4.   DOCUMENTATION

     4.1    EXISTING STORMWATER
     Existing stormwater drainage see attached Tod Noosa Plan number 09568 SK1
     (Appendix 5)

     4.2    PROPOSED STORMWATER DRAINAGE
     Proposed stormwater drainage plan, see attached Tod Consulting Plan Number 09568 SK3
     (Appendix 6)

     4.3    PROPOSED FUTURE STORMWATER
     Proposed future stormwater drainage plan showing over land drainage paths and future
     building sites, see Tod Consulting Plan number 09568 SK4 (Appendix 7)

5.   MAINTENANCE PLAN

     5.1     RAINWATER HARVESTING TANK
     Rainwater harvesting tanks must have an inlet filtration unit which will collect silt, leaves
     and any other debris before water enters the tank. This filtration unit must be thoroughly
     cleaned every 3 months and after all storm events which may have added large volumes of
     debris into the filter. This maintenance work is to be carried out by “Noosa Care” ground
     staff and be clearly written into the job description for the person responsible.

     5.2     DETENTION POND
     Detention pond maintenance will consist of regular cleaning of the pre-entry filtration unit
     every 3 months and or after every storm event which has deposited silt, leaves or other debris
     into the pond. This maintenance work is to be carried out by “Noosa Care” ground staff and
     be clearly written into the job description for the person responsible. The volume of the
     Detention Pond is to be checked every 12 months and silt build up is to be removed using a
     bobcat or similar machine.

     5.3     FOX OIL AND GREASE ARRESTOR
     Fox gross pollutant collector units (BPT 600) have a 50 litre capacity basket which
     collects silt. This basket must be inspected and cleaned out every 3 months and after all
     storm events which may have deposited silt and other debris into the basket. This
     maintenance work is to be carried out by the “Noosa Care” ground staff and be clearly
     written into the Job Description for the person responsible. The hydrocarbon capture chamber
     has a capacity of 330 litres and must be pumped out every 3 months or when the level      of
     hydro carbon reaches 300 litres. This work is to be contracted to a specialist waste
     disposal company who can suck up the hydrocarbons into a tanker and removed from site to
     be recycled.




                                                                               April, 2011 - 09568
Log in to download the original file

Appendix F.pdf · 4.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.