Council archive · source document
Engineering drawings [As Published] · 132007.2398
SILT MANAGEMENT PROGRAM PHASE 1 PRE START DESCRIPTION OF WORKS + ERECT SITE SIGNAGE » CONSTRUCT ENTRY AND EXIT POINT AS INDICATED + CONSTRUCT VEHICLE WASHDOWN AREA AND ASSOCIATED SILT MANAGEMENT DEVICES + CONSTRUCT SITE OFFICE AND STORAGE COMPOUND AREA - ERECT SILT FENCE AT LOW POINTS OF THE SITE AS DEMONSTRATED CONTRACTOR TO DISPLAY APPROPRIATE WORKPLACE HEALTH AND SAFETY SIGNAGE DETAILING THE AREA BEYOND IS A CONSTRUCTION SITE AND ONLY AUTHORISED PERSONAL CAN ENTER. ENTRY/EXIT LOCATION INSTALL SHAKEDOWN DEVICE SILT MANAGEMENT PROGRAM PHASE 2 CLEARING AND BULK EARTHWORKS Si CLEARING EARTHWORKS BASINS MAINTENANCE ORKS * SILT FENCE, SAND BAGS AND EARTH RILLS TO BE ERECTED AS INDICATED OR AS DIRECTED. + EXISTING GRASSED AREAS TO BE KEPT WHERE POSSIBLE AND EXPOSED DISTURBED AREA MINIMISED. » REQUIRED EARTHWORKS AREA TO BE STRIPPED OF TOPSOIL AND STOCKPILED. + SUPERINTENDENT TO CONFIRM EXTENT OF CLEARING/EARTHWORKS TO CONTRACTOR PRIOR TO COMMENCEMENT OF WORKS. + SILT FENCES TO BE RE-ERECTED AS REQUIRED OR AS DIRECTED BY THE SUPERINTENDENT « BASINS TO BE BULKED-OUT AND ACT AS TEMPORARY SEDIMENT BASINS THROUGH CONSTRUCTION PHASE + SILT FENCES AND EARTH RILLS WITHIN ROADS TO BE ERECTED AS INDICATED OR REQUIRED + THE SILT FENCES ARE TO BE INSPECTED WEEKLY. ANY REPAIRS REQUIRED ARE TO BE EFFECTED IMMEDIATELY. + SILT AFTER RAIN IS TO BE CLEANED FROM STREETS AND ALLOTMENTS IMMEDIATELY AND CORRECTIVE ACTION TAKEN TO AVOID A RE-OCCURRENCE OF THE FAILURE. LEGEND x * * SILT FENCE SILT MANAGEMENT PROGRAM PHASE 3 CONSTRUCTION DESCRIPTION OF WORKS SEWER/ROOFWATER/ «EXCAVATED MATERIAL TO BE PLACED ON HIGH SIDE STORMWATER/SERVICES OF TRENCH AND TO PROTECT PIPE WORK AND DIRECT SURFACE MATERIAL AWAY FROM EXCAVATIONS. + DEPRESS GROUND AROUND TEMPORARY FIELD INLETS TO CREATE SILT POND. STOCKPILE + SILT FENCE TO BE ERECTED 5M FROM TOE OF BATTER ON LOW SIDE OF STOCKPILE. « STOCKPILE SITE TO BE CLEAR OF STAGE BOUNDARIES SD NOT TO CAUSE A NUISANCE TO ADJOINING PROPERTIES. ROADWORKS ALLOTMENTS: + SILT FENCES TO ALLOTMENTS TO BE RE-ERECTED, + COVERS TO GULLY GRATES TO BE REMOVED IF THE ‘SUPERINTENDENT INDICATES THE GRASS STRIKE IS SUFFICIENT. MAINTENANCE IMMEDIATELY. + SILT AFTER RAIN OR CONSTRUCTION TRAFFIC IS TO BE CLEANED FROM STREETS AND ALLOTMENTS IMMEDIATELY AND CORRECTIVE ACTION TAKEN + SILT FENCES TO ALLOTMENTS TO BE RE-ERECTED AS REQUIRED. KERB INLET PROTECTION TO BE PROVIDED TO ALL GULLIES. + THE SILT FENCES ARE TO BE INSPECTED WEEKLY AND FOLLOWING RAIN FALL EVENTS. ANY REPAIRS REQUIRED ARE TO BE EFFECTED ee ee ee STAGE BOUNDARY NOTE: SEDIMENT & EROSION CONTROL DEVICES TO EXIST WITHIN EACH POSSIBLE STAGE TO COMPLY WITH COUNCIL SEDIMENT & EROSION REQUIREMENTS. REFER DWG. NO. NO7058-DA07 SILT MANAGEMENT PROGRAM PHASE 4 POST CONSTRUCTION (ON MAINTENANCE) DESCRIPTION GF WORKS ALLOTMENTS + TOPSOIL AND SEED WHERE DIRECTED. “COVERS TO GULLY GRATES TO BE REMOVED IF THE SUPERINTENDENT INDICATES THE GRASS STRIKE IS SUFFICIENT. + CLEAN OUT SEDIMENT FROM BASIN AND FINALISE BASIN CONSTRUCTION. BASIN ROAD RESERVES + TOPSOIL AND TURFING TO BE PROVIDED IN ACCORDANCE WITH THE LANDSCAPE ARCHITECTS DRAWINGS. MAINTENANCE + THE SILT FENCES ARE TO BE INSPECTED WEEKLY. ANY REPAIRS REQUIRED ARE TO BE EFFECTED IMMEDIATELY. + SILT AFTER RAIN IS TO BE CLEANED FROM STREETS AND ALLOTMENTS IMMEDIATELY AND CORRECTIVE ACTION TAKEN TO AVOID A RE-GCCURRENCE OF THE FAILURE. NOTE: KERB INLET PROTECTION DEVICES ARE TO BE REMOVED ONLY AFTER A SUCCESSFUL ON MAINTENANCE INSPECTION HAS BEEN COMPLETED. FRE: HOTOS# DADS vg DATE: 16-11-2007 TIME: W:36 [Xref's; NO7OSS-tit NO7BSB-BASE XS83-RAC_Liplan-060807-Idegree XOS88-AuA_GPL X0588-iuB_GPL X0588-ituC_GPL X0588-WuD_GPL X0582-uA1_GPL USR: Michael Dobas ar [ona are a —— area at STS aot woe [— [0 | 007 QSOAENT BETARS SURVEYOR: KEN HICKS & ASSOCIATES ae 49 THE ESPLANADE MAROOCHYDORE RSL CARE PTY LTD if Lee esse os was Leh (07) S443 2040 Fax (07 Se43 7066 besaer #h ional al Stoel ae RSL CARE f NO7058 iF Fea an i i EP 0 COOROY RETIREMENT VILLAGE SEDIMENT & EROSION CONTROL PLAN SHEET 1 OF 2 Brown (QLD) Ply Lid Engineers & Level 1, 15 Woy, Bodine QLD Arab 2575 Telephone 07 5477 6469 Focimile 07 5477 6486 Prene Conbern labour Sydney Singonere ambi Ct e = MER NO7058-DA05
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering drawings [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.