Skip to the record
Beware of cheap imitations.

Council archive · source document

MCU14/0073 Town Planning Report

of 108

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR AN EXTENSION TO AN EXISTING INDUSTRIAL BUSINESS (TYPE 2) –
SOFT DRINK FACTORY WITHIN AN EXISTING BUILDING
271 LAKE MACDONALD DRIVE, LAKE MACDONALD                                                                         19

4.3    State Planning Policy
46.    The State Planning Policy (SPP) identifies State interests, which apply to development on the subject site.
       An overview of all applicable SPP interests has been provided in the following sections:

                  Biodiversity (matters of State environmental significance);
                  Water Quality (water supply buffer area and climatic regions); and,
                  Natural Hazards (flood hazard area and potential bushfire impact buffer).

47.    With regard to the above, the proposal will be located within the existing industrial building and complies
       with the outcomes sought by the SPP on the following basis:

                  The proposal will not involve clearing of vegetation or result in significant adverse
                   environmental impacts;
                  The proposed extension will be in accordance with the original approval and engineering
                   works (refer to Appendix II) and will therefore not result in adverse impacts on the
                   environmental values of receiving waters; and,
                  The proposal will avoid and mitigate any risks associated with natural hazards.

4.4    State Interests
48.    The following State interests are identified under Schedules 3, 6 & 7 of the Sustainable Planning
       Regulations (SPR) 2009:

                   South East Queensland Regional Plan 2009-2031 (SEQ Regional Plan) pursuant to
                    schedule 7, item 12 of the SPR, where division 2 of the SEQ Regional Plan applies.

49.    It is noted that the proposed extension will not result in an additional output, which exceeds 10,000 tonnes
       annually and therefore does not require referral under Schedule 9 of the SPR.




COOROY PROPERTY PTY LTD
SEPTEMBER 2014

Used in these records

About this file

File size
8.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU14_0073 Town Planning Report.pdf · 8.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.