Council archive · source document
Engineering drawings [As Published] · 132007.2398
POSSIBLE STAGING SEQUENCE TATE
“Ns PHASE 1 + CLEAR SCRUB/TREES FROM CIVIL STAGE ONE. SEDIMENT & EROSION CONTROL DEVICES TO EXIST
WITHIN EACH POSSIBLE STAGE TO COMPLY WITH
PHASE 2 ~ EARTHWORKS TO FACILITATE STAGE A BUILDING WORKS. COUNCIL SEDIMENT & EROSION REQUIREMENTS.
PAHSE 3 + EARTHWORKS TO FACILITATE STAGE B BUILDING WORKS.
PHASE 4 * CLEAR SCRUB/TREES FROM CIVIL STAGE TWO. LEGEND
PHASE 5 + EARTHWORKS TO FACILITATE STAGE C BUILDING WORKS.
=—— == =e ee mess m= CIVIL WORKS STAGE BOUNDARY
PHASE 6 + EARTHWORKS TO FACILITATE STAGE D BUILDING WORKS.
srrrrorteocteoeeceeceecaecoaecazee POSSIBLE STAGING SEQUENCE BOUNDARY
™ a PHASE 7 * EARTHWORKS TO FACILITATE STAGE E BUILDING WORKS.
PHASE B * EARTHWORKS TO FACILITATE STAGE F BUILDING WORKS. POSSIBLE SURDWG STADRIG PHASE
ROAD
JFLE: NO7OSB-DAN7 dq ATE: 16-11-2007 THE: 1045 “
[Xref's: NOTESB-Hit NOVOSE-BASE XSB8-RAC_Liplan-060007-Megree XOSEE-tuA_GPL_XO5H8-auB_GPL XOSBB-Lu_OPL_XOS88-iuD_GPL XOS#8-iwAT_GPL USR: Hichuel Daba
ram [uc [paves] mane eman cocx cone (METRES) SBCROFR Ho. Sone Grae omer Brown Consulting (QLD) Pty Lid. Engineers & Man mms
—————— i Stat tei RSL CARE PTY LTD perenne eee eo
fr Las Eo oe be Ph (07) 5443 2844 Fax (07) 5443 7146 — Drab Catan Ines ney Sepa Deen Cot LAYOUT PLAN
cc SS : on [sence
Ho omen] 20 2 ee RSL CARE eS res a
it FOR & ON BEHALF OF BROWN CONSULTING (QLD! PTY LTO COOROY RETIREMENT VILLAGE NO7058-DA07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering drawings [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.