Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2016-05-16 General Committee Agenda

of 53

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


         General Committee
              Meeting


                 Monday, 16 May 2016

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Jess Glasgow, Ingrid Jackson,
             Joe Jurisevic, Frank Pardon, Brian Stockwell, Tony Wellington



   “Engagement with our community to protect and enhance our lifestyle”
Log in to download the original file

2016-05-16 General Committee Agenda(PDF, 10MB).pdf · 10.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 52 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                                                         16 MAY 2016


TABLE OF CONTENTS

ITEM                                                                                               PAGE

ATTENDANCE & APOLOGIES                                                                                -

PRESENTATIONS                                                                                         -

ITEMS REFERRED FROM PLANNING & ENVIRONMENT COMMITTEE                                                  -

1      APPLICATION TO CHANGE DEVELOPMENT APPROVAL FOR OPERATIONAL
       WORK ENGINEERING WORK VEHICLE CROSSOVER at 6 HABITAT PLACE
       NOOSA HEADS (OPW15/0197.01)
       (Previously distributed in Planning & Environment Committee Agenda, 10 May 2016, Page 3)
       Reason for referral: Cr Wellington disagrees with the recommendation.

5      CARBON REDUCTION POLICY
       (Previously distributed in Planning & Environment Committee Agenda, 10 May 2016, Page 67)
       Reason for referral: Councillors requested amendments to the Policy which are to be
       presented in a further report for consideration at the General Committee meeting.
       (Further report provided at Item 1, Page 3)

6      KIN KIN QUARRY BREACH
       LITIGATION AND APPLICATION TO CHANGE EXISTING COURT APPROVAL
       (Previously distributed in Planning & Environment Committee Agenda, 10 May 2016, Page 72)
       Reason for referral: Significance of the issue.

ITEMS REFERRED FROM SERVICES & ORGANISATION COMMITTEE                                                 -

1      MANAGEMENT OF ROADSIDE MEMORIALS POLICY
       (Previously distributed in Services & Organisation Committee Agenda, 10 May 2016, Page 3)
       Reason for referral: Councillors requested amendments to the Policy which are to be
       presented in a further report for consideration at the General Committee meeting.
       (Further report provided at Item 2, Page 7)

5      ELECTRIC BUSES TENDER
       (Previously distributed in Services & Organisation Committee Agenda, 10 May 2016, Page 16)
       Reason for referral: To allow additional time for the outstanding items identified in the
       report to be provided to Councillors.

REPORTS DIRECT TO GENERAL COMMITTEE                                                                   3
1      FURTHER REPORT - EMISSION REDUCTION POLICY                                                     3
2      FURTHER REPORT - MANAGEMENT OF ROADSIDE MEMORIALS POLICY                                       7
3      BUDGET REVIEW - MARCH QUARTER 2016                                                            11
4      FINANCIAL PERFORMANCE REPORT - APRIL 2016                                                     30
5      SUNSHINE COAST INSTITUTE OF TAFE (NOOSA) -TEWANTIN CAMPUS                                     37

CLOSED SESSION
Refer to Item 6 above under Items Referred from Planning & Environment Committee

                                                                                         Page 2 of 53

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                                         16 MAY 2016


REPORTS DIRECT TO GENERAL COMMITTEE

1                        FURTHER REPORT - EMISSION REDUCTION POLICY
DOCUMENT INFORM AT ION




Author                              Executive Manager, Debra Iezzi
                                    Executive Office

Index                               ECM/Subject/21.31 - Sustainability

Attachments                         1.    Emission Reduction Policy


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Executive Manager to the Planning and Environment
Committee Meeting dated 10 May 2016 and the further report to the General Committee Meeting
dated 16 May 2016 and adopt the Emission Reduction Policy provided at Attachment 1 to the
General Committee Report.


REPORT
Following discussion of the Carbon Reduction Policy presented to the Planning and Environment
Committee Meeting on the 10 May 2016, the Executive Manager was requested to submit a
revised draft policy for consideration by the General Committee on 16 May 2016.

The revised Policy incorporates several proposed amendments which are shown in track
changes mode in Attachment 1 to this Report.

Worth noting is the proposed change to the title of the policy from a Carbon Reduction Policy to
an Emission Reduction Policy.


Previous Council Consideration

Ordinary Meeting Minutes 24 September 2015, Item 17, Page 10

NOOSA CARBON REDUCTION & ENERGY EFFICIENCY PLAN
That Council note the report by the Sustainability Project Officer to the Planning &Organisation
Committee Meeting dated 15 September 2015 and:
A.                       Agree to the development of a Carbon Reduction & Energy Efficiency Plan;
B.                       Undertake a community engagement process to develop the Carbon Reduction & Energy
                         Efficiency Plan as proposed in Attachment 1 attached to the report; and
C.                       Refer the proposed budget for this project for inclusion in the next budget review.




                                                                                                         Page 3 of 53

Section 4

GENERAL COMMITTEE MEETING AGENDA                                                             16 MAY 2016


Ordinary Meeting Minutes 19 November 2015, Item 10, Page 11

SUSTAINABILITY PRINCIPLES
That Council note the report by Principal Strategic Planner to the Planning & Organisation
Committee Meeting dated 10 November 2015 and:
A.       Adopt the Sustainability Principles for the purpose of guiding Council’s corporate strategy
         development and to provide a common basis for achieving sustainability principles;
B.       Request the Chief Executive Officer to incorporate the Sustainability Principles into
         Council’s key strategy documents under development; and
C.       Request the Chief Executive Officer to develop sustainability indicators to accompany the
         Sustainability Principles to monitor progress towards long term sustainability.

Finance & Risk

There is currently no budget allocation for the implementation of this policy in the current financial
year however, a new initiative was submitted for Council consideration in the 2016/17 budget for
a project to review Council’s energy usage, measure carbon emissions and identify options to
achieve greater energy efficiency and reduce greenhouse gas emissions.

Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

The Sustainability Officer was consulted in relation to the coverage of the policy and the
Governance Advisor was consulted in relation to the Policy format.

Cr Frank Wilkie and Mayor Tony Wellington were consulted in relation to the proposed changes
to the Policy.


Departments/Sections Consulted:

X     Chief Executive Officer                Community Services                 Corporate Services
      Executive Officer to the Mayor & CEO   Community Facilities               Financial Services
      Executive Support                      Community Development              ICT
                                             Libraries & Galleries              Procurement & Fleet
                                             Local Laws                         Property & Facilities
                                             Waste & Environmental Health       Revenue Services

x     Executive Office                       Planning & Infrastructure
      Community Engagement                   Building & Plumbing Services
      Customer Service                       Civil Operations
      Economic Development                   Infrastructure Planning & Design
x     Governance                             Planning & Environment
      Human Resources                        Strategic Land Use Planning
x     Sustainability




                                                                                             Page 4 of 53

Section 5

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016


                                   Attachment 1




                                   Page 5 of 53

GENERAL COMMITTEE MEETING AGENDA                                                       16 MAY 2016

                                                                                       Attachment 1

    zm         Niele                                                       Council Policy
  ff  @ |     COUNCIL                                          EMISSION CARBON

    Corporate Plan Reference:                A Sustainable Council
    Endorsed by Council:                     <Insert Date of Ordinary Meeting >
    Policy Author:                           Executive Manager

    POLICY BACKGROUND
    On 24 September 2015 Council agreed to the development of a Carbon Reduction and Energy
    Efficiency Plan and on 19 November 2015 Council adopted its Sustainability Principles, with those
    principles to be incorporated into Council's key strategy documents. The first principle noted that
    resources are to be sustainably managed so that the lifestyle of the community is preserved,
    without compromising the ability of future generations to meet their own needs.

    Noosa has a beautiful natural environment and its community is known for a strong commitment to
    sustainability and protection of that natural environment. Consequently, Noosa Shire sought and
    received recognition as a UNESCO Biosphere Reserve, aiming to achieve a sustainable balance
    between humans and the environment.

    Although there is no legislative requirement for councils to have an energy or carbon plan or to
    establish carbon emissions targets, many local governments are taking the initiative to be both
    proactive and resource efficient. Some Australian local government areas have already committed
    to zero emission targets with the aim of reducing greenhouse gas emissions and climate change.
    As a leader in developing and managing the sustainability of the shire, Council's own actions to
    reduce greenhouse gas emissions demonstrate its commitment to this issue.
    Through information and guidance, the community can also be supported to improve sustainability
    at the household level.

    COUNCIL POLICY
    Council commits to a reduction in carbon and greenhouse gas emissions with a view to
    establishing a zero emissions target in Council's operations and services. We will lead by example
    and become an inspiration to the Noosa Shire community and beyond.
    We seek to take meaningful action to reduce the organisation’s impact on climate change_and to
    achieve environmental benefits and/or long term cost savings  by reducing our overall energy
    requirements through a combination of energy efficiency measures and transitioning to renewable
    energy sources. In doing so we will build a Council that is increasingly resilient to rising energy and
  | fuelpetro! prices and better able to meet our agreed sustainability principles.

    The Policy will drive greater efficiency in Council’s use of natural resources by:

    a) __ Investing directly in appropriate actions - It is important for the long-term sustainability of
         Council’s operations that we are efficient and effective. This includes gaining a better
         understanding of current energy usage and reducing the amount of electricity and fuel
         consumed, especially where sourced from fossil fuels. Council can potentially make
         improvements via new technologies and options that focus on clean energy.

                                                                                          Page 1

                                                                                       Page 5 of 53

Section 6

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 6 of 53

GENERAL COMMITTEE MEETING AGENDA                                                         16 MAY 2016

   COUNCIL POLICY - <INSERT POLICY TITLE>

   b)   Leading by example and inspiring change - Council’s own actions to reduce greenhouse
        gas emissions have the ability to demonstrate best practice options to the community.
  Cc)    Measuring and monitoring — Council can not only set a zero emissions target, but also
        staged and achievable targets in pursuit of that goal. Monitoring and measuring progress will
        be an important aspect of our approach.
   Council will establish a feasible but courageous date by which it aims to have total Council
   operations and activities achieving zero greenhouse gas and carbon emissions. This will be
   supported by a Zero Emissions Action Plan to be developed.

   ROLES AND RESPONSIBILITIES

   Council is grateful to have received contributions and advice from many community members,
   particularly with regards to developing a possible Noosa Future Energy Plan. Council will continue
   to provide opportunities for community participation in developing a zero emissions target.
   This Policy will have implications for every Noosa Council department. A rational approach will be
   taken including setting realistic timeframes and targets, identifying strategic options, pinpointing
   potential barriers and developing actions.

   RELEVANT LEGISLATION
   Council’s Corporate Plan
   Council’s Operational Plan
   Noosa Sustainability Principles
   Council decision on 24 September 2015 to develop a Carbon Reduction and Energy Efficiency
   Plan

   DEFINITIONS

   Emissions
   Emissions in this policy refers to CO2 emissions.

   Zero Emissions
   The term zero net emissions and carbon neutral can be used interchangeably.     Being carbon
   neutral means that the net greenhouse gas emissions associated with an organisation’s or
   Council’s activities are equal to zero. It is achieved through a combination of measuring and
   reducing greenhouse gas emissions and purchasing of carbon offsets.

   Version control
    Version   Reason/ Trigger              Change (Y/N)  Endorsed/ Reviewed by   Date

                                                                                         Page 2

                                                                                         Page 6 of 53

Section 7

GENERAL COMMITTEE MEETING AGENDA                                                          16 MAY 2016


2                        FURTHER REPORT - MANAGEMENT OF ROADSIDE MEMORIALS POLICY
DOCUMENT INFORM AT ION




Author                           Director Community Services, Alan (Fox) Rogers
                                 Community Services Department

Index                            ECM/ Subject/ Council Policies

Attachments                      1.   Revised Draft Management of Roadside Memorials Policy


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Director Community Services to the Services and
Organisation Committee Meeting dated 10 May 2016 and a further report to the General
Committee Meeting dated 16 May 2016 and adopt the Management of Roadside Memorials
Policy provided at Attachment 1 to the General Committee report.


REPORT
Following discussion of a draft Management of Roadside Memorials Policy presented to the
Services and Organisation Committee Meeting on 10 May 2016, the Director of Community
Services was requested to submit a revised draft policy for consideration by the General
Committee on 16 May 2016.

Previous Council Consideration

Ordinary Meeting, 7 May 2015, Item 20, Page 9
That Council note the report by the Governance Advisor to the Planning and Organisation
Committee Meeting dated 28 April 2015 and …
B    Repeal the current Noosa Shire Council Local Laws 2011 No 1 to No 6 (inclusive) on 30
     June 2015, and make the proposed Noosa Shire Council Local Laws No 1 to No 6
     (inclusive) ( provided at Attachment 1 to the report) to commence operation on 1 July 2015


Finance & Risk

Nil.

Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

The revised policy has been drafted following discussions between the Director Community
Services, Cr Wilkie, the Local Laws Coordinator and the Governance Advisor, refer to
Attachment 1.


                                                                                              Page 7 of 53

Section 8

GENERAL COMMITTEE MEETING AGENDA                                                               16 MAY 2016



Departments/Sections Consulted:

    Chief Executive Officer                x   Community Services                 Corporate Services
    Executive Officer to the Mayor & CEO       Community Facilities               Financial Services
    Executive Support                          Community Development              ICT
                                               Libraries & Galleries              Procurement & Fleet
                                           x   Local Laws                         Property & Facilities
                                               Waste & Environmental Health       Revenue Services

x   Executive Office                           Planning & Infrastructure
    Community Engagement                       Building & Plumbing Services
    Customer Service                           Civil Operations
    Economic Development                       Infrastructure Planning & Design
x   Governance                                 Planning & Environment
    Human Resources                            Strategic Land Use Planning
    Sustainability




                                                                                               Page 8 of 53

Section 9

GENERAL COMMITTEE MEETING AGENDA    16 MAY 2016


                                   Attachment 1




                                    Page 9 of 53

GENERAL COMMITTEE MEETING AGENDA                                                             16 MAY 2016

                                                                                            Attachment 1

          zm         NOOSA                                                           Council Policy
                               —
          | @    |  COUNCIL                                                      Management of
                                                                        Roadside Memorials

         Corporate Plan Reference:                    ‘Working in partnership with our community’
         Endorsed by Council:                        <signature>                   <DD Month, YYYY>
         Policy Author:                              Local Laws Coordinator

        POLICY BACKGROUND
        The purpose of this policy is to provide guidance to Noosa Councilss-ocalLaws—team— staff _for
        managing and, where necessary, removing roadside memorials within Noosa Shire_in response to a
        complaint or issues of safety and nuisance.-
        Pursuant to section 2, Schedule 7 ‘Alteration or improvement to local government controlled areas and
        roads’ of the Noosa Shire Council Subordinate Local Law No 1 (Administration) 2015, an approval is
  |     not required for an installation beside a road of a memorial ... comprising of a-white-cross_provided the
        installation complies with the local government policy for the activity. The temporary placement of floral
        tributes, plastic flowers and memorabilia at the memorial location is also acceptable. All roadside
        memorials must comply with this policy.
        POLICY
        Council does not encourage the placement of roadside memorials within Council controlled road
        reserves, but recognises that some members of the community may wish to temporarily commemorate
        the passing of a loved one as a result of a road or other accident by installing a roadside memorial.
        Council has provided the mechanism for members of the community to put in place a temporary
        memorial without approval subject to the requirements specified in the local laws and this policy.
        This policy has been developed to ensure that roadside memorials:
        (a)   Are placed in a safe location.
        (b)   Can be easily maintained.
        (c)   Do not cause issues for nearby property owners and users of the area.
        (d)   Do not create a hazard to road users, cyclists or pedestrians.
  |     The location of a roadside memorial should be selected to minimise the—risk-of-safety risks to all
        persons and any interference to nearby properties and users of the surrounding area.
        A roadside memorial must be located in a position where it will not:
        (a)   Distract driver attention or interfere with the role of any traffic control item.
        (b)   Be hazardous to passing traffic, cyclists and/or pedestrians, or prevent appropriate maintenance
              of the road reserve.
        (c)   Cause interference with the nearby residences or users of the area.

        Unless otherwise approved by way of formal application, all memorials (including floral tributes and
        memorabilia) are to be temporary and thus remain in place for a maximum period of 3 months.

                                                                                             Page 9 of 53

Section 10

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 10 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                  16 MAY 2016

        COUNCIL POLICY — ROADSIDE MEMORIAL POLICY (LOCAL LAWS)
        Construction and Installation
        A roadside memorial shouldmust:
        (a)   Gonsistefawhite-cross-and must netexceed Be contained within the following dimensions:
              °     750mm height
              °     500mm in-totalheightor width
        (b)   Be placed on the far side of the roadside drain and away from the roadway shoulder.
        (c)   Not be placed in a maintenance zone.
        (d)   Not be placed within 5 meteres of a roundabout or on any centre median strip.
              Not be-ol    ‘within 5        eth      luk
        (ef)  Not be attached to trees or roadside infrastructure.
        (fg)  Not be on a pedestrian footpath.
        (gh)  Be frangible (i.e. easily breaking off if a vehicle were to strike it) and less than< 75mm diameter.

        Visiting and Maintenance
        Council will not accept responsibility for the maintenance of any roadside memorial, nor the loss,
  |     damage, _or removal of roadside memorials that may occur due to required road maintenance,
        construction activities or vandalism.
        Any person visiting a memorial must take due care for their own safety and the safety of others
        including motorists, pedestrians and cyclists. Council does not encourage the gathering of persons
        within the road reserve.

        Removal of Memorial
        If there are any concerns raised with Council about public safety or interference to nearby residents or
        users of the area surrounding a memorial as a result of persons visiting the memorial, or the placement
        and construction of the memorial itself (including the proliferation of floral tributes and memorabilia),
        Council will investigate the matter and an authorised person may determine that it is appropriate to
        remove the memorial.
        Appropriate reasons for the removal of a roadside memorial may include the following:
  |     (a) _ The memorial is considered by an authorised person to be a road or public safety hazard.
        (b)   Road works are required at the relevant location.
  |     (cd)  An objection or complaint is made to Council by nearby residents, businesses, road users, or
              users of the area surrounding the memorial in regards to any aspect of the roadside memorial,
              including the activity of visitors to the memorial or loss of amenity and, in the opinion of an
              authorised person, that objection or complaint is considered reasonable.
        (de)  The memorial has not been adequately maintained.
        (e) _ The memorial interferes with garden or roadside maintenance.
  |    Fhe-memorialinterferes_with_garden_or roadside_maintenance—Where possible, Council officers will
        attempt to contact and consult the persons responsible for erecting the memorial prior to its removal.
        RELEVANT LEGISLATION AND COUNCIL POLICY
        Noosa Shire Council Local Law No 1 (Administration) 2015
        Noosa Shire Council Subordinate Local Law No 1 (Administration) 2015
        Local Government Act 2009
        Noosa Design Principles
        Version control:
         Version    Reason/ Trigger                Change (Y/N)  Endorsed/ Reviewed by      Date

                                                                                                    Page 2

                                                                                                 Page 10 of 53

Section 11

GENERAL COMMITTEE MEETING AGENDA                                                                     16 MAY 2016


3                        BUDGET REVIEW - MARCH QUARTER 2016
DOCUMENT INFORM AT ION




Author                              Manager Financial Services, Wayne Jensen
                                    Corporate Services Department

Index                               ECM/Subject/7.09 – 2015/2016 Budget

Attachments                         1.    Proposed Budget Adjustments – Operating
                                    2.    Proposed Budget Adjustments – Capital
                                    3.    Summary of Submissions
                                    4.    Revised Budget Financial Statements


EXECUTIVE SUMMARY
The Local Government Act 2009 and Local Government Regulation 2012 require Council to
undertake regular reviews of the adopted budget to ensure it remains reflective of planned
activities to be funded through the budget period. Consequently, a full review of all budgets has
been undertaken using income and expenditure figures as at the end of March 2016.

RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 16 May 2016 and approve the requested changes to the budget for the 2015/16
financial year, as outlined in the attached Budget Financial Statements.


REPORT
Section 170(3) of the Local Government Regulation 2012 allows Council, by resolution, to amend
the budget at any time before the end of the financial year. As such, formal reviews have been
scheduled to be undertaken following the close of each quarter (July to September; October to
December; January to March), using year-to-date figures as the basis for any revised forecasts.

This review provides an opportunity to take account of any additional information that has come
to light since the last review and to ensure the most accurate figures are included in the year-end
forecast. The March quarter review establishes a revised 30 June position, which then forms the
basis for development of the 2016/17 budget and the ensuing 10-year financial plan.

The Revised Budget Financial Statements clearly identify statement line items that have been
affected by the proposed adjustments.

Key considerations for Council’s budget adjustments include:

                       All increases in operating expenditure should be funded. If variances cannot be funded at
                         the branch or departmental level, then operational savings, determined after collaboration
                         with other departments, should be identified to ensure no degradation in the overall
                         operating position for Council.

                       Proposed reallocation of savings or additional revenue will be confirmed by the leadership
                         team based on business risk assessment.

                       The business capacity to deliver the adopted works program should be considered as part
                         of the evaluation process for all projects.



                                                                                                    Page 11 of 53

Section 12

GENERAL COMMITTEE MEETING AGENDA                                                   16 MAY 2016


1.   Operating Budget Adjustments

There have been a number of adjustments to the operating budget proposed, as outlined in
Attachment 1, with an overall improvement in the operating position of $68,644. Requests for
additional expenditure have been fully funded with savings or additional revenue.

Highlighted proposed budget adjustments include:

   Rental income – additional revenue from ferry operations due to favourable weather
     conditions through the summer period.
   Sales Revenue – increased revenue from holiday parks due to favourable weather
     conditions, plus an increase in revenue from gallery operations.
   Grants and subsidies – operating – recognition of additional grant revenue received (offset
     by expenditure) for traineeships undertaken, Home Assist, and community development
     (Active Mums).
   Other recurrent income – additional sales from the purchase and resale of replacement
     bins to Cleanaway in accordance with the contract.
   Employee benefits – adjustments aligning to actual YTD expenditure, including a higher
     allocation of labour costs to capital projects than originally estimated.
   Materials and services – additional expenditure to reflect grants; asset management plan
     development ($72k); minor reallocations between contract services and employee costs;
     adjustments between line items for fleet management; implementation of a proposed Flying
     Fox management plan for Wallace Park ($33k); adjustments within Works Operations
     between gravel roads and quarry operations; and reallocation of operational funding to the
     capital program ($11k NAC and $15k Tewantin Admin building).

2.   Capital Works Program Adjustments

There have been a number of adjustments to the capital works program to reflect emergent
renewal works undertaken and variations across different programs. Details for changes to each
program are outlined in Attachment 2. The total program has increased by $143,680 with no
significant impact expected on the ability to deliver the current program. The majority of
adjustments relate to the reallocation of funding from the Emergent renewals budget to specific
projects, and to also account for savings on completed projects.

Previous Council Consideration

The budget was amended in February 2016 to account for adjustments identified from the
December quarter.

Finance & Risk

There has been a slight increase to the operating result following the budget review, and overall
Council is forecasting a surplus of $950k.

Apart from the $142k in new upgrade projects, changes to the capital program are largely funded
through the rescheduling of projects and redirection from the Emergent Works allocation. Capital
program changes do not impact the operating position, though the forecast cash position is
marginally reduced.

All financial sustainability ratios remain within (or exceed) target ranges, as outlined in the
attached Budget Financial Statements.




                                                                                  Page 12 of 53

Section 13

GENERAL COMMITTEE MEETING AGENDA                                                                     16 MAY 2016


Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

All areas of Council are consulted through the budget review process and the submissions
received from Managers are reviewed by the Leadership Team in consultation with the Mayor
prior to presentation to Council.

Departments/Sections Consulted:

x     Chief Executive Officer                x   Community Services                 x   Corporate Services
      Executive Officer to the Mayor & CEO       Community Facilities                   Financial Services
      Executive Support                          Community Development                  ICT
                                                 Libraries & Galleries                  Procurement & Fleet
                                                 Local Laws                             Property & Facilities
                                                 Waste & Environmental Health           Revenue Services

x     Executive Office                       x   Planning & Infrastructure
      Community Engagement                       Building & Plumbing Services
      Customer Service                           Civil Operations
      Economic Development                       Infrastructure Planning & Design
      Governance                                 Planning & Environment
      Human Resources                            Strategic Land Use Planning
      Sustainability




                                                                                                    Page 13 of 53

Section 14

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016


                                                   Attachment 1




                                   Page 14 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                 16 MAY 2016

   Capital / Operating                       Operating                                                                                                                                                                                                        Attach m ent 1
   Sum of Proposed Budget Adjustment                                                                                                                                                                                                  Revenue / Expense
 Department                                   Cost Centre / Project Description                      Comments                                                                                                                                        Expense                 Revenue    Grand Total
     Community Services                         Noosa Aquatic Centre                                 50% cost of Fridge and Freezer that was moved to Capital 500623 - funded from this account.                                                      (11,042)                              (11,042)
                                                                                                     Contractor employed from Oct 15 to Mar 16 for lifeguard services (but budgeted in casual salaries). Now converted to casual employee              13,000                                13,000
                                                                                                     effective Apr 16.
                                                                                                     Contractor employed from Oct 15 to Mar 16 for lifeguard services (but budgeted in casual salaries). Now converted to casual employee             (26,000)                              (26,000)
                                                                                                     effective Apr 16. Contractor swim coaches employed in 2015/2016 but previously budgeted as casual employees.
                                                                                                     Contractor swim coaches employed in 2015/2016 but previously budgeted as casual employees.                                                        13,000                                13,000
                                              Noosa Aquatic Centre Total                                                                                                                                                                              (11,042)                              (11,042)
                                                Respite Centre                                       Salary increments added in BR2 without corresponding adjustment to contract services                                                             (25,576)                              (25,576)
                                              Respite Centre Total                                                                                                                                                                                    (25,576)                              (25,576)
                                                Pest Management                                      Saving identified to assist Public Health Team inspections.                                                                                      (10,000)                              (10,000)
                                              Pest Management Total                                                                                                                                                                                   (10,000)                              (10,000)
                                                Public Health                                        Contractors required to backfill employees on sick leave to meet inspection requirements.                                                         10,000                                10,000
                                              Public Health Total                                                                                                                                                                                      10,000                                10,000
                                                Waste Collection                                     SULO bins - demand for bins has increased over budget                                                                                             45,000                                45,000
                                                                                                     Sulo bins demand greater than budget                                                                                                                                     (45,000)      (45,000)
                                              Waste Collection Total                                                                                                                                                                                   45,000                 (45,000)            E
                                                Noosa Regional Gallery                               Gallery Shop Review. Additional shop revenue to offset cost of Review                                                                             11,500                 (11,500)            -
                                              Noosa Regional Gallery Total                                                                                                                                                                             11,500                 (11,500)            -
                                                Community, Culture and Sport                         Budget offset for the Cooroy Sports Complex signage. Using money from Project Grants savings                                                     (15,000)                              (15,000)
                                                                                                     The sports field audit is proposed to be funded from savings in the community grants program                                                      10,000                                10,000
                                                                                                     The signs for Cooroy Sports Complex are proposed to be funded from savings in the community grants allocation                                      5,000                                 5,000
                                              Community, Culture and Sport Total                                                                                                                                                                             E                                    E
                                                Active Mums                                          $10,000 state grant and additional $5,000 from Council's Grant funding reserve                                                                    15,000                                15,000
                                                                                                     Council request for additional funding for Active Mums was successful.                                                                                                   (10,000)      (10,000)
                                              Active Mums Total                                                                                                                                                                                        15,000                 (10,000)        5,000
                                                Home Assist Secure                                   Salary increments added in BR2 without corresponding adjustment to contract services                                                              (2,600)                               (2,600)
                                              Home Assist Secure Total                                                                                                                                                                                 (2,600)                               (2,600)
                                                Home Assist Secure                                   Additional grant funds received offset by expenditure                                                                                             16,975                 (16,975)            -
                                              Home Assist Secure Total                                                                                                                                                                                 16,975                 (16,975)            -
                                                Noosa Community Support Projects                     Reallocate budget from materials & services to employee benefits                                                                                 (20,000)                              (20,000)
                                              Noosa Community Support Projects Total                                                                                                                                                                  (20,000)                              (20,000)
                                                Noosa Community Support Projects                     Reallocate budget from materials & services to employee benefits                                                                                  20,000                                20,000
                                              Noosa Community Support Projects Total                                                                                                                                                                   20,000                                20,000
   Community Services Total                                                                                                                                                                                                                            49,258                 (83,475)      (34,217)
     Corporate Services                         North Shore Beach Campground                         Income increased due to excellent weather, favourable tourist numbers                                                                                                    (21,000)      (21,000)
                                              North Shore Beach Campground Total                                                                                                                                                                                              (21,000)      (21,000)
                                                North Shore Ferry                                    Income increased due to excellent weather, favourable tourist numbers                                                                                                    (20,000)      (20,000)
                                              North Shore Ferry Total                                                                                                                                                                                                         (20,000)      (20,000)
                                                Boreen Point Campground                              Income increased due to excellent weather, favourable tourist numbers                                                                                                    (18,000)      (18,000)
                                                                                                     Manager's Commission calculated against earned revenue for the anniversary, based on the invoice for the period April 2015 till March             15,203                                15,203
                                                                                                     2016
                                              Boreen Point Campground Total                                                                                                                                                                            15,203                 (18,000)       (2,797)
                                                Fleet Plant and Workshop Operations                  An increase in budget for vehicle safety lights is required due to fleet changeover.                                                              20,000                                20,000
                                                                                                     Increase in fleet maintenance budget offset by savings.                                                                                           40,000                                40,000
                                                                                                     Increase in budget for the replacement of small plant and equipment. Includes the purchase of 6 Tait TM 8254 vhf mobile radios offset by          16,476                                16,476
                                                                                                     savings.
                                                                                                     Council negotiated a reduction in insurance expense for all fleets vehiclesresulting in savings against the original budget.                     (40,036)                              (40,036)
                                                                                                     A reduction in the number of leased fleet vehicles has resulted in an operational saving against the original budget.                            (36,440)                              (36,440)
                                              Fleet Plant and Workshop Operations Total                                                                                                                                                                      :                                    :
   Corporate Services Total                                                                                                                                                                                                                            15,203                 (59,000)      (43,797)
     Executive Office                           Customer Service                                     Budget transferred to Capital Job 500609to develop concept plans for a one stop Customer Services centre.                                        (15,000)                              (15,000)
                                              Customer Service Total                                                                                                                                                                                  (15,000)                              (15,000)
                                                Human Resources                                      Add Trainee Grant revenue along with 2015/16 expenses (partially rate funded)                                                                      9,629                 (12,500)       (2,871)
                                                                                                     Service Recognition usually catered for in-house. This year will be catered for externally. Recognition of staff approach support by senior        2,000                                 2,000
                                                                                                     leadership team.
                                              Human Resources Total                                                                                                                                                                                    11,629                 (12,500)         (871)
                                                Workplace Health and Safety                          Savings in Salaries due to vacancy                                                                                                                (2,000)                               (2,000)
                                              Workplace Health and Safety Total                                                                                                                                                                        (2,000)                               (2,000)
                                                Elected Members                                      Correction to BR2 salary increments                                                                                                               (5,642)                               (5,642)
                                              Elected Members Total                                                                                                                                                                                    (5,642)                               (5,642)
   Executive Office Total                                                                                                                                                                                                                             (11,013)                (12,500)      (23,513)
     Planning & Infrastructure                  Asset Management and Service Programming             Consultancy services to assist with service modelling to determine reseal priorities for capital program.                                         30,000                                30,000
                                                                                                     Initial issue of PPE & uniforms to staff members that meet the criteria for outdoor work.                                                         7,766                                  7,766

                                                                                                                                                               Page 14 of 53

Section 15

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 15 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                                                             16 MAY 2016

      Planning & Infrastructure                 Asset Management and Service Programming          Wages allocated to capital projects not originally budgeted.                                                                              (79,766)                            (79,766)
                                                                                                  Development of detailed asset management plans initially focusing on Hastings Street and Sand Pumping systems.                             42,000                               42,000
                                              Asset Management and Service Programming Total                                                                                                                                                       -                                   -
                                                Gravel Roads                                      Due to good weather over the summer period, there has been a reduction in maintenance requirements on gravel roads.                       (55,000)                            (55,000)
                                              Gravel Roads Total                                                                                                                                                                            (55,000)                            (55,000)
                                                Bushland Reserves                                 Add Trainee Grant revenue along with 2015/16 expenses (partially rate funded)                                                              12,450                (12,500)         (50)
                                              Bushland Reserves Total                                                                                                                                                                        12,450                (12,500)         (50)
                                                 Ringtail Quarry                                  To Provide quarry materials for future capital and maintenance projects, such as Cootharabra Rd culvert upgrade, Black Mountain Rd         55,000                               55,000
                                                                                                  slip.
                                              Ringtail Quarry Total                                                                                                                                                                          55,000                               55,000
                                                Plumbing Services                                 Add Trainee Grant revenue along with 2015/16 expenses (partially rate funded)                                                              17,338                (12,500)        4,838
                                              Plumbing Services Total                                                                                                                                                                        17,338                (12,500)        4,833
                                                Environmental Services                            Development of Flying Fox Management Plan, Roost Management Permit, and installation of Sprinkler systems at Wallace Park                  33,095                               33,095
                                              Environmental Services Total                                                                                                                                                                   33,095                               33,095
    Planning & Infrastructure Total                                                                                                                                                                                                          62,883                (25,000)       37,883
      Chief Executive Office                    Chief Executive Office                            $10,000 state grant and additional $5,000 from Council's Grant funding reserve towards Active Mums Program                                 (5,000)                             (5,000)
                                              Chief Executive Office Total                                                                                                                                                                   (5,000)                             (5,000)
    Chief Executive Office Total                                                                                                                                                                                                             (5,000)                             (5,000)
    Grand Total                                                                                                                                                                                                                             111,331               (179,975)     (68,644)

                                                                                                                                                            Page 15 of 53

Section 16

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016



                                                   Attachment 2




                                   Page 16 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                             16 MAY 2016

     Capital / Ope Capital                                                                                                                                                                         Attachment 2
     Sum of Proposed Budget Adjustment                                                                                                                         Revenue / Expense
     CAPEX Ren CAPEX PROGRAM                                      Cost Centre / Project Description              Comments                                       Expense                 Revenue                 Grand Total
        Renewal     Corporate Buildings                              Noosaville Depot Workshop Roller Doors      Reduction in budget as project is to be delivered             (11,000)                              (11,000)
                                                                     Replacement                                 below estimates.
                                                                     Noosaville Depot Fire Panel and system      Fire panel requires replacement                                27,949                                27,949
                                                                     replacement
                                                                     Tewantin Council Office - Aircon Replacement Replacement of air conditioning units at the                  50,000                                50,000
                                                                                                                 Tewantin Council Office.
                 Corporate Buildings Total                                                                                                                                      66,949                                66,949
                    Parks, Playgrounds & Reserves                    Lake Macdonald Botanic Gardens Shade        Current shade house structure requires urgent                  15,000                                15,000
                                                                     Structure Design                            replacement
                 Parks, Playgrounds & Reserves Total                                                                                                                            15,000                                15,000
                    Community Facilities                             NLC - Stage 2 Construction of redesigned    Reconfiguration of reception area requires                     15,000                                15,000
                                                                     reception area                              additional funding following evaluation of quotes.

                                                                    NAC Replacement of Fridge and Freezer        Replacement of fridge and freezer at the NAC.                  11,042                                11,042
                                                                     NAC - Regrout & recaulk of the Program Pool Budget increase required to complete renewal                    3,000                                 3,000
                                                                                                                 works following analysis of quotes received.
                 Community Facilities Total                                                                                                                                     29,042                                29,042
                    Fleet - Plant Replacement                        Plant and fleet replacement program 2015-   Funding is required for the purchase of 10                    195,000                               195,000
                                                                     2016                                        vehicles that have lease expiry between now &
                                                                                                                 30 June 2016.
                 Fleet - Plant Replacement Total                                                                                                                               195,000                               195,000
                    Pathways & Enabling Facilities                   Peregian Beach David Low Way Pathway Re- Re-alignment of a Pathway at 236 David Low                       150,000                 (75,000)       75,000
                                                                     alignment                                   Way, Peregian Beach is required due to traffic
                                                                                                                 issues. The owner of the property has agreed to
                                                                                                                 a cost sharing arrangement with Council to have
                                                                                                                 the works completed.
                 Pathways & Enabling Facilities Total                                                                                                                          150,000                 (75,000)       75,000
                    Sealed Roads Network                             Whole of Shire Other Emergent Works         Reallocation of emergent works program ($900k                (186,859)                             (186,859)
                                                                     Program 2015-2016                           balance remaining).
                 Sealed Roads Network Total                                                                                                                                   (186,859)                             (186,859)
                    Coastal Canals and Waterways                     Munna Point Foreshore Stabilisation         Project delivered below budget. Realisation of                 (8,198)                               (8,198)
                                                                                                                 savings.
                                                                     Noosa Heads Ravenswood Park Public Jetty    Project delivered below budget. Realisation of                 (6,233)                               (6,233)
                                                                    Rehabilitation                               savings.
                                                                     Tewantin Doonella Street Public Jetty       Project delivered below budget. Realisation of                 (3,852)                               (3,852)
                                                                    Rehabilitation                               savings.
                                                                     Sunshine Beach - Beach Access 30            Project delivered below budget. Realisation of                (17,403)                              (17,403)
                                                                                                                 savings.
                                                                     Sunrise Beach - Beach Access 34 Replace     Project delivered below budget. Realisation of                (27,747)                              (27,747)
                                                                     stairs adjacent road                        savings.
                 Coastal Canals and Waterways Total                                                                                                                            (63,433)                              (63,433)
                    Parks & Playgrounds                              Tewantin Splash Park Playground Renewal     Project delivered below budget. Realisation of                (16,787)                              (16,787)
                                                                                                                 savings.
                                                                     Peregian Beach Skate park Shade Sail        Project delivered below budget. Realisation of                 (6,761)                               (6,761)
                                                                     renewal                                     savings.
                                                                     Whole of Shire Park shelter- Renewal Park _— Project delivered below budget. Realisation of                (4,539)                               (4,539)
                                                                     shelters 2015/16                            savings.

                                                                                                                           Page 16 of 53

Section 17

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 17 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                              16 MAY 2016

     Capital / Ope Capital
     Sum of Proposed Budget Adjustment                                                                                                                         Revenue / Expense
     CAPEX Ren CAPEX PROGRAM                                      Cost Centre / Project Description             Comments                                       Expense                 Revenue                 Grand Total
        Renewal     Parks & Playgrounds                              Whole of Shire Playground refurbishments   Project delivered below budget. Realisation of                (11,976)                              (11,976)
                                                                     2015/2016                                  savings.
                                                                     Whole of Shire Park Furniture Renewal      Project delivered below budget. Realisation of                (12,317)                              (12,317)
                                                                     2015/2016                                  savings.
                 Parks & Playgrounds Total                                                                                                                                    (52,379)                              (52,379)
                    Public Transport Infrastructure                  Noosa Bus Station Safer Streets Program    Project delivered below budget. Realisation of                 (3,322)                               (3,322)
                                                                                                                savings.
                 Public Transport Infrastructure Total                                                                                                                         (3,322)                               (3,322)
                    Stormwater Drainage                              Whole of Shire Pipe re-lining/ rehabilitation Reduction in budget as project is to be delivered          (74,998)                              (74,998)
                                                                     program 2016                               below estimates.
                 Stormwater Drainage Total                                                                                                                                    (74,998)                              (74,998)
     Renewal Total                                                                                                                                                             75,000                 (75,000)           (0)
        Upgrade     Corporate Buildings                              Customer Service Centre                    Stage 1 is planning and design for                             15,000                                15,000
                                                                                                                redevelopment of reception and customer
                                                                                                                service areas at Tewantin Admin building.
                 Corporate Buildings Total                                                                                                                                     15,000                                15,000
                    Community Facilities                             Multiple Sites - Supply and Installation of PFC Power Correction Factor equipment installed at            42,680                                42,680
                                                                     Controller                                 identified sites in September 2015 per Council
                                                                                                                resolution 09/04/2015. Electricity cost savings
                                                                                                                are expected.
                 Community Facilities Total                                                                                                                                    42,680                                42,680
                    Pathways & Enabling Facilities                   Tewantin Poinciana Avenue Shared Path      No lighting was considered in the original scope               30,000                                30,000
                                                                     Upgrade Design & Const                     and this budget is for the minimum amount of
                                                                                                                lighting required to support the pathway works.
                 Pathways & Enabling Facilities Total                                                                                                                          30,000                                30,000
                    Holiday Parks                                    North Shore Beachfront Campground —        Additional funds required following evaluation of              56,000                                56,000
                                                                     Planning Consultancy                       tenders received (refer Council resolution
                                                                                                                17/12/2016).
                 Holiday Parks Total                                                                                                                                          56,000                                 56,000
     Upgrade Total                                                                                                                                                            143,680                               143,680
     Grand                                                                                                                                                                    218,680                 (75,000)      143,680
     Total

                                                                                                                            Page 17 of 53

Section 18

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016


                                                   Attachment 3




                                   Page 18 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                                              16 MAY 2016

      Budget Review 4 - March Quarter Review 2015/16                                                                                                                                                                         Attachment 3
      Summary   of Submissions Received                            $   649860601     $  285512374      $     75,036.18  $   657364219
       te) (leila)  pole Tada g          Cost Centre / Project     2015/16 Current  2015/16 Actuals   Proposed          Proposed New     Capital / Operating     CAPEX PROGRAM            lore Te BOC lad     ere)
                                        fel Tot a] +) (lle)        Budget                             Budget            Budget
                                                                                                      CTE airs
      CP001          Planning &          Noosaville Depot Fire           $17,000.00            $51.00      $27,949.00         $44,949.00 Capital                 Corporate Buildings          lan Pearce      Fire panel requires replacement
                     Infrastructure      Panel and system
                                         replacement

      CP003          Planning &          Lake Macdonald Botanic              $0.00             $0.00         $15,000.00       $15,000.00 Capital                 Parks, Playgrounds &         Sara Cooke      Current shade house structure requires
                     Infrastructure      Gardens Shade Structure                                                                                                 Reserves                                     urgent replacement
                                         Design
      CP004         Community Services NLC - Stage 2 Construction       $45,000.00          $2,855.00        $15,000.00       $60,000.00 Capital                 Community Facilities        Ash Saward       Reconfiguration of reception area requires
                                         of redesigned reception                                                                                                                                              additional funding following evaluation of
                                         area                                                                                                                                                                 quotes.

      CP005         Community Services NAC Replacement of                    $0.00         $11,042.00        $11,042.00       $11,042.00 Capital                 Community Facilities        Ash Saward       Replacement of fridge and freezer at the
                                         Fridge and Freezer                                                                                                                                                   NAC.
      CP006         Community Services NAC - Regrout & recaulk of       $30,000.00             $0.00          $3,000.00       $33,000.00 Capital                 Community Facilities        Ash Saward       Budget increase required to complete
                                         the Program Pool                                                                                                                                                     renewal works following analysis of quotes
                                                                                                                                                                                                              received.
      CP007         Corporate Services   Multiple Sites - Supply and         $0.00        $42,680.00        $42,680.00        $42,680.00 Capital                 Community Facilities       Michael Shave     Power Correction Factor equipment installed
                                         Installation of PFC                                                                                                                                                  at identified sites in September 2015 per
                                        Controller                                                                                                                                                            Council resolution 09/04/2015. Electricity
                                                                                                                                                                                                              cost savings are expected.

      CP008          Executive Office    Customer Service Centre             $0.00             $18.00       $15,000.00        $15,000.00 Capital                 Corporate Buildings          Debra lezzi     Stage 1 is planning and design for
                                                                                                                                                                                                              redevelopment of reception and customer
                                                                                                                                                                                                              service areas at Tewantin Admin building.
      CPO009         Planning &          Tewantin Council Office -           $0.00         $18,789.00       $50,000.00        $50,000.00 Capital                 Corporate Buildings          Allan Hazell    Replacement of air conditioning units at the
                     Infrastructure      Aircon Replacement                                                                                                                                                   Tewantin Council Office.
      CP010         Corporate Services   Plant and fleet replacement  $1,854,000.00     $1,258,914.00      $195,000.00     $2,049,000.00 Capital                 Fleet - Plant               Phill Parkman    Funding is required for the purchase of 10
                                         program 2015-2016                                                                                                       Replacement                                  vehicles that have lease expiry between now
                                                                                                                                                                                                              & 30 June 2016.
      CP011          Planning &          Tewantin Poinciana             $180,000.00         $9,358.00       $30,000.00       $210,000.00 Capital                 Pathways & Enabling         Joe Kuzmer       No lighting was considered in the original
                     Infrastructure      Avenue Shared Path                                                                                                     Facilities                                    scope and this budget is for the minimum
                                         Upgrade Design & Const                                                                                                                                               amount of lighting required to support the
                                                                                                                                                                                                               pathway works.
      CP012         Corporate Services   North Shore Beachfront         $50,000.00          $7,120.00       $56,000.00       $106,000.00 Capital                 Holiday Parks               Narelle Read     Additional funds required following evaluation
                                         Campground — Planning                                                                                                                                                of tenders received (refer Council resolution
                                        Consultancy                                                                                                                                                           17/12/2016).

      CP013          Planning &          Whole of Shire Other         $1,087,732.00            $0.00     -($186,859.00)      $900,873.00 Capital                 Sealed Roads Network       Bryan OConnor     Reallocation of emergent works program
                     Infrastructure      Emergent Works Program                                                                                                                                               ($900k balance remaining).
                                         2015-2016

                                                                                                                                            Page 18 of 53

Section 19

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 19 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                                               16 MAY 2016

      Budget Review 4 - March Quarter Review 2015/16
      Summary   of Submissions Received                             $  6498,606.01    $  2855123.74     $     75,036.18  $   6,573,642.19
      Podesta)      pel er Tadioaig      Cost Centre / Project      2015/16 Current  2015/16 Actuals   Proposed          Proposed New      Capital / Operating     CAPEX PROGRAM            lore Te meric led   ber ae
                                        Description               f= 117s [sT=)4                       Budget            Budget
                                                                                                      Pat R ils
      CP014          Corporate Services  Noosaville Depot                 $17,795.00            $0.00      -($11,000.00)        $6,795.00 Capital                 Corporate Buildings         Phill Parkman     Reduction in budget as project is to be
                                         Workshop Roller Doors                                                                                                                                                  delivered below estimates.
                                         Replacement                                                         eres
      CP015          Planning &          Munna Point Foreshore           $49,028.00        $40,830.45        -($8, 197.55)     $40,830.45 Capital                 Coastal Canals and           David Shing      Project delivered below budget. Realisation
                    Infrastructure      Stabilisation                                                           —                                                Waterways                                      of savings.                             =
      CP016          Planning &          Noosa Heads Ravenswood          $59,000.00        $52,766.52      -($6,233.48)        $52,766.52 Capital                 Coastal Canals and           David Shing      Project delivered below budget. Realisation
                     Infrastructure      Park Public Jetty                                                                                                       Waterways                                      of savings.
                    -                   Rehabilitation      :                                                                          et                                  a                                     :        -       ;            ;          |
      CP017          Planning &          Tewantin Doonella Street         $53,921.00       $50,069.31      -($3,851.69)        $50,069.31 Capital                 Coastal Canals and           David Shing      Project delivered below budget. Realisation
                     Infrastructure      Public Jetty Rehabilitation                                                                                             Waterways                                      of savings.
      CP018          Planning &          Sunshine Beach - Beach          $45,000.00        $27,597.22      -($17,402.78)       $27,597.22 Capital                 Coastal Canals and           David Shing      Project delivered below budget. Realisation
                     Infrastructure      Access 30                                                                                                               Waterways                                      of savings.
      CP019          Planning &          Sunrise Beach - Beach           $50,000.00         $22,252.61     -($27,747.39)       $22,252.61 Capital                 Coastal Canals and           David Shing      Project delivered below budget. Realisation
                     Infrastructure      Access 34 Replace stairs                                                                                                Waterways                                      of savings.
                                         adjacent road                                                                        =
      CP020          Planning &          Tewantin Splash Park            $130,000.00       $113,212.90     -($16,787.10)      $113,212.90 Capital                 Parks & Playgrounds         Dallas Bickley    Project delivered below budget. Realisation
                     Infrastructure      Playground Renewal                                                       ee                                                                                            of savings.
      CP021          Planning &          Peregian Beach Skate park       $80,000.00         $73,239.45       -($6,760.55)      $73,239.45 Capital                 Parks & Playgrounds         Dallas Bickley    Project delivered below budget. Realisation
                     Infrastructure      Shade Sail renewal                                                                                                                                                     of savings.
      CP023          Planning &          Whole of Shire Park shelter     $45,000.00         $40,461.29      -($4,538.71)       $40,461.29 Capital                 Parks & Playgrounds         Dallas Bickley    Project delivered below budget. Realisation
                     Infrastructure      - Renewal Park shelters                                                                                                                                                of savings.
                                         2015/16                                                                     ss
      CP024          Planning &           Whole of Shire Playground      $100,000.00       $88,024.16      -($11,975.84)       $88,024.16 Capital                 Parks & Playgrounds         Dallas Bickley    Project delivered below budget. Realisation
                     Infrastructure      refurbishments 2015/2016                                                                                                                                               of savings.
      CP025          Planning &          Whole of Shire Park             $50,000.00        $37,683.07      -($12,316.93)       $37,683.07 Capital                 Parks & Playgrounds         Dallas Bickley    Project delivered below budget. Realisation
                     Infrastructure      Furniture Renewal                                                                                                                                                      of savings.
                                         2015/2016                                                                  ee
      CP026          Planning &          Noosa Bus Station Safer         $100,000.00       $96,678.00        -($3,322.00)      $96,678.00 Capital                 Public Transport             Adam Britton     Project delivered below budget. Realisation
                     Infrastructure      Streets Program                                                         =                                                Infrastructure                                of savings.
      CP027          Planning &          Whole of Shire Pipe re-         $149,998.00         $3,198.00     -($74,998.00)       $75,000.00 Capital                 Stormwater Drainage         Bryan OConnor     Reduction in budget as project is to be
                     Infrastructure      lining/ rehabilitation                                                                                                                                                 delivered below estimates.
      |                                 _ program 2016                                                                                                                                                                                                   |
      CP028          Planning &          Peregian Beach David Low             $0.00             $0.00       $150,000.00       $150,000.00 Capital                 Pathways & Enabling       Nicholas Wellwood _ Re-alignment of a Pathway at 236 David Low
                     Infrastructure      Way Pathway Re-                                                                                                          Facilities                                    Way, Peregian Beach is required due to
                                        alignment                                                                                                                                                               traffic issues. The owner of the property has
                                                                                                                                                                                                                agreed to a cost sharing arrangement with
                    _                                                               :                :       agen t           ~    oe                                                               :           Council to have the works completed.
      CP028          Planning &          Peregian Beach David Low             $0.00             $0.00      -($75,000.00)     -($75,000.00) Capital                Pathways & Enabling       Nicholas Wellwood = Re-alignment of a Pathway at 236 David Low
                     Infrastructure      Way Pathway Re-                                                                                                          Facilities                                    Way, Peregian Beach is required due to
                                        alignment                                                                                                                                                               traffic issues. The owner of the property has
                                                                                                                                                                                                                agreed to a cost sharing arrangement with
                                                                                                                                                                                                                Council to have the works completed.
      cso01          Community Services Pest Management                  $169,816.16        $91,036.14     -($10,000.00)      $159,816.16 Operating                                            lan Florence     Saving identified to assist Public Health
                                                                                                                                                                                                                Team inspections.
      cso01          Community Services Public Health                    $36,988.81        $69,275.32         $10,000.00       $46,988.81 Operating                                            lan Florence     Contractors required to backfill employees on
                                                                                                                                                                                                                sick leave to meet inspection requirements.
      Ccso02         Community Services Waste Collection                 $152,000.00       $156,473.00       $45,000.00       $197,000.00 Operating                                            lan Florence     SULO bins - demand for bins has increased
                                                                                                 ae                   :       Sei       a                                                                       over budget
      Cs002          Community Services Waste Collection                -($76,000.00)     -($63,973.00)    -($45,000.00)    -($121,000.00) Operating                                           lan Florence     Sulo bins demand greater than budget

                                                                                                                                             Page 19 of 53

Section 20

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 20 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                                            16 MAY 2016

      Budget Review 4 - March Quarter Review 2015/16
      Summary of Submissions Received                              $   6498606.01    $   2855.123.74   $     75,036.18  $   6,573,642.19
       ofl   Tor)    oleate g            Cost Centre / Project     2015/16 Current   2015/16 Actuals  Proposed          Proposed New     Capital / Operating     CAPEX PROGRAM            lore To Mere ec lad ere
                                        Description               P-]1fe[eleg                         Budget            Budget
                                                                                                      PTE ites
      CS003         Community Services Noosa Regional Gallery                 $0.00            $0.00         $11,500.00       $11,500.00 Operating                                      Kerri Contini         Gallery Shop Review. Additional shop
                                                                                                                                                                                                              revenue to offset cost of Review

      Cso03         Community Services Noosa Regional Gallery          -($19,835.00)     -($26,772.00)    -($10,000.00)     -($29,835.00) Operating                                     Kerri Contini         Gallery Shop Review. Additional shop
                                                                                                                                                                                                              revenue to offset cost of Review
      CS003         Community Services Noosa Regional Gallery           -($6,521.00)      -($5,211.00)      -($1,500.00)     -($8,021.00) Operating                                     Kerri Contini         Gallery Shop Review. Additional shop
                                                                                                                                                                                                              revenue to offset cost of Review
      cs004         Community Services Community, Culture and             $5,000.00            $0.00          $5,000.00       $10,000.00 Operating                                      Alison Hamblin        The signs for Cooroy Sports Complex are
                                         Sport                                                                                                                                                                proposed to be funded from savings in the
                                                                                                                                                                                                              community  grants allocation
      cs004         Community Services Community, Culture and           $304,802.00       $236,520.00     -($15,000.00)      $289,802.00 Operating                                      Alison Hamblin        Budget offset for the Cooroy Sports Complex
                                        Sport                                                                                                                                                                 signage. Using money from Project Grants
                                                                                                                                                                                                              savings
      Cs004         Community Services Community, Culture and            $50,250.00       $44,185.00         $10,000.00       $60,250.00 Operating                                      Alison Hamblin        The sports field audit is proposed to be
                                        Sport                                                                                                                                                                 funded from savings in the community grants
                                                                                                                                                                                                              program
      Cso0s         Community Services Active Mums                     -($10,500.00)     -($10,500.00)    -($10,000.00)     -($20,500.00) Operating                                     Alison Hamblin        Council request for additional funding for
                                                                                                                                                                                                              Active Mums was successful.
                                                                                                                                                                                                              from Council's Grant funding reserve
      Cso05         Chief Executive      Chief Executive Office          $55,000.00        $10,000.00       -($5,000.00)      $50,000.00 Operating                                      Alison Hamblin        $10,000 state grant and additional $5,000
                    Office                                                                                                                                                                                    from Council's Grant funding reserve towards
                                                                                                                                                                                                              Active Mums Program
      CS006         Community Services Respite Centre                   $311,384.00       $267,390.00     -($25,575.52)      $285,808.48 Operating                                      Ash Saward            Salary increments added in BR2 without
                                                                                                                                                                                                              corresponding adjustment to contract
                                                                                                                                                                                                              services
      CSo06         Community Services Home Assist Secure               $64,832.00        $52,807.00        -($2,599.57)      $62,232.43 Operating                                      Ash Saward            Salary increments added in BR2 without
                                                                                                                                                                                                              corresponding adjustment to contract
                                                                                                                                                                                                              services
      CS007         Community Services Home Assist Secure             ($268,790.00)     -($285, 765.00)   -($16,975.00)    -($285,765.00) Operating                                     Ash Saward            Additional grant funds received offset by
                                                                                                                                                                                                              expenditure

      CS007         Community Services Home Assist Secure               $64,832.00        $52,807.00         $16,975.00       $81,807.00 Operating                                      Ash Saward            Additional grant funds received offset by
                                                                                                                                                                                                              expenditure
      CS008         Community Services Noosa Community Support           $21,345.00         $1,345.00     -($20,000.00)        $1,345.00 Operating                                      Ash Saward            Reallocate budget from materials & services
                                        Projects                                                                                                                                                              to employee benefits
                                        Projects                                                                                                                                                              to employee benefits
      cso0g         Community Services Noosa Aquatic Centre              $76,172.00       $24,600.00        -($5,520.87)      $70,651.13 Operating                                      Ash Saward            50% cost of Fridge and Freezer that was
                                                                                                                                                                                                              moved to Capital 500623 - funded from this
                                                                                                                                                                                                              account.
      Cs009         Community Services Noosa Aquatic Centre              $25,250.00        $14,221.00       -($5,520.87)      $19,729.13 Operating                                      Ash Saward            50% cost of Fridge and Freezer that was
                                                                                                                                                                                                              moved to Capital 500623 - funded from this
                                                                                                                                                                                                              account.

                                                                                                                                           Page 20 of 53

Section 21

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 21 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                                              16 MAY 2016

      Budget Review 4 - March Quarter Review 2015/16
      Summary   of Submissions Received                             $  6.498606.01   $  285512374      $     75,036.18  $   6573,642.19
      Pte (lesley    ele ads             Cost Centre / Project     2015/16 Current  2015/16 Actuals   Proposed          Proposed New     Capital / Operating     CAPEX PROGRAM            lore Te mec lad     ere     ed
                                        Description                Budget                             Budget            Budget
                                                                                                      PET
      Cso10         Community Services Noosa Aquatic Centre               $9,080.00       $21,229.00        $13,000.00        $22,080.00 Operating                                      Ash Saward            Contractor employed from Oct 15 to Mar 16
                                                                                                                                                                                                              for lifeguard services (but budgeted in casual
                                                                                                                                                                                                              salaries). Now converted to casual employee
                                                                                                                                                                                                              effective Apr 16.
      CS010         Community Services Noosa Aquatic Centre             $607,578.00      $468,028.00      -($26,000.00)      $581,578.00 Operating                                      Ash Saward            Contractor employed from Oct 15 to Mar 16
                                                                                                                                                                                                              for lifeguard services (but budgeted in casual
                                                                                                                                                                                                              salaries). Now converted to casual employee
                                                                                                                                                                                                              effective Apr 16. Contractor swim coaches
                                                                                                                                                                                                              employed in 2015/2016 but previously
                                                                                                                                                                                                              budgeted as casual employees.
      Cso10         Community Services Noosa Aquatic Centre              $11,200.00        $18,712.00        $13,000.00       $24,200.00 Operating                                      Ash Saward            Contractor swim coaches employed in
                                                                                                                                                                                                              2015/2016 but previously budgeted as casual
                                                                                                                                                                                                              employees.
      cso11         Community Services Library Programs and             $24,510.04             $0.00      -($24,510.04)            $0.00 Operating                                      Kerri Contini         Dollars Making Sense grant - transferring
                                         Services/Dollars Making                                                                                                                                              current unallocated budget to correct account
                                         Sense
      cso11         Community Services Library Programs and                  $0.00         $8,520.00        $24,510.04        $24,510.04 Operating                                      Kerri Contini         Dollars Making Sense grant - transferring
                                         Services/Dollars Making                                                                                                                                              current unallocated budget to correct account
                                         Sense
      Ex001          Executive Office    Customer Service                $15,000.00            $0.00      -($15,000.00)            $0.00 Operating                                            Debra lezzi     Budget transferred to Capital Job 500609to
                                                                                                                                                                                                              develop concept plans for a one stop
                                                                                                                                                                                                              Customer Services centre.
      Ex002          Executive Office    Human Resources                      $0.00            $0.00          $2,000.00        $2,000.00 Operating                                        Will Burgess-Dean   Service Recognition usually catered for in-
                                                                                                                                                                                                              house. This year will be catered for
                                                                                                                                                                                                              externally. Recognition of staff approach
                                                                                                                                                                                                              support by senior leadership team.

                                         Safe’
      Ex003          Executive Office    Human Resources                     $0.00       -($12,500.00)    -($12,500.00)     ($12,500.00) Operating                                      Marilla Murphy        Add Trainee Grant revenue along with
                                                                                                                                                                                                              2015/16 expenses (partially rate funded

                                                                                                                                                                                                              2015/16 expenses (partially rate funded

                                                                                                                                                                                                              2015/16 expenses (partially rate funded

                     Infrastructure                                                                                                                                                                           2015/16 expenses (partially rate funded
                     Infrastructure                                                                                                                                                                           2015/16 expenses (partially rate funded
      EXx003         Planning &          Plumbing Services                   $0.00       -($12,500.00)    -($12,500.00)     -($12,500.00) Operating                                     Marilla Murphy        Add Trainee Grant revenue along with
                     Infrastructure                                                                                                                                                                           2015/16 expenses (partially rate funded
                     Infrastructure                                                                                                                                                                           2015/16 expenses (partially rate funded
                     Infrastructure                                                                                                                                                                           2015/16 expenses (partially rate funded
      0so01         Corporate Services   North Shore Ferry            -($368,000.00)    -($310,990.00)    -($20,000.00)    -($388,000.00) Operating                                     Clint Irwin           Income increased due to excellent weather,
                                                                                                                                                                                                              favourable tourist numbers
      0s001         Corporate Services   Boreen Point Campground      -($377,000.00)    -($357 964.81)    -($18,000.00)    ($395,000.00) Operating                                      Clint Irwin           Income increased due to excellent weather,
                                                                                                                                                                                                              favourable tourist numbers
      0so01         Corporate Services   Boreen Point Campground         $19,250.00       $34,453.12         $15,203.12       $34,453.12 Operating                                      Clint Irwin           Manager's Commission calculated against
                                                                                                                                                                                                              earned revenue for the anniversary, based
                                                                                                                                                                                                              on the invoice for the period April 2015 till
                                                                                                                                                                                                              March 2016

                                                                                                                                            Page 21 of 53

Section 22

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 22 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                                              16 MAY 2016

      Budget Review 4 - March Quarter Review 2015/16
      Summary of Submissions Received                               $   649860601     $   2855,123.74   $     75,036.18   $  6573,642.19
     Reference       ere     ag           Cost Centre / Project     2015/16 Current   2015/16 Actuals  Proposed          Proposed New      Capital / Operating     CAPEX PROGRAM              Council Contact    er       ed
                                         Description                Budget                             Budget            Budget
                                                                                                       PPE
      0S001          Corporate Services   North Shore Beach            -($511,000.00)    -($478,628.00)     -($21,000.00)    -($532,000.00) Operating                                      Clint Irwin           Income increased due to excellent weather,
                                          Campground                                                                                                                                                             favourable tourist numbers
      0s002          Executive Office     Elected Members                      $0.00            $0.00        -($5,642.09)      -($5,642.09) Operating                                      Wayne Jensen          Correction to BR2 salary increments
      0S003          Corporate Services _ Fleet Plant and Workshop              $0.00        $7,983.00        $20,000.00        $20,000.00 Operating                                       Phill Parkman         An increase in budget for vehicle safety lights
                                        Operations                                                                                                                                                               is required due to fleet changeover.
      OS003          Corporate Services _ Fleet Plant and Workshop       $377,335.00       $313,051.00       $40,000.00        $417,335.00 Operating                                       Phill Parkman         Increase in fleet maintenance budget offset
                                          Operations                                                                                                                                                             by savings.
      OS003          Corporate Services _ Fleet Plant and Workshop        $12,000.00        $12,832.00        $16,476.00        $28,476.00 Operating                                       Phill Parkman         Increase in budget for the replacement of
                                        Operations                                                                                                                                                               small plant and equipment. Includes the
                                                                                                                                                                                                                 purchase of 6 Tait TM 8254 vhf mobile
                                                                                                                                                                                                                 radios offset by savings.
      0S003          Corporate Services _ Fleet Plant and Workshop       $112,800.00        $72,764.00      -($40,036.00)       $72,764.00 Operating                                       Phill Parkman         Council negotiated a reduction in insurance
                                         Operations                                                                                                                                                              expense for all fleets vehiclesresulting in
                                                                                                                                                                                                                 savings against the original budget.
      0S003          Corporate Services __ Fleet Plant and Workshop      $540,876.00       $282,684.00      -($36,440.00)      $504,436.00 Operating                                       Phill Parkman         A reduction in the number of leased fleet
                                          Operations                                                                                                                                                             vehicles has resulted in an operational
                                                                                                                                                                                                                 saving against the original budget.
      P1001          Planning &           Ringtail Quarry                 $49,800.00       $49,952.00        $55,000.00        $104,800.00 Operating                                             Allan Hull      To Provide quarry materials for future capital
                     Infrastructure                                                                                                                                                                              and maintenance projects, such as
                                                                                                                                                                                                                 Cootharabra Rd culvert upgrade, Black
                                                                                                                                                                                                                 Mountain Rd slip.
      P1001          Planning &           Gravel Roads                   $262,000.00         $1,921.00      -($55,000.00)      $207,000.00 Operating                                             Allan Hull      Due to good weather over the summer
                     Infrastructure                                                                                                                                                                              period, there has been a reduction in
                                                                                                                                                                                                                 maintenance requirements on gravel roads.
      Pl002          Planning &          Asset Management and            $142,500.00        $13,790.00       $30,000.00        $172,500.00 Operating                                         Nicholas Wellwood   Consultancy services to assist with service
                     Infrastructure       Service Programming                                                                                                                                                    modelling to determine reseal priorities for
                                                                                                                                                                                                                 capital program.

      PI003          Planning &          Asset Management and            $172,500.00        $13,790.00       $42,000.00        $214,500.00 Operating                                         Nicholas Wellwood   Development of detailed asset management
                     Infrastructure       Service Programming                                                                                                                                                    plans initially focusing on Hastings Street and
                                                                                                                                                                                                                 Sand Pumping systems.

      P1003          Planning &          Asset Management and                  $0.00      -($76,723.00)     -($79,766.00)     -($79,766.00) Operating                                        Nicholas Wellwood   Wages allocated to capital projects not
                     Infrastructure       Service Programming                                                                                                                                                    originally budgeted.
      P1004          Planning &          Asset Management and                $500.00           $766.00         $7,766.00         $8,266.00 Operating                                         Nicholas Wellwood   Initial issue of PPE & uniforms to staff
                     Infrastructure       Service Programming                                                                                                                                                    members that meet the criteria for outdoor
                                                                                                                                                                                                                 work.
      P1005          Planning &           Environmental Services         $68,339.00        $33,084.07        $33,095.00        $101,434.00 Operating                                            Peter Milne      Development of Flying Fox Management
                     Infrastructure                                                                                                                                                                              Plan, Roost Management Permit, and
                                                                                                                                                                                                                 installation of Sprinkler systems at Wallace
                                                                                                                                                                                                                 Park

                                                                                                                                            Page 22 of 53

Section 23

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                                   Attachment 4




                                   Page 23 of 53

GENERAL COMMITTEE MEETING AGENDA                 16 MAY 2016

                                                                          Attachment 4

          Ne                           ee

          ef] NOOSA COUNCIL FF Sg
                                               eae

                           FINANCIAL STATEMENTS
                                   2015/2016
                     BUDGET REVIEW 4 - MARCH QUARTER

                                                 Page 23 of 53

Section 24

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 24 of 53

Noosa Shire Council
2015/16 Budget Statements
For the period ending 30 June
Annual Result - Total Council                  | original | Bri | pre | prs | pre forecast
                                                   2016        2016       2016       2016       2016       2017        2018       2019       2020       2021       yA)         AE)        2024       2025
                               :                   $,000     cmt)         $,000      $,000      $,000      Pmt)       $,000       $,000      $,000      Pmt)       $,000       $,000      CMH)       $,000
Statement of Comprehensive Income
Income
Revenue
  Recurrent revenue
  Net rates, levies and charges                     60,463      60,463     60,463     60,463     60,463      62,348     63,970     65,963     67,676      69,780     71,589     73,811     75,721     78,043
  Fees and charges                                    4,805      4,805      4,856      5,180      5,180       5,310      5,442      5,578      5,718      5,861       6,007      6,157      6,311      6,469
  Rental income                                       1,174      1,174      1,174      1,174                  1,203      1,233      1,264       1,296      1,328      1,361      1,395      1,430       1,466
  Interest received                                   4,568      4,568      4,568      4,568      4,568       4,277      4,504      4,750      4,869       5,213      5,400      5,611      5,820      6,013
  Sales revenue                                       7,290      7,290      7,290      7,299                  7,481      7,668      7,859      8,055       8,256      8,463      8,674      8,890      9,112
  Other income                                        3,613      3,613      3,663      3,675                  3,767      3,861      3,957      4,056       4,158      4,262      4,368      4,477     45,889
  Grants, subsidies, contributions and donations      5,393      5,393      5,483      5,592                  5,605      5,673      5,741      5,810       5,879      5,948      6,018      6,088      6,158
  Total recurrent revenue                           87,307      87,308     87,497     87,952                 89,990     92,352     95,113     97,480    100,474     103,029    106,035    108,738    111,850
  Capital revenue                                                                           p
  Grants, subsidies, contributions and donations      3,678      4,647      6,066      7,317                  3,130      4,580      4,035      6,500       6,500      6,500      6,500      6,500      6,500
                                                                                             pd
  Total revenue                                     90,985      91,955     93,564     95,269                 93,120     96,932     99,148    103,980    106,974     109,529    112,535    115,238    118,350
  Capital income
  Total capital income                                   -           -          -          -                      -          -          -          -          -           -          -          -          -
Total income                                        90,985      91,955     93,564     95,269                 93,120     96,932     99,148    103,980    106,974     109,529    112,535    115,238    118,350

  Recurrent expenses                                                                        p
  Employee benefits                                 27,656      27,664     27,650     27,661                 27,817     28,512     29,442     30,178      31,161     31,940     32,978     33,802     34,899
  Materials and services                            39,083      39,340     39,559     40,215                 39,705     40,698     41,715     42,758     44,758      45,877     47,024     48,200     49,405
  Finance costs                                       2,458      2,458      2,458      2,458      2,458       2,335      2,157      1,968       1,770      1,552      1,324      1,082        826        550
  Depreciation and amortisation                      16,630     16,630     16,630     16,630      16,630     16,786     17,200     17,646     17,930      18,650     19,296     20,276     20,932     21,552
  Other expenses                                       122         122        106        106        106         109        111        114       1,117       120         123        126        129        132
  Total recurrent expenses                          85,949      86,214     86,404     87,070     87,182      86,752     88,679     90,886     92,754      96,241     98,560    101,486    103,889    106,538
  Capital expenses
  Total capital expenses                                 -           -        195        195        195        200         205        210        215        221         226        232        238        243
  Total expenses                                    85,949      86,214     86,598     87,265                 86,952     88,883     91,096     92,969      96,462     98,786    101,718    104,126    106,781
                                                                                             pd
Net result                                            5,036      5,741      6,966      7,053                  6,168      8,049      8,052     11,011      10,512     10,743     10,817     11,112     11,569
Operating result                                                                             P|
                                                                                             a
Recurrent revenue                                   87,307      87,308     87,497     87,952                 89,990     92,352     95,113     97,480    100,474     103,029    106,035    108,738    111,850
Recurrent expenses                                  85,949      86,214     86,404     87,070                 86,752     88,679     90,886     92,754      96,241     98,560    101,486    103,889    106,538
Operating result                               |     1,358]      1,094] 1,093] 882                           3,238      3,673      4,227      4,726       4,233      4,469      4,549       4,849       5,312

                                                                                                                               Page 24 of 53

Section 25

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 25 of 53

Noosa Shire Council
2015/16 Budget Statements
For the period ending 30 June
Annual Result                                 [original | pri | opr2 | oprs | BRA Precast
                                                   PAT)        PAK)         PAT)         PAT)         2016         vA  A        2018         2019         2020         2021         2022        2023         2024         2025
Statement of Financial Position                    $,000       $,000        $,000        $,000        $,000        $,000        $,000        $,000        $,000       $,000        $,000        $,000        $,000        PMOL)
Assets
  Current assets                                                                                  fF
  Cash and cash equivalents                          34,278      36,420       36,759       33,701                    33,484       33,623       34,051       37,338       39,762      42,682       45,613       47,790       49,944
  Trade and other receivables                         8,059        8,060        8,073       8,097                     8,351        8,559        8,809        9,003        9,291        9,522       9,800       10,016       10,333
  Inventories                                           103          104         104          104          104          104          104          104          104          104         104          104          104          104
  Other current assets                                 433          657          657          657          657          668          679          690          701         713          725          737          749          761
  Total current assets                               42,874      45,240       45,593       42,559                    42,607       42,965       43,654       47,146      49,870       53,033       56,254       58,659       61,142
  Non-current assets
  Investments                                       111,234      114,027     114,027      114,027      114,027      114,027      114,027      114,027      114,027      114,027     114,027      114,027      114,027      114,027
  Property, plant & equipment                      931,673      923,900      924 ,908     927,979                   954,198      982,965    1,012,223    1,041,977    1,071,808    1,102,040    1,132,621    1,164,521   1,197,076
  Other non-current assets                            3,480        2,798        2,873       2,978        2,978       3,393        3,281         2,718        2,139        2,194        1,886        1,581        1,379       1,286
  Total non-current assets                        1,046,387}   1,040,726]   1,041,808}   1,044,984                1,071,618    1,100,273    1,128,968    1,158,143    1,188,029    1,217,953    1,248,229    1,279,927   1,312,389
                                                                                                  ee |
  Total assets                                    1,089,261    1,085,966    1,087,401    1,087,543                1,114,225    1,143,238    1,172,622    1,205,289    1,237,899    1,270,986    1,304,483    1,338,586   1,373,531

  Current liabilities                                                                             |
  Trade and other payables                            4,280        4,301       4,317        4,371                     4,347        4,455        4,575        4,676        4,891       5,013        5,147        5,261        5,417
  Borrowings                                          2,855        2,855        2,855       2,855        2,855       3,033        3,222         3,420        3,638        3,866        4,108       4,364        4,640        4,034
 Provisions                                           4,535        5,013        5,013       5,013        5,013        5,139        5,267        5,399        5,534        5,672        5,814       5,959        6,108        6,261
  Other current liabilities                            801          380          380          380          380          390          400          410         420          430          441          452          464          475
  Total current liabilities                          12,470       12,549       12,565      12,619                    12,908       13,345       13,803       14,268       14,859       15,376      15,923       16,473       16,187
  Non-current liabilities
  Borrowings                                         35,247      35,247       35,247       35,247       35,247       32,215       28,893       25,573       21,935       18,070       13,961       9,597        4,957          924
 Provisions                                           8,284        8,211        8,211       8,211        8,211        8,415        8,624        8,838        9,058        9,283        9,514       9,750        9,993       10,242
  Total non-current liabilities                      43,531      43,458       43,458       43,458       43,458       40,630       37,616       34,411       30,993      27,353       23,475       19,348       14,950       11,165
  Total liabilities                                  56,001      56,007       56,023       56,078                    53,538       50,961       48,214       45,261      42,212       38,852       35,271       31,423       27,352
                                                {ET
Net community assets                              1,033,260    1,029,959    1,031,378    1,031,465                1,060,687    1,092,277    1,124,408    1,160,028    1,195,687    1,232,134    1,269,212    1,307,163   1,346,179

  Asset revaluation surplus                          44,367      36,520       36,520       36,520       36,520       59,572       83,115      107,193      131,802      156,949     182,652      208,914      235,752      263,200
  Retained surplus                                 988,893      993,439      994,858      994,946                 1,001,114    1,009,162    1,017,215    1,028,227    1,038,739    1,049,482    1,060,299    1,071,410   1,082,979
                                                                                                  ee |
  Total community equity                          1,033,260}   1,029,959]   1,031,378}   1,031,465                1,060,686    1,092,276    1,124,409    1,160,028    1,195,688    1,232,134    1,269,213    1,307,162   1,346,179

                                                                                                                               Page 25 of 53

Section 26

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 26 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                           16 MAY 2016

         Noosa Shire Council
         2015/16 Budget Statements
         For the period ending 30 June
        Annual Result                                   | Original | BR1_ | opR2 | prs | pre forecast,
                                                             2016       2016        2016       2016        yh T:)     rv         PATS)       2019        2020       2021        2022       yy}         yy         2025
         Statement of Cash Flows                             $,000      $,000       $,000      CMY         $,000      $,000      $,000       $,000      $,000       $,000      CMY         $,000      $,000       $,000
         Cash flows from operating activities
                                                                                                       Po
           Receipts from customers                            72,826     72,991      73,079     73,402                 75,567      77,575     79,871      81,991     84,367      86,602     89,158      91,518     94,142
           Payments to suppliers and employees               (66,913)}  (70,591)}   (70,764)}  (71,376)               (67,680)   (69,236)    (71,171)   (72,968)    (75,836)   (77,827)    (79,999)   (82,019)    (84,278)
           Dividend received                                   3,014       3,014      3,014       3,014      3,014       3,089      3,167      3,246       3,327      3,410       3,495      3,583       3,672      3,764
           Interest received                                   4,568       4,568      4,568      4,568       4,568      4,277       4,504      4,750       4,869      5,213       5,400      5,611       5,820      6,013
           Rental income                                       1,170       1,172      1,172       1,171                  1,201      1,231       1,262      1,294       1,325      1,359      1,393       1,428      1,463
           Non-capital grants and contributions                5,374       5,385      5,473       5,580                  5,603      5,667      5,735       5,805      5,872       5,942      6,012       6,083      6,151
           Borrowing costs                                    (2,303)    (2,303)     (2,303)    (2,303)     (2,303)    (2,180)     (2,002)    (1,812)     (1,615)    (1,397)     (1,169)      (926)      (670)       (395)
           Other cash flows from operating activities            (11)       (11)        (11)       (11)        (11)       (11)        (11)       (11)       (11)        (12)       (12)        (12)       (12)        (12)
           Net cash inflow from operating activities          17,725      14,225     14,228      14,046                19,864      20,895     21,869      22,691     22,942      23,791     24,820      25,821     26,848
         Cash flows from investing activities
                                                                                                       Po
           Payments for property, plant and equipment        (22,709)}  (30,663)}   (31,670)}  (34,741)               (19,573)   (21,939)    (22,264)      2249- = (22,741)    (23,166)    (23,941)   (25,491)    (26,216)
           Payments for intangible assets                      (595)       (701)      (776)       (881)                  (794)      (374)          -           -       (650)      (350)       (350)      (300)       (350)
           Proceeds from sale of property, plant and equipmd       -           -          -           - a                   -           -          -           -          -           -          -           -          -
           Grants, subsidies, contributions and donations      3,678       4,647      6,066       6,366                  3,130      4,580      4,035       6,500      6,500       6,500      6,500       6,500      6,500
           Other cash flows from investing activities          (702)       (702)      (702)       (702)      (702)          10         10         10          10         10          11         11          11         12
           Net cash inflow from investing activities         (20,328)}  (27,418)]   (27,082)}  (29,957)               (17,227)   (17,723)    (18,219)   (15,984)    (16,881)   (17,005)    (17,780)   (19,280)    (20,054)
         Cash flows from financing activities
           Proceeds from borrowings                            1,360       1,360      1,360       1,360      1,360          -           -          -           -          -           -          -           -          -
           Repayment of borrowings                            (2,638)    (2,638)     (2,638)    (2,638)     (2,638)    (2,855)     (3,033)    (3,222)     (3,420)    (3,638)     (3,866)    (4,108)    (4,364)     (4,640)
           Net cash inflow from financing activities          (1,278)    (1,278)     (1,278)    (1,278)     (1,278)    (2,855)     (3,033)    (3,222)     (3,420)    (3,638)     (3,866)    (4,108)    (4,364)     (4,640)
         Total cash flows
                                                         Ed
         Net increase in cash and cash equivalent held        (3,882)}  (14,472)}   (14,132)}  (17,190)                  (218)        140        428       3,287      2,423       2,920      2,932       2,177      2,154
         Opening cash and cash equivalents                    38,160     50,891      50,891     50,891      50,891     34,793      34,575     34,715      35,143     38,430      40,853     43,773     46,705      48,882
         Closing cash and cash equivalents                    34,278     36,420      36,759     33,701                 34,575      34,715     35,143      38,430     40,853      43,773     46,705     48,882      51,036

                                                                                                                          Page 26 of 53

Section 27

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 27 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                         16 MAY 2016

        Noosa Shire Council
        2015/16 Budget Statements
        For the period ending 30 June
        Annual Result                                 | original | BRI | BR2 | BR3 | BRA |                                                                    orecast,
                                                           2016       2016       2016       2016       2016       A         yA Ts}      2019        2020       2021      YAH        YAK)       yAyz        2025
        Statement of Changes in Equity                    px         $,000      $,000       $,000      $,000      $,000      $,000      ext        $,000     $,000       $,000       $,000      $,000      $,000
        Asset revaluation reserve
          Opening balance                                   21,798     14,334     14,334     14,334     14,334     36,520     59,572     83,115     107,193    131,802    156,949    182,652    208,914    235,752
          Increase in asset revaluation surplus             22,569     22,186     22,186     22,186     22,186     23,052     23,543     24,077     24,609      25,147     25,703     26,262     26,838     27,448
          Closing balance                                   44,367     36,520     36,520     36,520     36,520     59,572     83,115    107,192     131,802    156,949    182,652    208,914    235,752    263,200
        Retained surplus
          Opening balance                                 984,049     987,893    987,893    987,893    987,893    996,040   1,002,208  1,010,257  1,018,310  1,029,321  1,039,834  1,050,577  1,061,394   1,072,505
          Net result                                         4,843      5,546      6,965     7,053                  6,168      8,049      8,053      11,011     10,513     10,743     10,817     11,111     11,569
          Closing balance                                 988,893     993,439    994,858    994,946             1,002,208   1,010,257  1,018,310  1,029,321  1,039,834  1,050,577  1,061,394  1,072,505   1,084,074
        Total
          Opening balance                                1,005,848] 1,002,227) 1,002,227} 1,002,227] 1,002,227) 1,032,560   1,061,780  1,093,372  1,125,502  1,161,122  1,196,782  1,233,228  1,270,307   1,308,256
          Net result                                         4,843      5,546      6,965     7,053                  6,168      8,049      8,053      11,011     10,513     10,743     10,817     11,111     11,569
          Increase in asset revaluation surplus             22,569     22,186     22,186     22,186     22,186     23,052     23,543     24,077     24,609      25,147     25,703     26,262     26,838     27,448
          Closing balance                                1,033,260] 1,029,959] 1,031,378] 1,031,465             1,061,780   1,093,372  1,125,502  1,161,122  1,196,782  1,233,228  1,270,307  1,308,256   1,347,273

                                                                                                                        Page 27 of 53

Section 28

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 28 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                           16 MAY 2016

       Noosa Shire Council
       2015/16 Budget Statements
       For the period ending 30 June
    | AnnualResuit                                   Tt riginal | Bri | opr2 | opera | pra |                                                                   recast
                                                          PAT)       2016        2016       2016       2016       yA         2018        2019       2020       2021      yA          yi)         yy!        2025
       a larcLedtl MSOC Earley Nate te)                   $,000      $,000      $,000      $,000       $,000      $,000      $,000      $,000      $,000       $,000      $,000      $,000      $,000       $,000
       Operating Surplus Ratio                               1.6%       1.3%       1.3%        1.0%                  3.6%       4.0%       44%        4.8%        4.2%       4.3%       4.3%       4.5%        47%
       Net Financial Liabilities Ratio                      15.0%      12.3%      11.9%      15.4%                  12.1%       8.7%       4.8%       -1.9%      -7.6%     -13.8%     -19.8%      -25.0%     -30.2%
       Asset Sustainability Ratio                           99.9%     129.5%     132.8%     131.9%                  98.4%      99.5%      99.9%      99.5%       97.2%      96.5%      95.6%      99.4%      99.6%

       Operating Surplus Ratio
       Measures the extent to which revenues raised cover operational expenses
       only or are available for capital funding purposes or other purposes.
       Calculation: Net operating result divided by total operating revenue, expressed as a % (excluding capital revenue or expenses).
       Target: between 0% and 10%

       Net Financial Liabilities Ratio
       Measures the extent to which the net financial liabilities of Council can
       be repaid from operating revenues.
       Calculation: (total liabilities less current assets) divided by
       total operating revenue, expressed as a %.
       Target: not greater than 60%.

       Asset Sustainability Ratio
       This ratio reflects the extent to which the infrastructure assets managed by Council
       are being replaced as they reach the end of their useful lives.
       Calculation: capital expenditure on the replacement of infrastructure assets
       (renewals) divided by depreciation expense, expressed as a %.
       Target: greater than 90%.

                                                                                                                         Page 28 of 53

Section 29

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 29 of 53

GENERAL COMMITTEE MEETING AGENDA                                                       16 MAY 2016

             Noosa Shire Council
             2015/16 Budget Statements
             For the period ending 30 June                                 | Original | BR1_ | BR2_ | BR3_ | BR4_
                                                                                 2016       2016       2016      2016       2016
             Capital Works Program                                               $,000     $,000      emt)       $,000     $,000
             Bridges                                                              290      1,800     1,800      1,922
             Cemeteries                                                           -          -         -          -          -
             Coastal, Canals and Waterways                                        291       700        969        975
             Commercial Land & Properties                                        360        360       360         360
             Community Facilities                                                 258       780        877        902
             Corporate buildings                                                   17        47         47         65
             Environmental Assets, bushland tracks & Trails                       100       109        109      2,960
             Fleet & Plant Replacement                                          1,854      2,308     2,308      2,308
             Gravel Road Network                                                  350       350       350         350
             Holiday Parks                                                        -          46         46         96
             Information Technology                                               195       301        301        301
             Parks & Playgrounds                                                  361       519        723        813
             Pathways & Enabling Facilities                                       263       481       541       1,141
             Planning Scheme                                                      400       400        475        580} 580 |
             Public Transport Infrastructure                                    1,500      1,633     1,660      1,753
             Sealed Road Network                                               15,071     16,704    16,555     15,498
             Sports Grounds & Facilities                                           30        40         40         40
             Stormwater Drainage                                                  550      2,900     3,280      3,280
             Streetscapes and Road Corridor                                       -          131       131        131       131
             Transport and Infrastructure Management                            1.105      15323     1,443      1,701
             Waste Management                                                     310       430        430        444       444
             Total Capital works Program                                 | 23,304]       31,363]    32.446]   35,621] 36,765

                                                                                      Page 29 of 53

Section 30

GENERAL COMMITTEE MEETING AGENDA                                                               16 MAY 2016



4                     FINANCIAL PERFORMANCE REPORT - APRIL 2016
UMENT INF ORM ATION




Author                        Manager Financial Services, Wayne Jensen
                              Corporate Services Department

Index                         ECM / Subject / 22.09 – Monthly Financial Performance Report

Attachments                   1.    Statement of Comprehensive Income
                              2.    Statement of Financial Position


EXECUTIVE SUMMARY
Year to date financial performance to 30 April 2016 is generally in accordance with budget
forecasts. A review of year to date operating performance against budget to 31 March 2016 has
formed the basis for revision of the forecast position to 30 June 2016, and will form the base for
financial model projections. Proposed budget adjustments arising from this review are the subject
of a separate report to this meeting.

         Financial Performance Summary to 30 April 2016
                                 Current YTD Actual               Variance      Variance    Status
                                    YTD            $m                  $m           YTD
                                 Budget                                               %
                                     $m
         Recurrent Revenue         $83.3        $85.0                 $1.7         2.1%    On track
         Recurrent Expense         $69.5        $67.2                 $2.3         3.3%    On track

         Net Capital Revenue               $5.0        $5.0             $0         0.6%    On track
         Capital Expenditure              $28.5       $22.2           $6.4          22%     Watch

Financial statements including Statement of Comprehensive Income and Statement of Financial
Position are included as attachments for information of Council.

Figure 1: Actual Performance Compared to YTD Budget

                $90
                $80
                $70
                $60
                $50
                $40
                $30
                $20
                $10
                 $-
                             YTD Budget ($m)                  YTD Actual ($m)

                               Operating Revenue   Operating Expenditure




                                                                                              Page 30 of 53

Section 31

GENERAL COMMITTEE MEETING AGENDA                                                           16 MAY 2016


RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 16 May 2016 providing the April YTD monthly financial performance report for the
2015/16 financial year.


REPORT
Recurrent Revenue (YTD Benchmark 83%)

Council has received 97% ($85 million) of its recurrent revenue budget of $88 million as at the
end of April 2016. Commentary on each recurrent revenue type is provided below:

      Rates and Levies – $60.6m (100%) of the annual budget of $60.5m has been recorded.
        General rates are marginally below forecast levels although waste collection charges
        exceed budget.
      Fees and Charges – Fees and charges earned ($5.0m) totals 99% of the revised full year
        forecast. Planning, development, parking fees, land use permits, and property searches
        fees continue to exceed current YTD estimates. Variances were reviewed to determine the
        need for possible changes to the year-end forecast, though no adjustments have been
        recommended.
      Interest Received – Currently 7.6% above YTD forecast levels due to cash flow timing
        issues. No adjustments to the year-end forecast have been proposed at this stage with the
        recent reduction in the official cash rate likely to result in lower returns through until the end
        of June.
      Dividend and Tax – Dividends and the payment of tax equivalent from Unitywater are in
        line with budget forecasts.
      Other Revenue – holiday parks, rental income, and waste fees continue to be above
        budget forecasts, with sale of recyclable materials (concrete and scrap metal) below
        forecasts. Sale of quarry products for material used in the construction of Dr Pages Road
        has contributed to the overall variance ($284k), offset by an increase in operational costs
        (cost of product sales).
      Grants and Subsidies – Receipts for operational grants are generally tracking in
        accordance with adjustments to the revised budget forecast.

Figure 2: Recurrent Revenue Position by Type (Excluding Rates)

 $10.0
     $9.0
                                     YTD Budget ($m)
     $8.0
     $7.0                            YTD Actual ($m)

     $6.0
     $5.0
     $4.0
     $3.0
     $2.0
     $1.0
     $0.0
                                                            Other




                                                                        Grants
               Fees




                          Dividend




                                                   Tax
                                        Interest




                                                                                          Page 31 of 53

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                             16 MAY 2016


Recurrent Expenditure (YTD Benchmark 83%)

Operating expenditure is currently 77% of the full year budget forecast. Detailed commentary for
significant items appears below.

        Employee Costs – Actuals of $22.2m against the YTD budget of $22.4m and equates to
          80% of the full year budget. Whilst the total is within the budget, this is actually represented
          by a range of minor variances across operational areas, including allocation of wages to
          capital projects and staff training, which will continue to be monitored.
        Materials and Services – $28.8m (72%) of the full year budget has been expended
          compared to the YTD budget of $30.9m. Variances relate to under-expenditure against
          contract services, maintenance, and special levies ($451k). Specifically, there is under-
          expenditure against buildings and facilities maintenance ($149k), savings against fleet
          operations associated with lower fuel prices and savings to lease and insurance costs
          ($329k); Waste operations are currently running under original forecasts ($503k); and Civil
          Operations is currently running approximately $98k behind forecast levels (including the
          impact of quarry materials sales). Adjustments have been proposed as part of the March
          quarter budget review.
        Finance Costs – generally in accordance with budget. It is noted that QTC undertake an
          annual review of interest rates against the current market, and have restructured all loans
          effective from 1 April 2016. The outcome has been the conversion of loans from variable
          interest rates to fixed-rate/fixed-term loans with no impact on budget forecasts for the
          current year.
        Depreciation expenses are currently running in accordance with budget forecasts, with
          minor adjustments for assets sold through the year.
        Other Expenses – generally in accordance with budget.

Figure 3: Recurrent Expenditure Position by Type

 $35

 $30
                                                            YTD Budget ($m)
 $25
                                                            YTD Actual ($m)
 $20

 $15

 $10

     $5

     $0
                                            Finance Costs
                              Materials




                                                                      Depreciation
                Employees




                                                                                     Other




Capital Revenue

YTD capital revenue of $5.0 million received includes $2.4 million cash contributions from
developers, together with $2.6 million received as grant funding towards capital projects.




                                                                                             Page 32 of 53

Section 33

GENERAL COMMITTEE MEETING AGENDA                                                    16 MAY 2016


Capital Works Program

Actual capital expenditure (excluding commitments) is $22.2 million against the current full-year
budget of $35.4 million. Committed expenditure totals a further $6.1 million bringing the total of
actual and committed funds to $28.3 million (80% of the total program). Detailed discussion of
progress in the delivery of the capital works program is provided through a separate report by the
Infrastructure Planning & Design Manager.

Cash Management and Investment Performance

Council funds are invested in accordance with the adopted Investment Policy. Total cash on
hand at the end of April was $65.3 million following significant payments to contractors for
delivery of major projects through the month of April.

Council’s investment portfolio is balanced across a number of agencies, as shown in the graph
on the left. The graph on the right shows the current risk profile using industry credit ratings.

              Bendigo
                6%
       Suncorp
                                                                     A2
         9%                                                       A1 6%
                                                                  9%
                                                                                   A1+
                                   QTC
             Westpac                                                              (QTC)
                                   47%
              12%                                                                  47%
                                                                A1+
                                                               (Other)
                 NAB                                            38%
                 22%
                                       CBA
                                       4%

The actual interest revenue for the month was $167,438 with a weighted average yield of 3.06%
against the industry benchmark (Bloomberg AusBond Bank Bill Index) of 2.47%.

Previous Council Consideration

Nil

Finance & Risk

Monthly financial performance is monitored across all operational areas to ensure Council’s
forecast operating result is achieved and that forecast sustainability ratios are met.

Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

All areas of Council are consulted as part of the regular monitoring of budget performance.




                                                                                   Page 33 of 53

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                                   16 MAY 2016


Departments/Sections Consulted:

x   Chief Executive Officer                x   Community Services                 x   Corporate Services
    Executive Officer to the Mayor & CEO       Community Facilities                   Financial Services
    Executive Support                          Community Development                  ICT
                                               Libraries & Galleries                  Procurement & Fleet
                                               Local Laws                             Property & Facilities
                                               Waste & Environmental Health           Revenue Services

x   Executive Office                       x   Planning & Infrastructure
    Community Engagement                       Building & Plumbing Services
    Customer Service                           Civil Operations
    Economic Development                       Infrastructure Planning & Design
    Governance                                 Planning & Environment
    Human Resources                            Strategic Land Use Planning
    Sustainability




                                                                                                  Page 34 of 53

Section 35

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016


                                   Attachment 1




                                   Page 35 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                               16 MAY 2016

                                                                                                              Attachment 1
    Noosa Council
    Statement of Comprehensive Income
    For the Year Ended 30 June 2016
    As at 05-May-2016
                                                            Current             Current
                                                            Budget               Budget             Actual             Percentage
                                                              2016               YTD                  YTD             Annual Budget
                                                               $                    $                   $                   %

    Revenue
          Recurrent Revenue
         Rates, levies and charges                             60,463,174          60,463,174          60,587,211               100%
         Fees and charges                                       5,062,480           4,612,254           5,006,908                99%
         Dividend income                                        1,925,140             847,366             847,366                44%
          Interest received                                     4,568,059           3,616,555           3,892,928                85%
         Tax equivalents                                        1,088,812             895,203             895,203                82%
         Sale of Goods and Major Services                       7,418,019           6,457,170           6,780,672                91%
         Sale of Contract & Recoverable Works                      15,364              12,803              (8,148)               -53%
         Rental & Lease Income                                  1,173,953           1,001,971           1,046,630                89%
         Other income                                            721,908              598,494           1,110,308               154%
         Grants, subsidies, contributions and donations         5,592,339           4,787,438           4,842,671                87%
                                                               88,029,249          83,292,428          85,001,749                97%
    Expenses
          Recurrent Expenses
         Employee benefits                                     27,657 354          22,445,743          22,175,130                80%
         Materials and services                               40,057,058           30,893,083          28,832,316                72%
         Finance costs                                          2,686,315           2,217,762           2,220,310                83%
         Depreciation and amortisation                         16,630,163          13,858,469          13,903,849                84%
         Other expenses                                          105,993               92,676              91,243                86%
                                                               87,136,882          69,507,734          67,222,847                77%

    Operating Result                                             892,367           13,784,695          17,778,902

    Capital Revenue
         Capital contributions and donations                    2,556,631           2,429,036           2,404,900                94%
         Grants, subsidies, contributions and donations         4,760,113           2,554,506           2,607,276                55%
         Other capital revenue                                          -                   -                   -

    Total Capital Revenue                                       7,316,744           4,983,542           5,012,176

                                                                                                              Page 35 of 53

Section 36

GENERAL COMMITTEE MEETING AGENDA    16 MAY 2016


                                   Attachment 2




                                   Page 36 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                               16 MAY 2016

                                                                                                            Attachment 2
   Noosa Council
   Statement of Financial Position
   For the Year Ended 30 June 2016
   As at 05-May-2016
                                                                                        Consolidated
                                                               2016 Year End
                                                                  Forecast                2016 YTD                   2015
                                                    Note             $                        $                       $
   Current Assets
        Cash and cash equivalents                                     34,883,636               62,726,563              50,891,174
        Trade and other receivables                                    8,096,896                6,634,361               5,794,388
        Inventories                                                      104,038                  116,464                 104,038
        Other current assets                                             657,006                  636,706               3,097,262
                                                                      43,741,576               70,114,094              59,886,862
        Non Current Assets held for sale                                        -                       -                        -
   Total Current Assets                                               43,741,576               70,114,094              59,886,862

   Non Current Assets
        Trade and other receivables                                   49,217,517               49,217,517              49,217,517
        Other non current Assets                                                -                       -                        -
        Investments                                                   60,978,225               60,978,425              60,978,225
        Investment property                                            3,831,234                3,831,234               3,831,234
        Property, plant and equipment                                927,758,635             894,679,131              887,078,579
        Intangible assets                                              2,978,146                2,595,560               2,701,457
   Total Non Current Assets                                        1,044,763,757            1,011,301,867           1,003,807,012
   Total Assets                                                    1,088,505,333            1,081,415,961           1,063,693,873

   Current Liabilities
        Trade and other payables                                       4,370,989                8,336,042               8,100,894
        Borrowings                                                     2,854,619                2,563,185               2,633,065
        Provisions                                                     5,013,310                  845,016               4,114,390
        Other                                                            380,497                2,359,857               1,082,497
   Total Current Liabilities                                          12,619,415               14,104,100              15,930,845

   Non Current Liabilities
        Trade and other payables                                                -                       -                        -
        Borrowings                                                    35,247,498               33,814,864              36,747,480
        Provisions                                                     8,210,644                8,239,918               8,194,924
   Total Non Current Liabilities                                      43,458,142               42,054,782              44,942,404
   Total Liabilities                                                  56,077,557               56,158,882              60,873,249
   Net Community Assets                                            1,032,427,776            1,025,257,079           1,002,820,624

   Community Equity
        Asset Revaluation Surplus                                     36,519,656               14,334,106              14,334,106
        Retained Surplus / (Defeciency)                                         -                       -                        -
        Shire Capital                                                995,908,120             988,486,518              973,851,849
        Current Year Net Earnings                                               -              22,436,454              14,634,670
   Total Community Equity                                          1,032,427,776            1,025,257,079           1,002,820,625

                                                                                                              Page 36 of 53

Section 37

GENERAL COMMITTEE MEETING AGENDA                                                                  16 MAY 2016


5                       SUNSHINE COAST INSTITUTE OF TAFE (NOOSA) -TEWANTIN CAMPUS
OCUMENT INFORM AT ION




Author                          Chief Executive Officer, Brett de Chastel
                                CEO’s Office

Index                           ECM/ Properties I.D.148238 (24 Cooroy Noosa Road, Tewantin)
                                ECM/ Subject/ Governance & Administration (Education)

Attachments                     1.   Consultation Paper – ‘Developing a Ten Year Strategic Training
                                     Asset Management Plan’


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Chief Executive Officer to the General Committee Meeting
dated 16 May 2016 in respect to the Tewantin Campus of the Sunshine Coast Institute of TAFE
(Noosa) located at 24 Cooroy Noosa Road, Tewantin and in response to the State Government’s
consultation process on Developing a Ten Year Strategic Training Asset Management Plan,
Council resolves that:
1.   Council’s Economic Implementation Plan supports retention of the site for the purposes of
     training and education and this continues to be Council’s preferred option as the best
     solution for the Noosa community;
2.   Council considers that short term solutions may be worthy of consideration to limit further
     deterioration of the site assets, subject to any town planning requirements;
3.   The State should resolve the long term position at the earliest possible time and in the
     event that the TAFE assessment indicates no match with any training and education
     demand, that Expressions of Interest should be formally advertised inviting offers from
     interested parties for use of the site based on the high level principles set out in the
     consultation document; and
4.   The Chief Executive Officer provide a submission to the State Government in accordance
     with the details set out in the report.



REPORT
The purpose of this report is to determine Council’s position for the future of the Sunshine Coast
Institute of TAFE (Noosa) – Tewantin Campus in order to inform the State Government’s
consultation process on Developing a Ten Year Strategic Training Asset Management Plan for
Queensland. The consultation period closes on 27 May 2016.

BACKGROUND
The property details are as follows:

         Owner                           Queensland State Government represented by the Department of Education
                                         & Training
         Property description            Lot 375 SP151415
         Address                         24 Noosa Cooroy Road, Tewantin
         Land area                       11.05 ha
         Zoning                          Community Services


                                                                                                 Page 37 of 53

Section 38

GENERAL COMMITTEE MEETING AGENDA                                                           16 MAY 2016


 Overlays                  The site is classified 100% as “environmental protection” under the
                           Biodiversity overlay of the Noosa Plan. The vegetation is also “regulated
                           vegetation” under the Vegetation Management Act with 60% classified as
                           endangered and the balance adjacent to the cemetery classified as “not of
                           concern”.

                           Any proposed operational works would require referral to the State for the
                           “endangered” vegetation. There is development potential in the “not of
                           concern” area which is able to be managed by Council.
 Improvements              The site contains significant building structures including lecture room,
                           caretaker’s residence and a substantial kiln together with other site
                           improvements (e.g. internal driveway and pathways).
 Build year                2003/04

The site is bound by the Tewantin Cemetery, Noosa-Tewantin Golf Club and Noosa District
Sports Complex as shown in Fig 1 below.




Fig 1: Aerial photo TAFE Facility

In November, 2012 the LNP State Government adopted a taskforce report that resulted in the
closing of 13 campuses including the Tewantin site while 12 other sites were merged between
Central Queensland University and the Central Queensland Institute of TAFE. The Tewantin
Campus has been vacant since 1 July, 2014 leading to community concerns about the loss of a
valuable education and training facility and various ideas being floated for reactivation of use of
the site.

                                                                                          Page 38 of 53

Section 39

GENERAL COMMITTEE MEETING AGENDA                                                      16 MAY 2016


The LNP government established Queensland Training Assets Management Authority (QTAMA)
to manage all State training assets. Since late 2014 a number of discussions and joint
inspections have occurred and Council has actively endeavoured to expedite a decision on the
future of the site.

The QTAMA Repeal Bill (2015) was passed by the Queensland Parliament on 15 July 2015
abolishing the Authority and returning the control of Queensland’s training assets to the
Department of Education & Training.

In the meantime the Tewantin campus assets have continued to deteriorate and remain vacant.

The current State Government has developed a State wide Consultation Paper – Developing a
Ten Year Strategic Training Asset Management Plan for Queensland (April 2016) – Refer
Attachment 1. The Minister has invited feedback over a broad range of possible aspects,
including, but not necessarily limited to:
    Key issues influencing training and skills in Queensland
    Trends and new training methods
    Effectiveness and suitability of training assets
    Options for training assets that don't meet community and training needs
    Ways the government can ensure that assets maximise training and skills outcomes
    The draft decision making framework being developed as part of the Strategic Training
      Asset Management Plan.

The Government’s intent is to use a decision making framework outlined in the consultation
paper to match training and skills demand with suitable asset management options. High level
principles have also been developed that give priority to the following needs:
1.    Training needs - primarily available for this purpose, priority access available for TAFE or
      other complementary training partners.
2.    Education needs – primarily available to support education services by the State
      Department for Education & Training or higher education parties; and/or higher education
      and training parties.
3.    Government needs – to support service delivery needs of State, Federal or Local
      government.
4.    Other needs – to support community needs, market-led and other proposals.

The planned approach appears reasonable.

CONSIDERATION OF COUNCIL POSITION

The approved Implementation Plan for the Noosa Economic Plan provides for Council to
continue to advocate for reactivation of the TAFE site to enable delivery of training and education
opportunities for the Noosa community. This aligns with the order of priorities 1 and 2 outlined in
the high level principles as set out above.

Council has no requirement for the site to meet its service needs under priority 3.

It is suggested that Council support the approach under priority 4 that market-led and other
proposals be “last resort” options for permanent solutions, but Council would also support this
approach in the short-term until the Government has determined its final position. It is
understood that CCIQ Noosa will be submitting a “Renew Australia” type model for use of the site
as a short term option which would limit further deterioration of the asset. The concept is



                                                                                      Page 39 of 53

Section 40

GENERAL COMMITTEE MEETING AGENDA                                                          16 MAY 2016


considered worthy of consideration by the State as an interim measure but it does have Noosa
Plan implications and may require impact assessment (depending on the proposed uses).

The State should resolve the preferred long term use with Council’s preference that it continues
as a venue for training and/or education purposes. In the event of the TAFE assessment
indicating no match with training and education demand, an Expressions of Interest should be
formally advertised for the site inviting offers from interested parties.

While some consideration has previously been given to our Council purchasing this site, our
preferred position is that the site is used for training and / or education purposes by relevant
State or non-government education institutions. If this can be achieved without the use of
ratepayer’s funds, that would be our best outcome. If the State is unable to identify any other
training and / or education use of the site via this consultation process, then an EOI process
would determine if there was a market demand for this site and the Council could consider at that
time whether we should consider a site purchase and that of course, would depend upon any
cost/benefit analysis. Our focus at this stage should be “activation” of the site, not ownership.

PROPOSED SUBMISSION

It is proposed that the Council make a submission to the State in relation to this matter along the
following lines:
     The State government has a valuable asset in the Noosa community which has been
       vacant for too long.
     The TAFE asset is deteriorating and the State needs to make a decision sooner rather than
       later in relation to the future of this site.
     In the meantime, our Council would support any proposal which re-activates the site in the
       short term (subject to any town planning considerations) while the longer term future of the
       site is determined.
     Noosa Council is generally supportive of the overall “high level principles” approach
       identified by the State in its consultation paper, namely that the priorities for sites such as
       the Tewantin TAFE site are:
       (i)    training needs;
       (ii) education needs;
       (iii) government needs; and
       (iv) other needs.
     In particular, we are supportive of the Tewantin TAFE site being primarily used for training
       and / or education needs. It is a purpose built training / education facility built by the State
       government for that specific purpose only 12 years ago.
     Noosa Council does not have any specific local government purposes that would require
       the use of this site for our day to day Council operations.
     In the event that the State is unable to identify any training and / or education use of the
       site under its high level principles 1 or 2, the State should call for Expressions of Interest for
       this site noting the land use zoning of the facility. At that stage, our Council may consider
       whether to participate in any EOI process.
     The State government should set a timeframe (ideally within 3 months) within which it
       should make a final determination on the future of this site.

Previous Council Consideration
While informal discussions have occurred at Local Member, Mayor, Councillor and officer level,
Council has not previously formally determined its position in relation to the future of the TAFE
facility.



                                                                                         Page 40 of 53

Section 41

GENERAL COMMITTEE MEETING AGENDA                                                           16 MAY 2016


Finance & Risk

Nil at this stage.

Consultation

External Consultation - Community & Stakeholder

The Economic Plan was developed after broad consultation through public workshops, 26 person
reference group, and provision for submissions through Have Your Say website.

The concept of a “Renew Australia” type approach for short term use has also been discussed
with the CCIQ Noosa President.

Internal Consultation

Departments/Sections Consulted:

X   Chief Executive Officer                Community Services                 Corporate Services
X   Executive Officer to the Mayor & CEO   Community Facilities               Financial Services
    Executive Support                      Community Development              ICT
                                           Libraries & Galleries              Procurement & Fleet
                                           Local Laws                         Property & Facilities
                                           Waste & Environmental Health       Revenue Services

X   Executive Office                       Planning & Infrastructure
    Community Engagement                   Building & Plumbing Services
    Customer Service                       Civil Operations
    Economic Development                   Infrastructure Planning & Design
    Governance                             Planning & Environment
    Human Resources                        Strategic Land Use Planning
    Sustainability




                                                                                          Page 41 of 53

Section 42

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016

                                   Attachment 1




                                   Page 42 of 53

GENERAL COMMITTEE MEETING AGENDA                   16 MAY 2016
                                                   Attachment 1

             Developing a ten year Strategic Training
             Asset Management Plan for Queensland
             April 2016

                               _            s

                . ——_ —    =     ie ~
     pee   {= =   .        z Teas              =
       co         aw       -    a
         Pa          a                :
  oan                   ——— t
              .           ¢    ern # |         =
       |                         SP
                -              — ot
  —_                           ca              ;

 -      ..          i> a            ert     *
‘a ae =         4S  tes                    »
    ee eS       MN eee           ———
 P   hee ey    :   ped Ve ene  5        ETT

                                                      ven
                                         A

                                                   Page 42 of 53

Section 43

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 43 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                                   16 MAY 2016

                                 z       ]          .   .         >
                                         _      Minister's message
                              6!
                             Lo]        /      The Palaszczuk Government is committed to economic growth and supporting
                               ae       i      Queenslanders to develop the skills to get a job.
                                               The future of Queensland and our communities depends heavily upon the delivery of
                               eo              training and skills services to enable individuals to achieve employment outcomes.
                                               Our Government is delivering on its promises and has abolished the former Queensland
                                               Training Assets Management Authority that was established to manage state-owned
                                               training assets.
                                               The Queensland Government recognises that growing the Queensland economy requires
                                               investment in skills and training. To support the creation of jobs into the future we have
                                               introduced a range of initiatives including:
                                               *  the Skilling Queenslanders for Work initiative worth $240 million over four years, to
                                                  support up to 32,000 job seekers
                                               ¢  using advice from the newly established Jobs Queensland to inform training priorities
                                               *  reinvesting in TAFE Queensland to restore its status as Queensland’s premier public
                                                  provider of vocational education and training; and
                                               ¢  establishing the Queensland Training Ombudsman.
                                               The development of a ten year Strategic Training Asset Management Plan for the future
                                               of the State’s training assets is part of this Government's response to deliver investment
                                               required to maximise training and skills outcomes for current and future generations of
                                               Queenslanders.
                                               This consultation paper has been developed at a state-wide level to seek a range of
                                               views on the key issues influencing training and skills and about the assets that support
                                               delivery of services by TAFE Queensland.
                                               | welcome all interested stakeholders to submit their feedback on this consultation paper
                                               and look forward to releasing the draft plan for further consultation in 2016.

                                         i Yvette D’Ath MP
                                               Attorney-General, Minister for Justice
                                               and Minister for Training and Skills

              2                                  Developing a ten year Strategic Training Asset Management Plan (STAMP) for Queensland —April 2016

                                                                                                                                 Page 43 of 53

Section 44

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 44 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                              16 MAY 2016

              This consultation paper is a key element of the consultation
              process underway to gather information, opinions,
              suggestions and other feedback about Queensland's
              training assets from interested stakeholders including the
              vocational education and training (VET) sector, industry,
              unions and communities.
              The Queensland Government and TAFE Queensland wishes
              to hear from stakeholders about how the state ensures
              assets are used to optimise training and skilling outcomes.        re         |           ?        |     i
              You can have your say by providing your submission via the     ay      al                          A      é \
              Queensland Training website:                                   _       Bs             -      4        —       »< 4                y
              www.training.qld.gov.au                                                  |                        a |      {      :             aa
              The feedback will inform the development of a ten year                       4 LS ad             i            Fl                >
              Strategic Training Asset Management Plan (STAMP) being                            Et                    .      !                  a
              prepared by the Queensland Department of Education and                                     r        BS                             :
              Training (DET).                                                      ;                                                           a

                            \) Py                                                              %
               -                \
                4 X   . ca       5
                  K       a      . a “                                                                     -
               +, a          “s                                                 :                          i       |
                toes                                      ;                        2
               SP”                                       e
               > a    bs         wy +              \         4                                                     ?
                         a *     sal a be   SS            Mi              ae |
                     ae                       |            WA                                                 3          $e                in
                            Pe             =           Ti   ‘    ae          NE                     *. a     j .   : 3     »    :           |" »
                              le |                         P                                                        |
                                                                     P      '   c|                    ,      va           ©                  i) m

                        i            —                    “te                     A                   4                .
                     -t)                 |         =      o
              =                f              ae                                                                        a)
                  ee    a          —“           r
                    .                          {                                                                             §          =         :
              eS         el                   .               ry                                                           a |       .   »

                                                                                                                                   3

                                                                                                                             Page 44 of 53

Section 45

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 45 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                                   16 MAY 2016

  el                                                          ae —              Pa  y  r

               tS
         fl                                                                                          }
                                                                                                    rl

x       2.         =                  z 7       pi                                                                     i
                                  {   f ee                                                                             7
          ii                        ii   Bent ae a                                  ==      = ———          ——.    7
          ea                       |                       i         oc              LL               2S
               Se           =                                                 cd               = |    \z   Se            die    pa           .
              =                                               I          _—           —                  CC

              The Queensland Government recognises the crucial role            The Queensland Government is committed to creating
              played by the VET sector in contributing to economic             employment opportunities by investing in skills and training
              growth and is committed to supporting the next generation        including the assets that support this goal.
              aie caeL aS Es                                                   The VET sector has undergone significant changes in recent
              Our vision is to grow a diverse, innovative and competitive      years because of technology, emerging industry sectors,
              economy by investing in skills and training. This includes       population shifts, economic changes and new learning
              improving learning environments for students through the         techniques.
              provision of accessible, modem’and high quality education        Recognising that state-owned training assets will continue
              and training facilities.                                                   .       .         .     a          aye
                                                                               to play a vital role in enhancing training and skilling
                                                                               outcomes; the Government is developing a STAMP to
                                                                               maximise the utilisation of state-owned training assets.
                                                                               The STAMP is being developed to support training and skills
                                                                               needs into the future, and TAFE Queensland as the state’s
                                                                               premier public provider of VET courses.
                                                                               This is why we are keen to hear what people believe should
                                                                               be done for state-owned training assets in their local
                                                                               area to deliver training needs and address issues where
                                                                               assets may not be adequately servicing the needs of our
                                                                               communities.

              4                                  Developing a ten year Strategic Training Asset Management Plan (STAMP) for Queensland —April 2016

                                                                                                                                 Page 45 of 53

Section 46

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 46 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                                   16 MAY 2016

    —                                                                                       SSS
                                                                                                   s SS
            -_                   a                                                                SSS                      ,
           =                     7                                                                          :         :   3      a
                                f             .                                                                 _               is

                                                 .                                      ~ 5                       ~            =
                                                    aN                                           a                          }
                                                      a        as 7                                 —
                                                       \                      eno                          ~                     Le    SN
                              .                           Sj                                                                     CS
             2                                              bs ee                a         -                                           .   ee    “
                                                                           ae  sal                                                      CRE
  —       ;             .                                            i         ‘   1  7      |   -                                       rs        % re
                                                                                  Saar                                        ,
          Pe                                                                               ee      |                                                 é
    . a            \                                                                                                   a.                 fn
                      .                                                                   es        .            x        |             -
          =  ‘i                                                                                 .   2                     }  .          +. 7
           -                                                                                                        ; % =)          :             2
           &                                                                                                        ,    Ere   Es       Fd            =
              nl                                                                                                                 ha}        f        =

              Queensland's training asset portfolio consists of over 40
              training facilities across the state- see Figure 1.
              The State’s training assets include land, buildings, plant
              and equipment. They are distributed across the state and
              aged between 5 and 35+ years, varying in condition, scale
              and function.
              TAFE Queensland is the state’s premier public provider of
              training, operating from the state-owned training assets
              and other facilities. DET is the owner of the assets and
              works in partnership with TAFE Queensland to maintain and
              manage the assets.
              Other users of the State’s training assets may include:
              *  complementary training partners of TAFE Queensland
              *  other education and training organisations
              *  community groups
              *  commercial tenants
              ¢  Government departments.
              Central Queensland state-owned training assets were
              previously transferred to Central Queensland University
              which owns and manages these training assets. The Central
              Queensland training assets are not included within the
              scope of developing the STAMP.
              Other public training providers such as agricultural colleges
              are not within the scope of the STAMP.

                                                                                                                                        5

                                                                                                                                 Page 46 of 53

Section 47

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 47 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                                           16 MAY 2016

                                   Employment Growth 2015-26                                         Nome ®   gutaroocycore
                                   and State-Owned Assets
                                                                                                      ore @   4
                                                         «   Thursday Island                                -
                                                                                                               Revciitte
                                                                                                          $    kan Ridgg,
                                                                                                     Grovely        4
                                     Employment Growth 2015-26                                                arm
                                     by SA3                                                                  _*       andra
                                    [EEE   15.000 10 50,000                                    arte @ mi0@    |        .
                                     | |10,000 to 15,000                                                        .      ‘i
                                     [| $,000 to 10,000                                                    Pans           Se
                                            2,500 to 5,000                                                                f]
                                     Hom 2500
                                                                                                                     -     South port.
                                                                                                                         @Psoutnport
                                                                           q Cairns                                        (Ridgeway)
                                                                              *—Great Barrier Reef International
                                                                                    Marine College (Cairns)
                                       Normanton °
                                                                                bs Ingham
                                                                                    -__Pimlico (Townsville)
                                                                         Pohie      . Burdekin Home Hill)
                                                                       (Townsville)           au   -Cannonvale
                                                                                Il
                                        « Mount Isa                                                ore

                                                                                                             Bundaberg
                                                                                                                       °
                                                                                                              Hervey Bay 4
                                                                                                           Maryborough          F
                                                                                                                           ewantin
                                                                                           Roma «+        Kingaroy . a
                                                                                                                   mpie «
                                                                                                  Chinchilla               oA (
                                                                                                       Toowoomba x            s
                                                                                                            Warwick »         °

                                                                                                                  Coolangatta

               Figure 1: Projected Employment Growth 2015-26 and state-owned training asset locations.
               Source: Queensland Government Statistician’s Office and Queensland Department of Education and Training.
               Note: Central Queensland University now owns and manages training assets in Central Queensland.

               6                                     Developing a ten year Strategic Training Asset Management Plan (STAMP) for Queensland —April 2016

                                                                                                                                          Page 47 of 53

Section 48

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 48 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                                 16 MAY 2016

              Population,                Employment & VET Forecasts

              Based on projected population and employment growth
              over the next ten years (see Figure 2 below) it is estimated
              that in 2026 there will be approximately 315,000
              enrolments in VET courses across the state, representing a
              17% increase from current annual delivery.

              Growth Projections in Queensland

                                                     Growth Projections in Queensland

                               Ey               3x                 2026 — 6,007,578                  21.5%
                                                                    2016 — 4,946,319

                                ph               }             2026 — 2,915,882               21.0%
                                 Employment                      2016 — 2,410,632

                           Ey <                              2026 — 314,132            17.1%
                                                              2016 — 268,213

              Figure 2: Forecast population, employment and VET delivery to 2026.
              Sources
              - Population growth data from the Australian Bureau of Statistics.
              - Employment growth data from the Queensland Government Statistician’s Office and the Centre of Policy Studies.
              - VET delivery growth data from the Queensland Department of Education and Training.

                                                                                                                                      7

                                                                                                                               Page 48 of 53

Section 49

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 49 of 53

Em                ploym                              ent                  growth                                      across                                  Queensland                                                                                                                  Figure                     3       below                       shows                       the              current  and ten year forecast of
 Empl                                             '                                  Q                               land                 |                                 tedt                                                   '                                                      employment                                             by          industry.                             The          current largest employing
      mploymen                                                  ri                                         nsland                         Is            ex                                                  TOW                                                                           .                             .                                                                                       . . :
            ,          ie              ©               ae                                   ueensia                              th),              EXPECIEC                                    108             whe                                 t                                      industries                                  are             health                       care                and      social assistance, retail
1.9                      \compoun                                    average                                an                             per                  annum                             e                          enex                                                         trade                   and                construction.                                            It      is       anticipated the largest forecast
ten             years,                      representing                                           around                          505,000                               new                jobs.                                                                                         growth                         will             be           across                       the              education  and training, transport,
                                                                                                                                                                                                                                                                                          postal                      and                warehousing                                             and            construction industries.

                                                             Health                   Care               and                                                                  ‘                                               ,                                              ‘                                               ,                                              ,                                   ‘ : '
                                                            Social                Assistance                                                                                  -                                               -                                              -                                               -                                              -                                   - - '
                                                                                                                                                                              '                                               '                                              1                                               '                                              '                                   \ \
                                                                             Retail               Trade                                                                                                                                                                                                                                                                                                         ' ' !
                                                                                                                                                                              '                                               '                                              {                                               t                                              '                                   ' ' '
                                                                      Construction                                                                                                                                                                                                                                                                                                                              ' '
                                                                                                                                                                              3                                               3                                              3                                               3                                              !                                   ! ! |
                                      Education                            and            Training                                                                                                                                                                                                                                                                          !                                   ! ' '
                                                                                                                                                                              1                                               1                                              1                                               1                                              '                                   1 ' 1
                        Professional,                                   Scientific                        and                                                                 :                                               :                                              :                                               :                                              '                                   ' '
                                       Technical                           Services                                                                                           .                                               .                                              '                                               .                                              '                                   ! 1 !
                                             Accommodation                                                and                                                                 :                                               :                                              :                                               :                                                                                  ' '
                                                          Food               Services                                                                                         ’                                               '                                              ’                                               .                                              '                                   ! 1 '
                                                                                                                                                                              \                                               i                                              {                                               \                                              i                                   ' ' '
                                                                   Manufacturing                                                                                                                                                                                                                                                                                            t                                   1 ' {
                                                                                                                                                                              '                                               1                                              1                                               1                                              '                                   ' ' i
                                           Public                 Administration                                                                                              .                                               .                                              .                                               '                                              '                                   1 ' {
                                                              and            Safety                                                                                           |                                               |                                              |                                               |                                              !                                   | ! |
                                           Transport,                             Postal                  and                                                                 .                                               ’                                              .                                               :                                              !                                   ' ' I
                                                      Warehousing                                                                                                             .                                               ’                                              ’                                                                                                                                  ' '
                                                                                                                                                                              '                                               t                                              i                                               '                                              '                                   ' ' i
                                                                    Other                 Services                                                                                                                                                                           '                                               t                                              '                                   ' ' '
                                                                                                                                                                              1                                               1                                              '                                               '                                              '                                   ' ' '
                                                   Administrative                                         and                                                                                                                                                                i                                               '                                              '                                   ' ' '
                                                        Support                       Services                                                                                                                                '                                              \                                               '                                                                                  \ \
                                                                                               Mini                                                                                                                           '                                              i                                               '                                              1                                   ' \ '
                                                                                                      ning
                                                                                                                                                                              1                                               i                                              i                                               '                                              i                                   ' \ '
                                                                                                                                                                                                                              '                                              '                                               \                                              '                                   ' \ '
                                                           Wholesale                              Trade                                                                                                                       '                                              '                                               '                                              '                                   ' ' '
                                                                                                                                                                                                                              '                                              '                                               '                                              '                                   ' ' '
                                                                Financial                       and                                                                                                                           i                                              '                                                                                              1                                   i '
                                                      Insurance                           Services                                                                                                                            :                                              !                                               '                                              '                                   ! ' '
                                                                                                                                                                              '                                               i                                              i                                               \                                              '                                   i ' '
                                              Agriculture,                                Forestry                                                                                                                            '                                              ‘                                               '                                              '                                   ‘ ' |
                                                               and            Fishing                                                                                                                                         '                                              \                                               ;                                              i                                   ' ' \
                                       Rental,                    Hiring                 and            Real                                                                                                                  i                                              i                                                                                              1                                   i 1
                                                     Estate                 Services                                                                                          ?                                               '                                              '                                               '                                              '                                   ' 1 '
                                                                                                                                                                              '                                               i                                              i                                               \                                              i                                   ' \ {
                  Arts             and            Recreation                              Services                                                                                                                            1                                              '                                                                                              1                                   1 '
                                                                                                                                                                              1                                               '                                              '                                               '                                              '                                   ' ' '
                                         Electricity,                          Gas,              Water                                                                                                                        1                                              '                                                                                              1                                   i i
                                             and             Waste                   Services                                                                                 '                                               '                                              |                                               '                                              '                                   ' ' |
                                     Information                                 Media                    and                                                                                                                 1                                              1                                                                                              1                                   1 '
                                         Telecommunications                                                                                                                   '                                               '                                              '                                               '                                              |                                   ' ' '
                                                                                                                            -                                              50                                           100                                            150                                             200                                            250                                       300 350 400

                                                                                                                                                                                                                          ™ 2026                      (000)                               2016                (‘000)

 Figure                3:      Current                   and           forecast                     employment                                 by       industry                     in      Queensland.                                  Source:                    Queensland                                Government Statistician’s                                                              Office    and the Centre of Policy Studies.

8                                                                                                                                                        Developing                                  a      ten           year Strategic                                        Training                        Asset                  Management                                          Plan               (STAMP) for Queensland —April 2016

                                                                                                                                                                                                                                                                                                                                                                                                                Page 49 of 53

Section 50

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 50 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                           16 MAY 2016

             VET delivery across Queensland
             The following diagram (figure 4) provides a snapshot of the
             current VET enrolments across the State by industry training
             group.

              Current VET Enrolments across Queensland by Industry Training Group

                   Community Services                                                           ET
                            Business                                ee
                 Transeo & Ostibcr Es
                           +6
             Covers tvcaton & 1-6
                         Engineering ——
                                 +
                               Real
                              ‘o>
                      Primary dry

                   Arts& Entertainment J

                             rosy
                       Food Processing =a
                   Sports & Recreation =
                           Furnishing =
                 Process Manufacturing [i
                          Gowenment ll

              Textile, Clothing & Footwear a
                                    °      000     10,000  15,000  2,000   25,000  30,000   35,000 40,000   45,000

             Figure 4: Current VET training enrolments across Queensland. Source: Queensland Department of Education and Training. Based on 2014-15 data.

                                                                                                                                9

                                                                                                                          Page 50 of 53

Section 51

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 51 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                            16 MAY 2016

              Draft Decision                 Making Framework

             As part of the STAMP, a draft Decision Making Framework       Asset management options will include consideration of
              has been developed and prepared for discussion and input     alternative uses and innovative partnerships according
              by stakeholders. Once finalised, the framework will be used  to the draft Decision Making Framework where there is
              by DET to match training and skills demand with suitable     insufficient training and skills demand.
              BSSEE AAR EISNL SPUN Ss                                      The stakeholder input is essential to ensure DET reflects
                                                                           industry views in the development of a framework intended
                                                                           to be applied to state-owned training assets.

              Draft Decision Making Framework Part A - Training and Asset Needs Planning
             The diagram below illustrates the proposed process DET intends to use in order to plan for training and asset needs.

                Forecast Employment & Industry                                               Forecast Training Needs
                + Department of Education and Training
                  gathers forecast information on                                       +  Department of Education and Traini
                  Sea a                                                                    forecasts the future vocational  =
                + Jobs Queensland, Working Queensland                                      education and training needs
                  Cabinet Committee and other information                               .                    forecas
                  sources will provide skills analysis of                                  oe                       cane
                  industry sectors across the state to
                  advise government on current and future
                  skills needs.

                   Matching Training & Assets
                +   Department of Education and Training      4             3
                    in consultation with TAFE Queensland                                                        ;         i
                                              :                                         *  Department of Education and Training
                    to match supply of assets with forecast                                has a portfolio of training assets
                    ermg needs                                                             distributed across the state and with
                +   Where there is a match, asset                                          training delivered by Government's
                    maintenance and renewal is planned                                     premier public provider TAFE
                                ;     7                                                    Queensland. Assets vary in scale,
                +   Where there is a mismatch, the asset                                                              ;
                    and training      ene        i                                         een age, location and internal

              10                               Developing a ten year Strategic Training Asset Management Plan (STAMP) for Queensland —April 2016

                                                                                                                          Page 51 of 53

Section 52

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 52 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                16 MAY 2016

                        ax                                ~                                        i             ,
                        ie      Se                          ¢                                        f           |
                   N       cs)      wm             -                                               (            -    A
                     A             Y                         .             PP)
                    SAISR)                  r                e        ¥
                    ¢     ,  «                     ‘    ‘                     ,
                                                               << _                                                              ,

                             *                            |                                                                  4
                          th         '                    a                                           y Lord                 P
                           Bile                                                    ~
                                       |          .,                                   4

            Draft Decision Making Framework Part B — High level principles
            The diagram below outlines the proposed principles DET will use to guide future use of state-owned training assets.

                     Training
                      Un tetote fs       :
                                          >  Xe |Fle-)alela)
                                         lA    Needs
                                                                    Government
               + Training assets are
                 primarily available                                                            Other
                 to support the                                                                Needs
                 delivery of              + To support the
                vocational                  delivery of
                 education and              education services
                 training services          by the Department        . pte the
               + Priority access for        of Education and                 es
                                           Training                    (oats
                 TAFE Queensland                                      services by other        * To support
               .                          + Higher education          Government                 community needs
                 Other TAFE                                                  :
                Queensland                  pe                        sedliais                 * Market led and
                complementary             + Higher education         + State, federal, local     other proposals
                 training partners          and training by third
                                            parties

                                                                                                                    11

                                                                                                              Page 52 of 53

Section 53

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2016




                                   Page 53 of 53

GENERAL COMMITTEE MEETING AGENDA                                                                                                   16 MAY 2016

              Considerations

              To ensure that the use of training assets are optimised
              and that we can continue to deliver on the training needs
              of our communities, various other factors will need to be
              considered, such as:
              ¢  Population growth and demographics
              *  Changing workforce requirements
              *  Community profiles and needs
              *  Current and future skills and training demand
              ¢  TAFE Queensland training needs forecast
              *  Learning styles and methods
              *  Specialised and generic training facilities
              ¢  Use, condition and ‘fit for purpose’ assessment of assets
              *  Location and proximity of the ‘asset base’ to meet
                 training demand (driven by industry and population)
              ¢ Value to the community
              *  Budgetary and fiscal constraints.

              Acknowledgement
              Images by Tony Phillips, David Crowley and Verlie Lloyd.

                                                                              os                      |                                        .
                                                                           -        ’                                                              a

                      Have your say                                                                                                               a
                                                                                                              ee        .              ;     el
                     DET and TAFE Queensland want stakeholders and the community to have a                .          .                          mn
              ,       say in the way it manages the State’s training assets to meet the Queensland            em      4            =>               f
                     Government's   overall objective of building jobs and opportunities for                  i                     Ty        i
           ea         Jueenslanders                                                                          —                     G
          Pa          50 to www.training.qld.gov.au for information on how to have your say                               .                      Y

                                                                                                           ‘                                    =
                                                                                                      St                                AN
                                                             =.                 ‘                                                 ‘ 4
                                                ~_,                     Ja                                                      ;
             a                                         -

                                                                                                                                 Page 53 of 53

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.