DETENTION TANK             Max. Storage                               = 21.8 cum

 Storage Indication method used.




                                                        DETENTION BASIN
Q (cms)                                                                                                                          Q (cms)
                                                           Hyd. No. 6 -- 2 Year
0.180                                                                                                                            0.180




0.150                                                                                                                            0.150




0.120                                                                                                                            0.120




0.090                                                                                                                            0.090




0.060                                                                                                                            0.060




0.030                                                                                                                            0.030




0.000                                                                                                                            0.000
          0     2       4      6      8     10     12     14     16      18     20     22   24   26    28    30      32     34
                                                                                                                          Time (min)
                  Hyd No. 6                      Hyd No. 4                        Total storage used = 21.8 cum

Page 14

                                                                                                                              9
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                         Tuesday, Apr 5, 2011


 Hyd. No. 7
 TOTAL POST DEVELOPED

 Hydrograph type                     = Combine                                   Peak discharge         = 0.152 cms
 Storm frequency                     = 2 yrs                                     Time to peak           = 7 min
 Time interval                       = 1 min                                     Hyd. volume            = 97.9 cum
 Inflow hyds.                        = 5, 6                                      Contrib. drain. area   = 0.183 hectare




                                                  TOTAL POST DEVELOPED
Q (cms)                                                                                                                     Q (cms)
                                                           Hyd. No. 7 -- 2 Year
0.180                                                                                                                       0.180




0.150                                                                                                                       0.150




0.120                                                                                                                       0.120




0.090                                                                                                                       0.090




0.060                                                                                                                       0.060




0.030                                                                                                                       0.030




0.000                                                                                                                       0.000
          0      2       4       6       8       10      12      14      16      18    20    22    24   26     28      30
                                                                                                                    Time (min)
                 Hyd No. 7                      Hyd No. 5                     Hyd No. 6

Page 15

                                                                                                                         10
Hydrograph Summary Report
                       Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25


Hyd. Hydrograph   Peak     Time    Time to   Hyd.     Inflow      Maximum        Total               Hydrograph
No.      type     flow     interval Peak     volume   hyd(s)      elevation     strge used           Description
       (origin)   (cms)    (min)   (min)     (cum)                   (m)         (cum)



 1    Rational     0.067      1       8       42.0       ------        ------       ------   pre developed catchment 1 & 2

 2    Rational     0.130      1       8       81.2       ------        ------       ------   pre developed catchment 3

 3    Combine      0.197      1       8       118.4      1, 2          ------       ------   TOTAL PRE DEVELOPED

 4    Rational     0.195      1       6       91.4       ------        ------       ------   post development catchment 3

 5    Rational     0.101      1       6       47.3       ------        ------       ------   post development catchment 1 & 2

 6    Reservoir    0.106      1       10      87.8         4         8.03         1,198      DETENTION BASIN

 7    Combine      0.192      1       6       133.3      5, 6          ------       ------   TOTAL POST DEVELOPED




 J:\2009\09568_Noosacare_Inc_Carramar\Design\hydraulics\DETENTION-2-
                                        Return Period: 10 Year       ABOVE
                                                                      Tuesday,
                                                                            GROUND05-04.gpw
                                                                               Apr 5, 2011

Page 16

                                                                                                                             11
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                          Tuesday, Apr 5, 2011


 Hyd. No. 1
 pre developed catchment 1 & 2

 Hydrograph type                    = Rational                                   Peak discharge           = 0.067 cms
 Storm frequency                    = 10 yrs                                     Time to peak             = 8 min
 Time interval                      = 1 min                                      Hyd. volume              = 42.0 cum
 Drainage area                      = 0.183 hectare                              Runoff coeff.            = 0.7
 Intensity                          = 190.532 mm/hr                              Tc by User               = 8.00     min
 IDF Curve                          = NOOSA.IDF                                  Asc/Rec limb fact        = 1/1.6




                                               pre developed catchment 1 & 2
Q (cms)                                                                                                                      Q (cms)
                                                          Hyd. No. 1 -- 10 Year
0.090                                                                                                                        0.090




0.060                                                                                                                        0.060




0.030                                                                                                                        0.030




0.000                                                                                                                        0.000
          0         2          4          6          8          10         12          14   16       18       20        22
                                                                                                                     Time (min)
                 Hyd No. 1

Page 17

                                                                                                                             12
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                          Tuesday, Apr 5, 2011


 Hyd. No. 2
 pre developed catchment 3

 Hydrograph type                    = Rational                                   Peak discharge           = 0.130 cms
 Storm frequency                    = 10 yrs                                     Time to peak             = 8 min
 Time interval                      = 1 min                                      Hyd. volume              = 81.2 cum
 Drainage area                      = 0.354 hectare                              Runoff coeff.            = 0.7
 Intensity                          = 190.532 mm/hr                              Tc by User               = 8.00     min
 IDF Curve                          = NOOSA.IDF                                  Asc/Rec limb fact        = 1/1.6




                                                  pre developed catchment 3
Q (cms)                                                                                                                      Q (cms)
                                                          Hyd. No. 2 -- 10 Year
0.150                                                                                                                        0.150




0.120                                                                                                                        0.120




0.090                                                                                                                        0.090




0.060                                                                                                                        0.060




0.030                                                                                                                        0.030




0.000                                                                                                                        0.000
          0         2          4          6          8          10         12          14   16       18       20        22
                                                                                                                     Time (min)
                 Hyd No. 2

Page 18

                                                                                                                           13
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                        Tuesday, Apr 5, 2011


 Hyd. No. 3
 TOTAL PRE DEVELOPED

 Hydrograph type                     = Combine                                   Peak discharge         = 0.197 cms
 Storm frequency                     = 10 yrs                                    Time to peak           = 8 min
 Time interval                       = 1 min                                     Hyd. volume            = 118.4 cum
 Inflow hyds.                        = 1, 2                                      Contrib. drain. area   = 0.537 hectare




                                                   TOTAL PRE DEVELOPED
Q (cms)                                                                                                                    Q (cms)
                                                          Hyd. No. 3 -- 10 Year
0.210                                                                                                                      0.210




0.180                                                                                                                      0.180




0.150                                                                                                                      0.150




0.120                                                                                                                      0.120




0.090                                                                                                                      0.090




0.060                                                                                                                      0.060




0.030                                                                                                                      0.030




0.000                                                                                                                      0.000
          0          2           4           6            8          10          12       14       16      18         20
                                                                                                                   Time (min)
                 Hyd No. 3                       Hyd No. 1                    Hyd No. 2

Page 19

                                                                                                                          14
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                       Tuesday, Apr 5, 2011


 Hyd. No. 4
 post development catchment 3

 Hydrograph type                    = Rational                                   Peak discharge      = 0.195 cms
 Storm frequency                    = 10 yrs                                     Time to peak        = 6 min
 Time interval                      = 1 min                                      Hyd. volume         = 91.4 cum
 Drainage area                      = 0.354 hectare                              Runoff coeff.       = 0.95
 Intensity                          = 210.827 mm/hr                              Tc by User          = 6.00     min
 IDF Curve                          = NOOSA.IDF                                  Asc/Rec limb fact   = 1/1.6




                                               post development catchment 3
Q (cms)                                                                                                                   Q (cms)
                                                           Hyd. No. 4 -- 10 Year
0.210                                                                                                                     0.210




0.180                                                                                                                     0.180




0.150                                                                                                                     0.150




0.120                                                                                                                     0.120




0.090                                                                                                                     0.090




0.060                                                                                                                     0.060




0.030                                                                                                                     0.030




0.000                                                                                                                     0.000
          0             2              4               6              8                10    12       14             16
                                                                                                                  Time (min)
                 Hyd No. 4

Page 20

                                                                                                                          15
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                       Tuesday, Apr 5, 2011


 Hyd. No. 5
 post development catchment 1 & 2

 Hydrograph type                    = Rational                                   Peak discharge      = 0.101 cms
 Storm frequency                    = 10 yrs                                     Time to peak        = 6 min
 Time interval                      = 1 min                                      Hyd. volume         = 47.3 cum
 Drainage area                      = 0.183 hectare                              Runoff coeff.       = 0.95
 Intensity                          = 210.827 mm/hr                              Tc by User          = 6.00     min
 IDF Curve                          = NOOSA.IDF                                  Asc/Rec limb fact   = 1/1.6




                                            post development catchment 1 & 2
Q (cms)                                                                                                                   Q (cms)
                                                           Hyd. No. 5 -- 10 Year
0.120                                                                                                                     0.120




0.090                                                                                                                     0.090




0.060                                                                                                                     0.060




0.030                                                                                                                     0.030




0.000                                                                                                                     0.000
          0             2              4               6              8                10    12       14             16
                                                                                                                  Time (min)
                 Hyd No. 5

Page 21

                                                                                                                                  16
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                               Tuesday, Apr 5, 2011


 Hyd. No. 6
 DETENTION BASIN

 Hydrograph type                    = Reservoir                  Peak discharge                           = 0.106 cms
 Storm frequency                    = 10 yrs                     Time to peak                             = 10 min
 Time interval                      = 1 min                      Hyd. volume                              = 87.8 cum
 Inflow hyd. No.                    = 4 - post development catchment
                                                                 Max.3 Elevation                          = 8.03 m
 Reservoir name                     = DETENTION TANK             Max. Storage                             = 33.9 cum

 Storage Indication method used.




                                                        DETENTION BASIN
Q (cms)                                                                                                                           Q (cms)
                                                          Hyd. No. 6 -- 10 Year
0.210                                                                                                                             0.210




0.180                                                                                                                             0.180




0.150                                                                                                                             0.150




0.120                                                                                                                             0.120




0.090                                                                                                                             0.090




0.060                                                                                                                             0.060




0.030                                                                                                                             0.030




0.000                                                                                                                             0.000
          0     2       4       6   8     10     12     14    16     18     20     22   24   26    28   30    32      34     36
                                                                                                                           Time (min)
                    Hyd No. 6                   Hyd No. 4                         Total storage used = 33.9 cum

Page 22

                                                                                                                            17
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                         Tuesday, Apr 5, 2011


 Hyd. No. 7
 TOTAL POST DEVELOPED

 Hydrograph type                     = Combine                                   Peak discharge         = 0.192 cms
 Storm frequency                     = 10 yrs                                    Time to peak           = 6 min
 Time interval                       = 1 min                                     Hyd. volume            = 133.3 cum
 Inflow hyds.                        = 5, 6                                      Contrib. drain. area   = 0.183 hectare




                                                  TOTAL POST DEVELOPED
Q (cms)                                                                                                                     Q (cms)
                                                          Hyd. No. 7 -- 10 Year
0.210                                                                                                                       0.210




0.180                                                                                                                       0.180




0.150                                                                                                                       0.150




0.120                                                                                                                       0.120




0.090                                                                                                                       0.090




0.060                                                                                                                       0.060




0.030                                                                                                                       0.030




0.000                                                                                                                       0.000
          0      2       4       6       8       10      12      14      16      18    20    22    24   26     28      30
                                                                                                                    Time (min)
                 Hyd No. 7                      Hyd No. 5                     Hyd No. 6

Page 23

                                                                                                                         18
Hydrograph Summary Report
                       Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25


Hyd. Hydrograph   Peak     Time    Time to   Hyd.     Inflow      Maximum        Total               Hydrograph
No.      type     flow     interval Peak     volume   hyd(s)      elevation     strge used           Description
       (origin)   (cms)    (min)   (min)     (cum)                   (m)         (cum)



 1    Rational     0.097      1       8       60.3       ------        ------       ------   pre developed catchment 1 & 2

 2    Rational     0.187      1       8       116.6      ------        ------       ------   pre developed catchment 3

 3    Combine      0.283      1       8       170.1      1, 2          ------       ------   TOTAL PRE DEVELOPED

 4    Rational     0.281      1       6       131.3      ------        ------       ------   post development catchment 3

 5    Rational     0.145      1       6       67.9       ------        ------       ------   post development catchment 1 & 2

 6    Reservoir    0.125      1       11      126.2        4         8.24         2,051      DETENTION BASIN

 7    Combine      0.250      1       6       191.5      5, 6          ------       ------   TOTAL POST DEVELOPED




 J:\2009\09568_Noosacare_Inc_Carramar\Design\hydraulics\DETENTION-2-
                                        Return Period: 100 Year      ABOVE
                                                                      Tuesday,
                                                                            GROUND05-04.gpw
                                                                               Apr 5, 2011

Page 24

                                                                                                                             19
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                          Tuesday, Apr 5, 2011


 Hyd. No. 1
 pre developed catchment 1 & 2

 Hydrograph type                    = Rational                                   Peak discharge           = 0.097 cms
 Storm frequency                    = 100 yrs                                    Time to peak             = 8 min
 Time interval                      = 1 min                                      Hyd. volume              = 60.3 cum
 Drainage area                      = 0.183 hectare                              Runoff coeff.            = 0.7
 Intensity                          = 273.721 mm/hr                              Tc by User               = 8.00     min
 IDF Curve                          = NOOSA.IDF                                  Asc/Rec limb fact        = 1/1.6




                                               pre developed catchment 1 & 2
Q (cms)                                                                                                                      Q (cms)
                                                         Hyd. No. 1 -- 100 Year
0.120                                                                                                                        0.120




0.090                                                                                                                        0.090




0.060                                                                                                                        0.060




0.030                                                                                                                        0.030




0.000                                                                                                                        0.000
          0         2          4          6          8          10         12          14   16       18       20        22
                                                                                                                     Time (min)
                 Hyd No. 1

Page 25

                                                                                                                             20
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                          Tuesday, Apr 5, 2011


 Hyd. No. 2
 pre developed catchment 3

 Hydrograph type                    = Rational                                   Peak discharge           = 0.187 cms
 Storm frequency                    = 100 yrs                                    Time to peak             = 8 min
 Time interval                      = 1 min                                      Hyd. volume              = 116.6 cum
 Drainage area                      = 0.354 hectare                              Runoff coeff.            = 0.7
 Intensity                          = 273.721 mm/hr                              Tc by User               = 8.00    min
 IDF Curve                          = NOOSA.IDF                                  Asc/Rec limb fact        = 1/1.6




                                                  pre developed catchment 3
Q (cms)                                                                                                                      Q (cms)
                                                         Hyd. No. 2 -- 100 Year
0.210                                                                                                                        0.210




0.180                                                                                                                        0.180




0.150                                                                                                                        0.150




0.120                                                                                                                        0.120




0.090                                                                                                                        0.090




0.060                                                                                                                        0.060




0.030                                                                                                                        0.030




0.000                                                                                                                        0.000
          0         2          4          6          8          10         12          14   16       18      20         22
                                                                                                                     Time (min)
                 Hyd No. 2

Page 26

                                                                                                                           21
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                        Tuesday, Apr 5, 2011


 Hyd. No. 3
 TOTAL PRE DEVELOPED

 Hydrograph type                     = Combine                                   Peak discharge         = 0.283 cms
 Storm frequency                     = 100 yrs                                   Time to peak           = 8 min
 Time interval                       = 1 min                                     Hyd. volume            = 170.1 cum
 Inflow hyds.                        = 1, 2                                      Contrib. drain. area   = 0.537 hectare




                                                   TOTAL PRE DEVELOPED
Q (cms)                                                                                                                    Q (cms)
                                                         Hyd. No. 3 -- 100 Year
0.385                                                                                                                      0.385




0.330                                                                                                                      0.330




0.275                                                                                                                      0.275




0.220                                                                                                                      0.220




0.165                                                                                                                      0.165




0.110                                                                                                                      0.110




0.055                                                                                                                      0.055




0.000                                                                                                                      0.000
          0          2           4           6            8          10          12       14       16      18         20
                                                                                                                   Time (min)
                 Hyd No. 3                       Hyd No. 1                    Hyd No. 2

Page 27

                                                                                                                          22
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                       Tuesday, Apr 5, 2011


 Hyd. No. 4
 post development catchment 3

 Hydrograph type                    = Rational                                   Peak discharge      = 0.281 cms
 Storm frequency                    = 100 yrs                                    Time to peak        = 6 min
 Time interval                      = 1 min                                      Hyd. volume         = 131.3 cum
 Drainage area                      = 0.354 hectare                              Runoff coeff.       = 0.95
 Intensity                          = 302.926 mm/hr                              Tc by User          = 6.00    min
 IDF Curve                          = NOOSA.IDF                                  Asc/Rec limb fact   = 1/1.6




                                               post development catchment 3
Q (cms)                                                                                                                   Q (cms)
                                                           Hyd. No. 4 -- 100 Year
0.330                                                                                                                     0.330




0.275                                                                                                                     0.275




0.220                                                                                                                     0.220




0.165                                                                                                                     0.165




0.110                                                                                                                     0.110




0.055                                                                                                                     0.055




0.000                                                                                                                     0.000
          0             2              4               6              8                10    12       14             16
                                                                                                                  Time (min)
                 Hyd No. 4

Page 28

                                                                                                                          23
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                       Tuesday, Apr 5, 2011


 Hyd. No. 5
 post development catchment 1 & 2

 Hydrograph type                    = Rational                                   Peak discharge      = 0.145 cms
 Storm frequency                    = 100 yrs                                    Time to peak        = 6 min
 Time interval                      = 1 min                                      Hyd. volume         = 67.9 cum
 Drainage area                      = 0.183 hectare                              Runoff coeff.       = 0.95
 Intensity                          = 302.926 mm/hr                              Tc by User          = 6.00     min
 IDF Curve                          = NOOSA.IDF                                  Asc/Rec limb fact   = 1/1.6




                                            post development catchment 1 & 2
Q (cms)                                                                                                                   Q (cms)
                                                           Hyd. No. 5 -- 100 Year
0.180                                                                                                                     0.180




0.150                                                                                                                     0.150




0.120                                                                                                                     0.120




0.090                                                                                                                     0.090




0.060                                                                                                                     0.060




0.030                                                                                                                     0.030




0.000                                                                                                                     0.000
          0             2              4               6              8                10    12       14             16
                                                                                                                  Time (min)
                 Hyd No. 5

Page 29

                                                                                                                                   24
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                                Tuesday, Apr 5, 2011


 Hyd. No. 6
 DETENTION BASIN

 Hydrograph type                    = Reservoir                  Peak discharge                             = 0.125 cms
 Storm frequency                    = 100 yrs                    Time to peak                               = 11 min
 Time interval                      = 1 min                      Hyd. volume                                = 126.2 cum
 Inflow hyd. No.                    = 4 - post development catchment
                                                                 Max.3 Elevation                            = 8.24 m
 Reservoir name                     = DETENTION TANK             Max. Storage                               = 58.1 cum

 Storage Indication method used.




                                                          DETENTION BASIN
Q (cms)                                                                                                                            Q (cms)
                                                          Hyd. No. 6 -- 100 Year
0.330                                                                                                                              0.330




0.275                                                                                                                              0.275




0.220                                                                                                                              0.220




0.165                                                                                                                              0.165




0.110                                                                                                                              0.110




0.055                                                                                                                              0.055




0.000                                                                                                                              0.000
          0     2      4     6     8    10     12    14     16    18    20     22      24   26   28   30   32   34     36     38
                                                                                                                            Time (min)
                    Hyd No. 6                   Hyd No. 4                           Total storage used = 58.1 cum

Page 30

                                                                                                                                25
 Hydrograph Report
 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25                             Tuesday, Apr 5, 2011


 Hyd. No. 7
 TOTAL POST DEVELOPED

 Hydrograph type                    = Combine                                     Peak discharge           = 0.250 cms
 Storm frequency                    = 100 yrs                                     Time to peak             = 6 min
 Time interval                      = 1 min                                       Hyd. volume              = 191.5 cum
 Inflow hyds.                       = 5, 6                                        Contrib. drain. area     = 0.183 hectare




                                                   TOTAL POST DEVELOPED
Q (cms)                                                                                                                         Q (cms)
                                                           Hyd. No. 7 -- 100 Year
0.330                                                                                                                           0.330




0.275                                                                                                                           0.275




0.220                                                                                                                           0.220




0.165                                                                                                                           0.165




0.110                                                                                                                           0.110




0.055                                                                                                                           0.055




0.000                                                                                                                           0.000
          0      2      4       6      8      10      12      14     16      18        20   22   24   26    28     30      32
                                                                                                                        Time (min)
                 Hyd No. 7                      Hyd No. 5                     Hyd No. 6

Page 31

4.   DOCUMENTATION

     4.1    EXISTING STORMWATER
     Existing stormwater drainage see attached Tod Noosa Plan number 09568 SK1
     (Appendix 5)

     4.2    PROPOSED STORMWATER DRAINAGE
     Proposed stormwater drainage plan, see attached Tod Consulting Plan Number 09568 SK3
     (Appendix 6)

     4.3    PROPOSED FUTURE STORMWATER
     Proposed future stormwater drainage plan showing over land drainage paths and future
     building sites, see Tod Consulting Plan number 09568 SK4 (Appendix 7)

5.   MAINTENANCE PLAN

     5.1     RAINWATER HARVESTING TANK
     Rainwater harvesting tanks must have an inlet filtration unit which will collect silt, leaves
     and any other debris before water enters the tank. This filtration unit must be thoroughly
     cleaned every 3 months and after all storm events which may have added large volumes of
     debris into the filter. This maintenance work is to be carried out by “Noosa Care” ground
     staff and be clearly written into the job description for the person responsible.

     5.2     DETENTION POND
     Detention pond maintenance will consist of regular cleaning of the pre-entry filtration unit
     every 3 months and or after every storm event which has deposited silt, leaves or other debris
     into the pond. This maintenance work is to be carried out by “Noosa Care” ground staff and
     be clearly written into the job description for the person responsible. The volume of the
     Detention Pond is to be checked every 12 months and silt build up is to be removed using a
     bobcat or similar machine.

     5.3     FOX OIL AND GREASE ARRESTOR
     Fox gross pollutant collector units (BPT 600) have a 50 litre capacity basket which
     collects silt. This basket must be inspected and cleaned out every 3 months and after all
     storm events which may have deposited silt and other debris into the basket. This
     maintenance work is to be carried out by the “Noosa Care” ground staff and be clearly
     written into the Job Description for the person responsible. The hydrocarbon capture chamber
     has a capacity of 330 litres and must be pumped out every 3 months or when the level      of
     hydro carbon reaches 300 litres. This work is to be contracted to a specialist waste
     disposal company who can suck up the hydrocarbons into a tanker and removed from site to
     be recycled.




                                                                               April, 2011 - 09568

Page 32

APPENDIX 1




             April, 2011 - 09568


[OCR of page images]
APPENDIX 1

April, 2011 - 09568 ||

Page 33

BIS NO G3MWAINOD 39 O1 SNOISNANIO TY

 

 

 

 

 

NOUWAOR NINO we

 

HOUvYOINLLNBIID

 

ROUVAEOINTINGIND

FRESE I
aan
soars ta

 

 

 

 

 

 

 

 

pOSSQ

 

 

 

 

 

 

 

 

 

 

 

 

 

€d] LOS |
ee gvouvsoan sovoos SSENSNEUNOAONITING Noy | NEES cee
= : a NILNWAABL ~ 3HVO VSOON ‘ {SNAva 40 NOISSINNEd WILLA
pe genesafO0S|__tuvinere NV1d SIS TVUYSAO NOXIG HALNAVd aeerey| NOXIG YHALNAVd > iva bo onde Sone
IWSWVSIHD ‘wxerg| H/EO/6O pve one seu) ‘O11 ‘Ald ONVISNSANO NOXIO WELNAYE 33H 40 NOUDNGOMATY - 1HORLAGOD. NOU:

 

 

AXVNIWITSYd

 

 

        

  

‘BNIT 0010 -

 

3NI1 0010, “

\

        

 

 

 

  

% Sr]
SNS PRA D TREO RR

lagyo) Sorina swsswons ove 3d Sv
CEISWEY SBOE EHNA 7B DMIONI |

 

ons nary Ons
N34 38 0
s2y0 NERS

00.01 252,

 

 

 

      

‘\

 

 

    

 

 

 

 

        

     

 

                 

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

   

 

 

 

 

 

 

! 1
yova1asToo0ot
iw J tswaeeneoranene \ 8 taal
fant
a NN | — marty
SCT ! Bs. ~ 4__[8
s TRS NE 39001 Lawes [ory te
“yl A (f OOM 3HONVI8 SnNONY y ae | 3
1 \ | Wes 8 CYVM AHLONO 8 L3YVOUVN /] ‘ 8
i J = 4
! Sy’ =
i an
' 5
’ ! 7
!
| 1 es 7 ~ |
: yOOT8 AMINA IN\ \i Ct
| ' P NINGY MAN \ —
1 rm NIWGY
oeO1 14 ! |
' ] yoore ONILSIXS
Bla ALIAILOV
a2: / J
sis '
* 1 ae Sie ee 1 7
i - i }
! x -4 J;
1 x 4
e = ' wanna aoe o
r ; L 7 is a rE C tA AY TM 34ND NEN. | AYMAN ONS
if ~ 2S f bee} i Z Vi:
\ Sef \ (a) 30078 TN
a == Syictina ayvo Iioags ‘han LEY ; iiosey
J} = gett ‘
“is ee! i] be / | FA U
i cnaresoery JIE GE ZLB | 39001 39001 7
SH LN | YN38OU yang als
' os.
' __ ears = 25
' = Ye ate
= i) Sn
' =i (w) yore , C] cock
! = ONIGTING SUYSAVIOAdS MAN A cr
! x be PR Mt Soon :
— enema ESE ae pomees! oo
| ; Ke yn = A Z ASVIIXAV :
1 <a Faw \\ | OSS x, GA _ f 1
! ee L FS Fives op 4 : '
=i ere ees ee eee ee renee emer See peek | ~ oe See = rem i
d t 3] SSF . ae Tess OO ee “poop
! \ ost vez cy e
toy songeeeren | pases — sawatze FTooo'e 8
cnranco dNSS8 ii 6g
é

E
2
8
%
2
S
8
R

—

OvELas | 0009;

'
!

1

|

 

 

Page 34

APPENDIX 2




             April, 2011 - 09568


[OCR of page images]
APPENDIX 2

April, 2011 - 09568 ||

Page 35

 

| hic Harvesting (Re-use Tank) | 2 ooy R 1inwater Harvesting Tank

The Atlantis® Re-use System has see Mt
proven effective in providing a regular == Atlantis® Drainage Cell
clean water supply for domestic and
commercial applications.

 

How It Works! Atlantis® Matrix® Washed
The system captures water from both ; Filtration Tank Modules fon a Pump
no tines

landscaped areas through surface Unit (small)
infiltration and from roof areas which are’ |

filtered through an Atlantis® Filtration
Unit. Clean water is retained within
the storage area away from harmful
U.V. light and heat remaining cool i
underground readily available for re- ia
use.

  
  

  

 

 

 

 

 

 

 

 

 

 

Applications: Typical applications
include flushing toilets, in washing
machines, watering gardens. and
washing cars.

NN A

 
 

20
n
oe

 

 

 

Page 36

APPENDIX 3




             April, 2011 - 09568


[OCR of page images]
APPENDIX 3

April, 2011 - 09568 ||

Page 37

     

  
                                

——je> EXISTING OVERLAND FLOW PATH !
(TOREMAIN) >

 

WIER = RL 8.65 x 2.0m WIDE

TOP BUND = RL 9.25 \ / TOP BUND = RL 9.25
/ BOTTOM BUND = RL 9.00 DETENTION TWL = RL 8.65 \ /

 

BATTERED BANK

 

     

 

 

   

SS

= {URW P<CSth\~ —— 2

 

 

 

 
    

 

 

    

 

 

 

  

 

 

 

 

   

 

 

 
        

   

  

 

 

 

 

 

 

     

 

   

 

 

  

 

 

 

— BASE RL_7.50 _ ——
NATURAL SURFACE ni BASE = 6.0m x 5.5m ri am
-
NATURAL SURFACE ‘stens | NEW SPECIAL/CARE BUILDING 6.0m |
oom |
BLOCK (A) |
DETENTION BASIN SECTION A ™ | aus
SCALE ‘400 NATURAL AT At TOP BUND /
SCALE 1.200 NATURAL AT A3 ROBENA _ ovret 7
LODGE | DISCHARGE
call = RL |
! RL |
| | 7 NTION TWL = RL 8.65 'f
100 DEPTH = 0.74m
ESCOTT PPE bs 9.40 4 BATTER MAX. WATER DEPTH = 1.15m 7
CURRENT DRAINAGE SYSTEM TO BE LODGE 7)
|

          

LOCATED AND CONNECTED AS
APPROPRIATE INTO NEW WORK.

 

 

 

 

 

 

 

 

 

| /
NEW SPECIAL on
\
\
t

 

 

 

 

   

 

           
  

 

 

 

        

 

   
   

 

 

   

            

 

 

 

  

     

   

“t EXISTING CARPARK UNDER \ ‘OVERLAND FLOW PATH
EXISTING mos \
ADMIN STAFF CARPARKING Ru ALP. \ \
18 BAYS UNDER | TINEW ADMIN & \\ \
ACTIVITY BLOCK HIG
SITE PLAN ENTRY BLOGK PONT \ \ |
| RL 10300 \ | \ |
et — et —(es CURRENT DRAINAGE SYSTEM 10 BE ! a | 4 .
LOCATED AND CO}
SCALE 1400 AT AT APPROPRIATE INTO N N LORIVENAY ots OVERLAND FLOW PATH \ S
SCALE 1800 AT A3 aie © UR, x >» ~ ~
sla Q ~s SON *
ne \/e
oN ws \ N
JOWNSTREAM _—_
len emracagenay N L 7 NEW HEADWALL \ |

           

   

mmmmme DENOTES EXISTING STORMWATER PIPE

   

DOROTHY WARD & HI

BLANCHE WOOD
LODGE

     

\QUSN
s

   

mmmmmmms =» DENOTES PROPOSED STORMWATER PIPE
(

|

I |
| Xx
) oN
CARPARKING SAYS (49 BAYS) ? / \

| , &
tin [ LLL wap
+ =

Ss
N ~
~

 

K.LP. eNotes KERB INLET PIT

 

   

 

 

 

S.LP. DENOTES SURFACE INLET PIT

FOX DENOTES FOX BPT600 GROSS POLLUTANT COLLECTION PIT

        
  

JP. DENOTES JUNCTION PIT

 

  

U.R.H.T. DENOTES UNDERGROUND RAINWATER HARVESTING TANK

 

 

    

 

 

eee 0100 LINE

ads

  
  

ee COOROY = NOOSA ROAD eg TOD

OM ar me me -

 

PROJECT DRAWING TITLE ASSOCIATED CONSULTANT

PROPOSED ADDITIONS TO PROPOSED STORM
PAYNTER DIXON

NOOSA CARE AGED RESIDENCES WATER WORKS PLAN & BUILDING YOUR BUSINESS
ENGINEERS

 

  

 

  

 

 

 

 
 

 

at
oUtWTV SS ROAD NN DRIVE, MILTON, QLD 4064 STRUCTURAL CIVIL
B TO SUIT NEW ARCHITECTURAL LAYOUT eres
* Drawing No. Issue
sk3_ [x78] |

 

 

 

 

 

 

 

 

 

 

I

 

 

Page 38

APPENDIX 4




             April, 2011 - 09568


[OCR of page images]
APPENDIX 4

April, 2011 - 09568 ||

Page 39

Gs
= > « ENVIRONMENTAL
SYSTEMS

Fox Model BPT600

Gross Pollutant Collection Unit with High Flow By-pass

- Specifications and Performance Rating

Fox Model Number
Description

Outlet Pipe

Chamber Material
Chamber Volume

Silt Basket Material

Total Silt Capacity - Chamber
Total Silt Capacity —- Basket

Grate

Treatable Flow rate*
Maximum Flow rate (ln By—pass)*

Sediment Removal > 0.8mm mesh*
Hydrocarbon Capture*
Retention at By—pass Flow rate*

BPT600
Surface — In Gross Pollutant Trap (GPT)

150 Dia.

12mm Medium Density Polyethylene
330 Litres

Medium Density Polyethylene

40 Litres
50 Litres

600 Sq. Heavy Duty — Lockable

5 Litres / sec.
20 Litres / sec.

> 99%
> 95%
100%

“Flow rate and Treatment Efficiencies determined during Full Scale Testing performed at Caloundra and
under the directions of a qualified Hydraulic Consulting Engineer. A full test report is available on request.

Fox Environmental Systems Pty Ltd Unit 2, 8 Dual Avenue Warana QLD 4575

Ph. (07) 5437 8455 | Fax (07) 5437 8488 | [email protected] | www.foxenviro.com.au

 

Page 40

 

 

 

 

 

 

 

 

Z/9TOT-D3dS-b¥ :0N Bulmeiq

0z:T s3]29S

O10Z/TO/ET raqeq

ssl Aq UMeIG
S@z/0091d8

aA bBumeiq

 

suoneoyioads waysAS
palord

 

 

“panss| Sem

3] YDIYM 404 JeUY URLA asodund JayyO Aue 403 pasn.
q JOU YsNW Jf “PIT Ald SwaysAs jeqUeWUOWAUG
x04 Jo Ayadoug ayy st uBisap pue Bumeld SILL
“uone||e\SuT

aucyaq SaQUOUNY 1290] AAQeIad Aq panoudde

aq 0] wayshs “aseyzind ay Aq pabebua aq 0}
uawsaped) ‘sjuawaunbau sayuougne aAgejas WIM
aduepscoze ul UaWSsapesy paylyed Aq paljeysul aq 0}
‘SuORIaUUOD jeQLZpaje pue Buquinyd jpy ‘4awoysnd
Aq paGueue se syeyap ssd2ul6ua 0} Juaipel6 pue
az{s gejs *AJuo uopeyuasaiday 2AEWaYDS e S| SILL

 

 

 

SWHISAS
TWINJWNOUIANZ

-®
o9

 

 

 

 

uoneAey

 

                

  

"pno
payyeq ela sxe

FANS Ww SZ
JaJEMWIOYS OL
————

Poe >

ie
o
we 2

 

ssedAg mo|4 ubi

“awyeq
pulyag paddeny
suoqiesolpAH

 

UM yoxsed

ostt

 

weld

 

OZ

       

sseq-Ag MO}4 UBIH
ym JexSeg AIS

aqeID g sseID

“WUE. URY}
Ja|JWS SpI]OS pue syis Jo UOQUAJes pue aunjded
AU} 10y GG UeLY Ja}e916 yo Adua|yya ue Sey
0091dd XOJ BYL “ALYeq O43 EIA ApoauIp yX9 0}
jyouns ssaoxa smojje ssed-Aq Moy YyBly ayy azed
MOY BIGe}ee4) BY} Spasoxa AysuayU! UJes B43 JT
“yuasaid aq Aew yeuj suoqueso1pAy

Jo sannuenb Joulw bujujeyas ‘ayjeq ay} eIA

Syxe pue Jequieyd uleW ay) SiazUa UAL) JyoUNY
“PAAOWAJ Je IIS PUe Ysey] BBYM Jayseq IIS

24) yBnosyy aje1 MOY pa|josquod e sey UN SUL
*sysixo suoqueooupAy Jo sanijuenb

JOUJW 40, JeWUaIOd e pUe pa|jo.jUOD aq youUeDd
SLIgap J8U}O pue Yse.} a1aYyM Seale uado

asn 40j paubisap si 3] ‘ssed-Aq moy yBiy e uM
dex queynijod payjed e St 0091dd I@POW X04 AUL
S1IV14d SS330¥d

 

‘pauinbal JI sjleyep sanbey
‘aBueyp |JIM SLAAUT :3}0N
ujeig

payed ‘Ba *saounos Jayj0
WO.y SUOIBUUOD JOy - SIBSIY
ayed5 ,G, Sse

Jona] YaAUT WEEE

JOAN sa}eMWIOIS WWOST
suondo sigeieny

 

 

ayel MOYAg 3e UOQUA}SY
aunydep uogsed0upAH
WWE") <|eAOWaY JUaIPaS
ede> 39ySeq 3
Apede spijos
aqyey Moly WNWIXeW

 

das/sas 07

2es/Se.Qn S aJeY MO|y payealL
pasiuenjen/.g.sseid ayes)
Soul] OE SWINJOA Jequieyd

AddW WWCT fevayew
SNOLLVYDISID3dS

 

yeAno wUszz IM

 

UOHEHEISUT OOI.Lda JO Heyeq WewWSYDS

 

 

Page 41

APPENDIX 5




             April, 2011 - 09568


[OCR of page images]
APPENDIX 5

April, 2011 - 09568 ||

Page 42

        

 

——f> OVERLAND FLOW PATH

  

AUXILARY
LODGE ‘

  

fA OVERLAND FLOW.

-—3s

 

 

 

 

 

 

 

 

 

      

 

J )
rea ™ )
‘OVERLAND FLOW -~
ve

7 Q100 LINE

 

BUTLER
LODGE

    

 

       

ROBENA
LODGE

 

 

 

  

 

 

 

          
      

 

 

ESCOTT
LODGE

JU a

 

 

 

 

 

 

LEGACY
LODGE

 

      

 

 

aT | Lh

, EXISTING |
Ly ADMIN [

 

 

     

EXISTING CARPARK UNDER

(18BAYS)

  

 

 

MACDONALD
LODGE

 

        

 

 

 

 

Y OVERLAND FLOW ’

 

 

 

 

EXISTING
SHED

 

     
 

 

    

MARGARET &
ANGUS
LODGE

DOROTHY WARD &
BLANCHE WOOD
LODGE

 

 

LEGEND

 

) TREES TO BE RETAINED

 

 

 

 

mee 0100 LINE

_ _—
\ _
ab 20 6 10 5 0 25m

 

SCALE 1:400 AT At
SCALE 1:800 AT A3

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

PROJECT DRAWING TITLE ASSOCIATED CONSULTANT
TOD CONSULTING PTY. LTD.
PROPOSED ADDITIONS TO EXISTING SITE
NOOSA CARE AGED RESIDENCES STORM WATER PLAN Go EAYNTER DIXON || TOD
at ENGINEERS
COOROY-NOOSA ROAD Boe a ee ee mam ~StéS — mm a
TEWANTIN pc me, pa a
Ree yeu ARCHITECTURAL LAYOUT Su Me < Travng to an
Drawing Record ) 09568 SK1 x] B | |

 

 

 

 

 

 

Page 43

APPENDIX 6




             April, 2011 - 09568


[OCR of page images]
APPENDIX 6

April, 2011 - 09568 ||

Page 44

     

  
                                

——je> EXISTING OVERLAND FLOW PATH !
(TOREMAIN) >

 

WIER = RL 8.65 x 2.0m WIDE

TOP BUND = RL 9.25 \ / TOP BUND = RL 9.25
/ BOTTOM BUND = RL 9.00 DETENTION TWL = RL 8.65 \ /

 

BATTERED BANK

 

     

 

 

   

SS

= {URW P<CSth\~ —— 2

 

 

 

 
    

 

 

    

 

 

 

  

 

 

 

 

   

 

 

 
        

   

  

 

 

 

 

 

 

     

 

   

 

 

  

 

 

 

— BASE RL_7.50 _ ——
NATURAL SURFACE ni BASE = 6.0m x 5.5m ri am
-
NATURAL SURFACE ‘stens | NEW SPECIAL/CARE BUILDING 6.0m |
oom |
BLOCK (A) |
DETENTION BASIN SECTION A ™ | aus
SCALE ‘400 NATURAL AT At TOP BUND /
SCALE 1.200 NATURAL AT A3 ROBENA _ ovret 7
LODGE | DISCHARGE
call = RL |
! RL |
| | 7 NTION TWL = RL 8.65 'f
100 DEPTH = 0.74m
ESCOTT PPE bs 9.40 4 BATTER MAX. WATER DEPTH = 1.15m 7
CURRENT DRAINAGE SYSTEM TO BE LODGE 7)
|

          

LOCATED AND CONNECTED AS
APPROPRIATE INTO NEW WORK.

 

 

 

 

 

 

 

 

 

| /
NEW SPECIAL on
\
\
t

 

 

 

 

   

 

           
  

 

 

 

        

 

   
   

 

 

   

            

 

 

 

  

     

   

“t EXISTING CARPARK UNDER \ ‘OVERLAND FLOW PATH
EXISTING mos \
ADMIN STAFF CARPARKING Ru ALP. \ \
18 BAYS UNDER | TINEW ADMIN & \\ \
ACTIVITY BLOCK HIG
SITE PLAN ENTRY BLOGK PONT \ \ |
| RL 10300 \ | \ |
et — et —(es CURRENT DRAINAGE SYSTEM 10 BE ! a | 4 .
LOCATED AND CO}
SCALE 1400 AT AT APPROPRIATE INTO N N LORIVENAY ots OVERLAND FLOW PATH \ S
SCALE 1800 AT A3 aie © UR, x >» ~ ~
sla Q ~s SON *
ne \/e
oN ws \ N
JOWNSTREAM _—_
len emracagenay N L 7 NEW HEADWALL \ |

           

   

mmmmme DENOTES EXISTING STORMWATER PIPE

   

DOROTHY WARD & HI

BLANCHE WOOD
LODGE

     

\QUSN
s

   

mmmmmmms =» DENOTES PROPOSED STORMWATER PIPE
(

|

I |
| Xx
) oN
CARPARKING SAYS (49 BAYS) ? / \

| , &
tin [ LLL wap
+ =

Ss
N ~
~

 

K.LP. eNotes KERB INLET PIT

 

   

 

 

 

S.LP. DENOTES SURFACE INLET PIT

FOX DENOTES FOX BPT600 GROSS POLLUTANT COLLECTION PIT

        
  

JP. DENOTES JUNCTION PIT

 

  

U.R.H.T. DENOTES UNDERGROUND RAINWATER HARVESTING TANK

 

 

    

 

 

eee 0100 LINE

ads

  
  

ee COOROY = NOOSA ROAD eg TOD

OM ar me me -

 

PROJECT DRAWING TITLE ASSOCIATED CONSULTANT

PROPOSED ADDITIONS TO PROPOSED STORM
PAYNTER DIXON

NOOSA CARE AGED RESIDENCES WATER WORKS PLAN & BUILDING YOUR BUSINESS
ENGINEERS

 

  

 

  

 

 

 

 
 

 

at
oUtWTV SS ROAD NN DRIVE, MILTON, QLD 4064 STRUCTURAL CIVIL
B TO SUIT NEW ARCHITECTURAL LAYOUT eres
* Drawing No. Issue
sk3_ [x78] |

 

 

 

 

 

 

 

 

 

 

I

 

 

Page 45

APPENDIX 7




             April, 2011 - 09568


[OCR of page images]
APPENDIX 7

April, 2011 - 09568 ||

Page 46

     

 

—je> EXISTING OVERLAND FLOW PATH
(To REMAN)

 

 

 

     
     
    

 

 

 

mE CRE TORTaRD,>
SS RE Za

7
7 NX ==

 

 

 

AUXILARY
LODGE

  

 

 

 

 

 

                     
                     

 

 

                      

EXISTING
SHEDS (|

 

 

 

 

2
a NEW SPECIAL/GARE BUILDING
~ BLOCK (A)

“N NR 10380

 

 

Q100 LINE
\ sks oo / 7

hf /

 

 

 

 

ROBENA
LODGE

   

BUTLER
LODGE

 

   

 

 

 

 

 

 

 

YS

/ /
NEW SPECIAL CARE BUILDING \
BLOCK (B)

RL 10.350,

 

 

  

PIPE IL: 9.66

Qs

 

 

ESCOTT |
LODGE t

 

 

 

 

 

 

 

 

 

 

          

 

 

 

 

EXISTING CARPARK UNDER

(18BAYS)

STAFF CARPARKING
18 BAYS UNDER
ACTIVITY BLOCK

  

EXISTING
ADMIN

 

   

 

 

 

            

 

[NEW ADMIN &
| ENTRY BLOGK

| RL 10300 \

 

 

     

   

MACDONALD
LODGE

 

 

 

          

   

                

 

  

 

 

 

 

 

 

        

   

     

 

NEW DRIVEWAY 7 y J > — _I \
obs OVERLAND FLOW PATH | Kk
Ss = \
ri RS ~N
(X \
EXISTING ree 1.4 \\, levemravoayenay

| SHED MARGARET & DOROTHY WARD & l
>= ANGUS BLANCHE WOOD

  

LODGE LODGE

 

 

 

me 0100 LINE

 

  

  

ee” a _————

 

 

 

  

 

 

 

 

 

 

 

 

SCALE 1400 AT At oo TS ee co ee :
ee pe ee O0ROY NOOSA ROAD _(g PDE
gremteee PROJECT DRAWING TITLE ASSOCIATED CONSULTANT
e2=22-|| PROPOSED ADDITIONS TO PROVISION FOR
NOOSA CARE AGED RESIDENCES FUTURE STORM Gd PAYNTER DIXON TOD
at WATER WORKS PLAN ENGINEERS ~
COOROY-NOOSA ROAD ocean STRUCTURAL em sone |= wn
TEWANTIN pocorn =
REVISED TO SUIT NEW ARCHITECTURAL LAYOUT
PRELIMINARY ISSUE - {ese
~~“ 1 sa [xD] |

 

 

 

 

 

 

 
 

 

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.