Original source · versioned page text
RFI - Stormwater management (flood report)
Very large file: it may take a few minutes
The original of this document is very large (10.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
7. REFERENCES
Noosa Shire Council (NSC) Planning Scheme 2020;
http://www.bom.gov.au/water/designRainfalls/revised-ifd (Bureau of Meteorology,
Online Rainfall IFD Data System);
State Planning Policy (Department of Infrastructure, Local Government and Planning,
2017);
Australian Rainfall and Runoff (Institute of Engineers Australia, 2019);
Queensland Urban Drainage Manual – 4th Edition (Institute of Public Works Engineering
Australasia, Queensland Division, 2017);
MUSIC Modelling Guidelines Version 1.0 (Water by Design, 2010);
Maintaining Vegetated Stormwater Assets (Water by Design, 2012); and
Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands
(Water by Design 2012).
21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona | 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.