Original source · versioned page text
Attachment E - Assessment Env Values Report
Callaghan and Toth Consulting Engineers______________________________________________________
Biodiversity Overlay
native fauna movement; Community residence and on an allotment situated of the Lower Mill site. This riparian zone does provide a
d) avoiding edge effects and wholly within the Riparian Buffer Area, wildlife corridor along Cooroy Creek and down to Six Mile
incompatible uses in riparian zones; a) fronting the Noosa River – development is Creek.
e) maintaining bank stability by setback a minimum of 40m from mean high water
minimising bank erosion and spring or as otherwise prescribed by the As part of the proposed development water quality will be
slumping; Environmental Protection Agency’s Erosion prone managed as per the attached Stormwater Quality
f) maintaining water quality by filtering Area Maps; Management Plan (SWQMP) by Callaghan and Toth Pty
sediments, nutrients and other b) not fronting Noosa River – Ltd. The existing biobasins (refurbished) and some
pollutants; and development is located outside the riparian zone existing and new swales will treat sediment and nutrients
g) removing undesirable plant species and setback a suitable distance from the loads in the stormwater flows, to protect the water quality
and replacing them with vegetation of watercourse having regard to the development of the adjacent watercourse.
local origin; constraints of the property and the need to protect
environmental and riparian values;
OR
S5.3 For Animal husbandry on premises in the
Rural Zone –
a) stock proof fencing is installed along watercourses
at a distance of no less than 10m from the top of
the bank;
b) stock watering points are located no less than
15m away from the top of the bank of
watercourses; and
c) stock crossing points across watercourses are
defined and controlled with stock proof fencing, to
prevent stock from damaging riparian vegetation
or banks to watercourses;
OR
S5.4 Recreational facilities (including playgrounds,
pergolas, barbeques etc) are setback a minimum of
30m from the top of the bank of a watercourse and
10m from the top of the bank of a drainage line;
OR
S5.5 For Forestry uses the cultivated area is
separated from watercourses by a distance not less
than the distances identified below, measured from
high water mark or the top the bank, whichever is the
greater distance –
Feature Distance
Stream order 1 or 2 5m
X:\JOBS\CT Projects in progress\2001 env reports for cooroy playground carparks\Correspondence\Reports\ENV\Lower Mill Carpark\Biodiversity Overlay_LowerMillCarparkExtension.docx pg. 9
pg. 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment E - Assessment Env Values Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.