Delegated Report - Code - Planning - OPW26 0130 (As Published) · OPW26/0130
Plan No. Rev. Plan/Document Name Date
- - Driveway Plan 30/09/2026
Constructed by Applicant
As Annotated by Council
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 30 September 2028, unless an application to extend the currency
period is approved by Council.
GENERAL CONDITIONS
Engineering
3. Any changes to the details associated with the Principal Contractor during construction, must
be notified to council in writing within five business days of the change occurring.
4. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
5. The integrity and condition of any existing public or Council infrastructure and services
(above ground and/or underground) must not be adversely affected by the proposed works
6. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.
7. All works must be constructed and work procedure undertaken in accordance with:
a. the approved plans/documents and conditions detailed in this Decision Notice
b. all relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines
c. the latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site.
Works within Road Reserves
8. No removal of street trees is permitted without Council’s prior written approval.
9. Safe pedestrian access on all streets in the vicinity of the development must be maintained
at all times. Should footpath/road closures be necessary to carry out construction works,
Council’s Engineering Officer must be notified prior to the proposed closure and all
requirements complied with.
10. All works must match neatly with existing road and verge/footpath features. Additional works
beyond the frontage may be required to provide an acceptable transition to existing road and
verge/footpath profiles.
Driveways
11. Driveway crossovers must be constructed generally in accordance Council’s Standard
Drawings RS-049, RS-050 and any associated addendum.
Page 5 of 8
Document Set ID: 25210078
Version: 2, Version Date: 30/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records