Appendix H - SDAP Response · REC15/0011
Attached to the e-mail REC15/0011 - Development Application for Reconfiguration of a lot - 1 lot into 11 lots plus balance lot - Appendices F, G, H & I email 2 of 2.
Performance outcomes Acceptable outcomes Response Comment
(b) uses layout design to minimise the footprint of
the development that remains within the erosion
prone area, or
(c) provides sufficient space seaward of the
development within the premises to allow for
the construction of erosion control structures.
AND
AO6.6 Redevelopment of built structures in the erosion
prone area within a coastal management district, which
results in an intensification of use, mitigates the erosion
threat to the development, having regard to:
(1) design and construction standards
(2) installing and maintaining on-site erosion control
structures within the premises if the development is
not intended to be temporary.
PO7 Private marine development avoids AO7.1 Coastal protection work that is in the form of beach N/A The proposed development is not for a private marine
or minimises adverse impacts on coastal nourishment uses methods of placement suitable for the development.
resources and their values, to the location that do not interfere with the long-term use of the
maximum extent reasonable. locality of, or natural values within or neighbouring, the
proposed placement site.
AND
AO7.2 Marine development is located and designed to
expand on or redevelop existing marine infrastructure
unless it is demonstrated that it is not practicable to
co-locate the development with existing marine
infrastructure.
AND
AO7.3 Marine development:
(1) relies on a natural channel of a depth adequate for
the intended vessels, or
(2) where there are no feasible alternative locations for
the facility in the local area that do not require
dredging for navigation channel purposes:
(a) involves capital dredging for new navigation
channel purposes
(b) is located, designed and operated to minimise
the need for capital and subsequent
maintenance dredging for navigation channel
purposes.
State development assessment provisions Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code
20 June 2014 V1.4 Page 7 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix H - SDAP Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 87 KB (small file)
- File type
No other editions are linked here.