1.   INTRODUCTION

     1.1    PROJECT OVERVIEW
     Noosa Care Tewantin (Carramar) has engaged Paynter and Dixon to carry out a feasibility
     and Development Approval for the next phase of the growth of “Noosa Care” at Tewantin.
     This proposal includes two new special care buildings, an extension to the administration and
     entry building, and associated car parking and service driveway. (See Appendix 1)

     1.2    INTENT OF THE S.M.P.
     This S.M.P. is for use by Civil and Hydraulic Engineers, Compliance Assessors, Construction
     and Maintenance Contractors so that the project has minimal environmental impact and
     complies with Government Legislation and Council Policies.

     1.3    DESIGN PHILOSOPHY
     As the special care buildings are the major portion of the construction proposed covering
     some 3,000.00 square meters the total stormwater detention will be positioned adjacent to
     these buildings. All clean stormwater run-off from the New Admin and Entry Block will be `
     disposed of directly through new stormwater drains into the existing creek system, all
     stormwater from the carpark and access driveway will be cleaned from hydrocarbon
     contamination only and then be disposed of directly to the existing creek system. Individual
     blocks will have their own rainwater harvesting tanks positioned adjacent to the buildings.

2.   S.M.P. IMPLEMENTATION

     2.1     RAIN HARVESTING
     Rainwater harvesting will be implemented by the use of “Atlantis Type” underground
     tanks. (See Appendix 2) the overflow from the tanks adjacent to the Special Care Buildings
     must be discharged to the proposed detention pond adjacent to the Special Care Block „A‟.
     The over flow from the new administration and entry block must discharge to the overland
     flow path on the southern side of the Special Care Block „B‟. (See Appendix 3)

     2.2     HYDROCARBON CAPTURE
     Hydrocarbon capture will be undertaken by the use of Fox Gross Pollutant units (BPT 600).
     These units are most successful where trash and other debris cannot be controlled and where
     the potential for the presence of hydrocarbon is high but the quantities involved are minor
     which is the case in staff and visitor carparking. A Fox BPT 600 will remove pollutants at
     their source eliminating the duplication of catch pits (See Appendix 4)

     2.3     NO NET INCREASE IN OVERALL DISCHARGE
     No net increase in overall discharge will be achieved by the use of a detention pond
     situated adjacent to the new Special Care Block „A‟. This pond will be designed to
     detain and release water in a controlled manner to achieve a no worsening impact on the
     down stream flows than that flow existing before this project commences. The detention will
     take into account the un-detained run-off from the new administration and entry block, and
     the new carpark.




                                                                               April, 2011 - 09568
Log in to download the original file

Appendix F.pdf · 4.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.