Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

MCU15/0086 - IDAS Form 1 - Village Bicycle

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                            Departmentor Inrrastructure,LocalGovernmentand Planning



 Email address (non-mandatory                  villagebicyclenoosa
 requirement)
                                               @gmailcom

 Applicant's reference number (non-
 mandatory requirement)

 1.       What is the nature of the development proposed and what type of approval is
          being sought?

 Table A-Aspect 1 of the application (If there are additional aspects to the application
      please list in Table B-Aspect 2.)
 a)     What is the nature of the development? (Please only tick one box.)
        Material change of       Reconfiguring a lot       Building work        Operational work
           use X


 b)     What is the approval type? (Please only tick one box.)
        Preliminary approval     Preliminary                evelopment
            under s241 of            approval under            ermit.
            SPA                      s241 and s242
                                     of SPA

 c)     Provide a brief description of the proposal, including use definition and number of
        buildings or structures where applicable (e.g. six unit apartment building defined as a
        multi-unit dwelling, 30 lot residential subdivision etc.)

      I outdoor use for dining licensed cafe
 d)     \M1atis the level of assessment? (Please only tick one box.)
        Impact assessment       Code assessment X



 Table B-Aspect 2 of the application (If there are additional aspects to the application
 please list in Table C-Additional aspects of the application.)
 a)     What is the nature of development? (Please only tick one box.)
        Material change of      Reconfiguring a lot        Building work        Operational work
           use


 b)     What is the approval type? (Please only tick one box.)
        Preliminary approval    Preliminary                Development
            under s241 of           approval under            permit
            SPA                     s241 and s242
                                    of SPA

 c)     Provide a brief description of the proposal, including use definition and number of
        buildings or structures where applicable (e.g. six unit apartment building defined as a
        multi-unit dwelling, 30 lot residential subdivision etc.)




Application details
                                                                           Version 4.2-3 August 2015
Log in to download the original file

MCU15_0086 - IDAS Form 1 - Village Bicycle.pdf · 4.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.