Council archive · source document
Delegated Report - Code - Planning MCU25 0021 (As Published) · MCU25/0021
9. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
10. All planting areas on the eaves must be planted and maintained at all times, with replacement
planting undertaken promptly where plants fail or do not have a healthy and vigorous growth.
Site Access and Driveways
11. A sealed access driveway must be provided from Park Crescent to all parking and
manoeuvring areas of the development. The works must be generally in accordance with the
approved plans and undertaken in accordance with an Operational Works approval. The
works must include in particular a driveway crossover generally in accordance with Council’s
Standard Drawings RS-049 and RS-050.
Stormwater Drainage
12. Stormwater runoff from the development must be discharged to Park Crescent or disposed
of on-site without causing scour or damage to the subject site or any adjoining property.
Damage to Services and Assets
13. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
(a) where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
(b) where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Geotechnical Stability
14. All works must be carried out in accordance with a Geotechnical Report for the site prepared
by a qualified person*. Certification must be submitted to Council from a qualified person*
which certifies that the site is not at risk from landslide emanating from the site or from other
land.
*(Refer to Advisory Note)
5. REFERENCE DOCUMENTS
Not applicable.
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
carries out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
Page 16 of 18
Document Set ID: 23619632
Version: 6, Version Date: 16/05/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU25 0021 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.