TIA - 2407-41400 SRA Application decision - s62A (PA) - Approval_1

Attached to the e-mail MCU24/0084 - SARA Approval.

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Material Change of Use

No. Conditions of Approval                                                    Condition Timing



            (c) The road access works must be designed and constructed in
                accordance with:
         i.     Department of Transport and Main Roads, Standard Drawing
                No. 1807, dated 11/2021, Rev B;
        ii.     Department of Transport and Main Roads’ Road Planning
                Design Manual – 2nd Edition, Volume 3 – Guide to Road
                Design.

2     (a) Road works comprising Basic Right Turn (BAR) and Basic Left         Prior to the
      Turn (BAL), must be provided generally in accordance with               commencement of
      attachment F: Functional Layout Plan, Morgan Consulting                 use
      Engineers, dated 19 August 2024, Drawing No. 24080/SK20,
      Revision C.

      (a) The road works must be designed and constructed in
             accordance with:
         i.     Department of Transport and Main Roads' Road Planning
                and Design Manual, 2nd Edition, Volume 3 – Guide to Road
                Design;
         ii.    Department of Transport and Main Roads' Supplement to
                Austroads Guide to Road Design (Parts 3, 4-4C and 6);
        iii.    Austroads Design Vehicles and Turning Path Templates;
        iv.     Queensland Manual of Uniform Traffic Control Devices, Part
                13: Local Area Traffic Management and AS 1742.13-2009
                Manual of Uniform Traffic Control Devices – Local Area
                Traffic Management.
3     Vegetation removal and benching must be carried out to ensure           Prior to the
      Sight Visibiity from the existing driveway meets SISD 160m to the       commencement of
      east and SISD 240m to the west, generally in accordance with            use and to be
      attachment G: Sight Visibility from existing driveway SK01 – Aerial     maintained at all
      View, dated August 2024, prepared by Hayes Traffic Engineering.         times.
4     Direct access is prohibited between Louis Bazzo Drive and Lot           At all times.
      4RP160124 at any other location other than the permitted road
      access location described in Condition 1.


Reasons for the decision
The reasons for this decision are as follows:
       a) Vehicular access must not compromise safety of the users of the state-controlled road
          network.
       b) The safety of users of the state-controlled road network is the primary consideration for
          all works in a state-controlled road corridor.




                                                                                              Page   2 of 15
Log in to download the original file

TIA - 2407-41400 SRA Application decision - s62A (PA) - Approval_1.pdf · 502 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.