Original source · versioned page text
DA Form 1
Section 2 – Further development details
7) Does the proposed development application involve any of the following?
Material change of use Yes – complete division 1 if assessable against a local planning instrument
Reconfiguring a lot Yes – complete division 2
Operational work Yes – complete division 3
Building work Yes – complete DA Form 2 – Building work details
Division 1 – Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument.
8.1) Describe the proposed material change of use
Provide a general Provide the planning scheme definition (include each Number of dwelling Gross floor
description of the definition in a new row) units (if applicable) area (m2)
proposed use (if applicable)
Low Impact Industry Low impact industry means the use of premises for an 21 2,800m2
industrial activity—
a) that is the manufacturing, producing,
processing, repairing, altering, recycling,
storing, distributing, transferring or treating of
products; and
b) that a local planning instrument applying to the
premises states is a low impact industry; and
c) that complies with any thresholds for the
activity stated in a local planning instrument
applying to the premises, including, for
example, thresholds relating to the number of
products manufactured or the level of
emissions produced by the activity.
Warehouse Warehouse means the use of premises for-
a) storing or distributing goods, whether or not
carried out in a building; or
b) the wholesale of goods, if the use is ancillary
to the use in paragraph (a).
8.2) Does the proposed use involve the use of existing buildings on the premises?
Yes
No
Division 2 – Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing lots making up the premises?
9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
Subdivision (complete 10)) Dividing land into parts by agreement (complete 11))
Boundary realignment (complete 12)) Creating or changing an easement giving access to a lot
from a constructed road (complete 13))
10) Subdivision
10.1) For this development, how many lots are being created and what is the intended use of those lots:
Page 4
DA Form 1 – Development application details
Version 1.3— 28 September 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.