Original source · versioned page text
Appendix F
2
Hydrograph Summary Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cms) (min) (min) (cum) (m) (cum)
1 Rational 0.049 1 8 30.9 ------ ------ ------ pre developed catchment 1 & 2
2 Rational 0.096 1 8 59.7 ------ ------ ------ pre developed catchment 3
3 Combine 0.145 1 8 87.1 1, 2 ------ ------ TOTAL PRE DEVELOPED
4 Rational 0.144 1 6 67.2 ------ ------ ------ post development catchment 3
5 Rational 0.074 1 6 34.7 ------ ------ ------ post development catchment 1 & 2
6 Reservoir 0.091 1 9 64.5 4 7.89 768 DETENTION BASIN
7 Combine 0.152 1 7 97.9 5, 6 ------ ------ TOTAL POST DEVELOPED
J:\2009\09568_Noosacare_Inc_Carramar\Design\hydraulics\DETENTION-2-
Return Period: 2 Year ABOVE
Tuesday,
GROUND05-04.gpw
Apr 5, 2011
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.