Original source · versioned page text
Att 2 - Body Corp Consent
rth
adams+sparkes
TOWN PLANNING
BODY CORPORATE CONSENT
RE: Proposed Footpath and Driveway Works
32 Peregian Esp, Peregian
Lots 0-3 on GTP424
On behalf of the owners and body corporate of Lots 0-3 on GTP424, we formally consent to the proposed
footpath and driveway works as shown on proposed on attached Drawing No. C02 Site Plan (22-0147, Rev E,
21/10/24),
As execited/for:
BODY CORPORATE FOR PACIFIC PLACE COMMUNITY TITLES SCHEME
cy L (signature)
'T,
he an rh (name)
ce .. (position)
{
Signed on the __' S day of Lmlbbu | 2024.
P 0752313200 E [email protected] W astpd.com.au
SUNSHINE COAST | BRISBANE | ROCKHAMPTON
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.