Council archive · source document
Financial Performance Report – Nov 2024 · Financial Performance Report
GENERAL COMMITTEE MEETING 16 DECEMBER 2024
8.1 FINANCIAL PERFORMANCE REPORT – NOV 2024
Author Financial Services Manager , Pauline Coles
Financial Services | Corporate Services Department
Index ECM/ Subject / 22.09 – Monthly Financial Performance Report
Attachments 1. Attachment 1 Statement of Income and Expenditure - Nov 2024
2. Attachment 2 Statement of Financial Position - Nov 2024
3. Attachment 3 Statement of Cashflows - Nov 2024
4. Attachment 4 Key Materials & Services Expenditure - Nov 2024
EXECUTIVE SUMMARY
Year-to-date (YTD) performance against current budget as at 30 November 2024 is positive with
operating revenues outperforming forecast and operating expenditure under forecast YTD.
Capital revenues are above forecast with capital expenditure behind of forecast due to delays
and rescheduled timing of project delivery.
YTD Financial Performance Summary
Budget Actual Variance Variance
Status
$m $m $m %
Operating Revenue $67.5 $69.8 $2.3 3.4% On Track
Operating Expense $56.1 $55.8 $0.3 0.6% On Track
Operating Position $11.4 $14.0 $2.6
Capital Revenue $20.0 $24.0 $4.0 20.0% On Track
Capital Expenditure* $61.2 $35.5 $25.7 42.0% Behind Budget
* Reflects constructed assets and intangibles only (excludes contributed assets).
The $2.6 million full year operating surplus comprises $1.7 million general operating surplus
from activities that are funded through Council’s general rate, regulatory fees and sales of goods
and services; as well an additional $0.1 million from holiday park operations and $0.8 million
from waste operations. Any unspent levy and separate charge funds are constrained in reserve
for future use where they are not fully utilised in a given year.
Budget Actual Variance
Item YTD YTD YTD
$m $m $m
General business operating position (unconstrained funds) $7.5 $9.3 $1.7
Commercial operations (constrained funds) * $2.9 $3.8 $0.9
Unspent levies (constrained funds) $0.9 $0.9 $0.0
Total Council Operating Position $11.4 $14.0 $2.6
* Includes Waste and Holiday Park operations as shown in the table below
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 13 pages
Page 2
GENERAL COMMITTEE MEETING 16 DECEMBER 2024
Council elects to apply National Competition Policy (NCP) reforms to its Waste Management and
Holiday Parks which provides greater transparency and assists with removing anti-competitive
conduct and ensures the best allocation of Councils limited resources. A summary of the YTD
operational performance of these business activities are outlined below.
Waste Operations Holiday Parks
Budget Actual Variance Budget Actual Variance
YTD YTD YTD YTD YTD YTD
$m $m $m $m $m $m
Revenue 11.9 12.4 0.5 1.7 1.9 0.2
Expenditure 9.3 9.0 0.3 1.3 1.4 (0.1)
Net Operating Position 2.6 3.4 0.8 0.4 0.5 0.1
Financial statements including Statement of Income & Expenditure, Statement of Financial Position
(balance sheet), and Statement of Cash Flows are included as attachments for information for
Council.
Figure 1: Actual Performance Compared to Budget
Council’s performance against key measures of financial sustainability has been calculated as at
November 2024. These statutory indicators enable the reader to assess Council’s success in
managing its budget, cash and debt as well as undertaking sustainable asset management. The
table below contains a snapshot of a number of key measures, with full detail included in the report.
YTD Measures of Financial Sustainability
Current
Target Actual YTD Status
Budget
Operating Surplus Ratio 0-10% -0.1% 20.1% On Track
Net Financial Liabilities Ratio <60% -3.2% -41.7% On Track
Cash Cover Ratio 3 months 9.4 months 10.6 months On Track
Asset Sustainability Ratio > 90% 136.7% 28.8% Behind Budget
RECOMMENDATION
That Council note the report by the Financial Services Manager to the General Committee
Meeting dated 16 December 2024 outlining the November 2024 year to date financial
performance against budget, including changes to the financial performance report with the
inclusion of key financial sustainability indicators.
Page 3
GENERAL COMMITTEE MEETING 16 DECEMBER 2024
REPORT
Operating Revenue (YTD Benchmark 41.7%)
Council has received 49.9% ($69.8 million) of its operating revenue budget ($139.9 million).
Commentary on each revenue category is provided below.
Category Summary Comments
Rates and $47.2 million (50.0%) • Waste utility charges $90.0k above YTD budget
Levies of the annual budget of (50.3% or $8.5 million of $16.9 million annual
$94.4 million has been budget earned)
earned • General rate (net of discounts) $27.3k above
YTD budget (49.9% or $35.7 million of $71.4
million annual budget earned)
Fees and $5.2 million (47.5%) of • Building & Plumbing Compliance $160.7k above
Charges the annual budget of budget (45.5% or $1.2 million of $2.6 million
$10.9 million has been annual budget earned)
earned • Waste $49.8k above budget (112.1% or $63.8k
of $56.9k annual budget earned)
• Cemeteries $25.5k above budget (48.9% or
$171.3k of $349.8k annual budget earned)
• Development Assessment $189.1k below
budget (46.6% or $1.7 million of $3.6 million
annual budget earned)
• Local Laws $147.6k below budget (52.9% or
$1.7 million of $2.5 million annual budget earned)
Sale of Goods $7.0 million (45.1%) of • Waste $221.4k above budget (42.9% or $3.3
and Services the annual budget of million of $7.7 million annual budget earned)
$15.6 million has been • Holiday Park revenue $200.1k above budget
earned (48.2% or $1.9 million of $4.0 million annual
budget earned). Any revenue upside will be
generally offset by a corresponding increase in
associated operating costs.
• Sports facility revenue $126.0k above budget
(48.1% or $1.4 million of $2.9 million annual
budget earned)
Interest $2.8 million (88.6%) of • Interest revenues have continued to track above
Received the $3.1 million annual budget with investment in higher yielding term
budget has been deposits maximising the return on surplus cash
earned holdings. Cash holdings are higher compared to
previous years due to the advanced payment of
QRA disaster capital works grants and delays in
the delivery of the capital works program.
Other Revenue $1.5 million (47.0%) of • Plant recharge revenue is $51.3k above budget
the $3.3 million due to internal plant being utilised for the deliver
annual budget has of disaster funded capital projects.
been earned • Recoupment of Waste Bin (SULO) purchases
$40.2k above budget (63.9% or $66.0k of
$103.3k annual budget earned.
• Royalty income from landfill gas $22.4k above
budget (88.5% or $51.5k of $58.1k annual
budget earned)
Page 4
GENERAL COMMITTEE MEETING 16 DECEMBER 2024
Category Summary Comments
Operating $3.5 million (53.1%) of • Operating Grants and subsidies are in line with
Grants, the $6.6 million budget expectations at this stage of the year.
Subsidies annual budget has YTD variance relates to $65k Floating Land
been received grant, $75k for Disaster Recovery & Resilience
Officer funding program, $90k for Regional
Enablers program and $98k final payment
relating to Black Summer Bushfire Funding for
the living tech fire lab.
• $1.4 million of the FY 2025 financial assistance
grant allocation was received in July 2024. This
is a change from the previous approach of
prepaying part or all of the grant in the preceding
year. This prepayment approach had been
consistent over the past 7 years.
• Council has received notification of the approved
FY 2024/25 financial assistance grant allocation
which is less than budgeted. As such there is
potential for this to impact the FY 24/25 operating
position if payment of future years allocations are
not paid in the preceding year.
Unitywater On track • Unitywater distributions are fixed each year so
Distributions there is limited budget variance risk
Figure 2: Operating Revenue Position by Type (Excluding Rates)
Operating Expenditure (YTD Benchmark 41.7%)
Actual operating expenditure is currently 39.8% ($55.8 million) of the full year budget ($140.1
million). Detailed commentary for each expenditure category is provided below.
Category Summary Comments
Employee Costs $21.7 million (41.4%) of the • Expenditure for permanent staff salaries
annual budget of $52.6 and wages underspent ($717.0k) due to
million has been expended position vacancies and recoupment of YTD
vacancy dividend. This underspend is also
partially offset by additional spend on casual
staff and external labour hire ($687.6k).
• Training costs are above budget (52.5% or
$202.6k of $386.1k annual budget spent)
Page 5
GENERAL COMMITTEE MEETING 16 DECEMBER 2024
Category Summary Comments
Materials and $23.9 million (38.4%) of the • Holiday Parks $255.1k above budget
Services $62.4 million annual budget (38.7% or $918.1k of $2.4 million annual
has been expended. budget spent)
• Civil Operations $36.0k above budget
(31.7% or $3.0 million of $9.5 million annual
budget spent)
• Fleet $32.8k above budget (40.2% or
$646.3k of $1.6 million annual budget
spent)
• Waste Management $380.6k below budget
(36.5% or $5.4 million of $14.7 million
annual budget spent)
• Arts & Culture $67.7k below budget (36.9%
or $967.4k of $2.6 million annual budget
spent)
• Development Assessment below budget
(38.3% or $502.7k of a $1.3 million annual
budget spent)
• Canals & Waterways $41.8k below budget
(34.5% or $119.3k of a $346.2k annual
budget spent)
• ICT $40.5k below budget (39.9% or $2.1
million of a $5.3 million annual budget
spent)
• Holiday Parks $153.5k above budget
(47.5% or $1.1 million of $2.4 million annual
budget spent) - offset by additional revenue
• Civil Operations $134.9k above budget
(41.0% or $3.9 million of $9.5 million annual
budget spent)
• Fleet $72.6k above budget (50.2% or
$806.4k of $1.6 million annual budget
spent)
Finance Costs Currently on track • Whilst existing loan borrowings are set with
fixed interest rates, any further RBA rate
rises will impact finance costs on new loan
borrowings. YTD underspend also relates
to the timing of drawdown of forecast
borrowings for FY 2025.
Depreciation Currently on track Nil
Other Expenses Currently on track Nil
Figure 3: Operating Expenditure Position by Type
Page 6
GENERAL COMMITTEE MEETING 16 DECEMBER 2024
Tourism and Economic Development Investment Summary
Council resolved to report on a monthly basis, investment details for tourism and economic
development. Expenditure at 30 November 2024 is outlined below:
Expenditure YTD Budget YTD Actual Variance
$’000 $’000 $’000
Tourism Noosa Funding Agreement $1,260.0 $1,260.0 -
Economic Development $427.6 $424.1 $3.5
Total $1,687.6 $1,684.1 $3.5
Tourism and economic development activity is funded through the general rates. The first instalment
payable under the Tourism Noosa agreement for the 2024-25 financial year was made in July 2024,
with the second instalment due in January 2025. The Tourism Noosa agreement is due for renewal
in June 2025.
• Employee Costs are $5.3k below budget (41.1% or $264.9k of $644.4k annual budget spent)
• Materials & Services are in line with budget at this stage of the year.
Capital Revenue
Year to date Capital revenue of $24.0 million received comprises cash contributions from
developers ($0.6m) and capital grants ($23.4 million). Note that the timing of capital grant
receipts are generally dependent on the timing of grant conditions and also capital delivery
performance, and that the timing of the receipt of developer contributions (both cash and
contributed) is unpredictable.
Grants and subsidies are higher than prior years due to the receipt of funding from the
Queensland Reconstruction Authority for reconstruction works relating to the Black Mountain
landslip and several other flood impacted sites, which are currently under construction.
Figure 6: Capital Revenue by Type
Page 7
GENERAL COMMITTEE MEETING 16 DECEMBER 2024 Capital Program Actual capital expenditure (excluding commitments and disaster projects) is $10.7 million (YTD budget $20.3 million). Expenditure on disaster projects (excluding commitments) is $24.7 million (YTD budget $40.9 million). Detailed discussion of progress in the delivery of the capital works program is provided through a separate quarterly report by the infrastructure team. Figure 7: Capital Program Delivery Performance Cash Management and Investment Performance Total cash on hand at the end of November was $101.3 million. Included in this balance are funds held in trust and for restricted purposes (e.g. unexpended levy and grant funds), prepaid grants including the financial assistance grant, QRA disaster funding and other capital works grants, prepayment of Waste Levy subsidy (3 years), and unspent monies committed for funding capital projects which are underway and will continue during the financial year. The following pie charts present the mix of cash held at November 2024 by agency (graph on the left) and by credit risk rating (graph on the right). All funds have been invested in accordance with the Investment Policy and in consideration of the principles of ethical investment, preservation of capital, return on investment and counterparty thresholds. Figure 8: Closing Cash Held by Agency and Credit Rating
Page 8
GENERAL COMMITTEE MEETING 16 DECEMBER 2024
The following chart monitors the 12 month trend on total cash and the agencies invested. To
maximise the return on in its cash holdings Council has invested $30.5 million in higher yielding term
deposits. These investments were made in line with Council’s Investment of Surplus Funds policy.
Figure 9: 12 Month Trend of Cash Invested by Agency
Quarterly Supplementary Information - Cash Components
An update detailing the composition of Council’s cash reserves is provided quarterly. Council’s
cash balance comprises a number of components – restricted cash (reserves), committed cash,
financial sustainability requirements and unrestricted cash. These are outlined below.
Restricted Cash - In accordance with Council’s Management of Restricted Cash Policy, funds
are set aside and restricted for a specific purpose. This can be either to meet regulatory
requirements, allocate against specific future projects and activities, and to ensure sufficient
working capital to meet current and long term financial obligations.
Committed Cash - A portion of cash reserves are committed to undertake current year capital
works. At the start of the financial year, this commitment will be increased for any unfinished
capital works from previous year which are carried over as part of the budget review process to
ensure the projects can be completed.
Sustainability Requirement – Cash expense cover is a key statutory indicator to measure
liquidity, ensure going concern and is a key measure considered in Council achieving its current
credit rating (Sound with a Neutral Outlook) to ensure borrowing capacity. Cash expense cover
calculates how long Council can continue to pay its day-to-day expenses without needing to
seek borrowings or other external funding. A target minimum of three month’s cash cover is to
be held in any given financial year to minimise financial risk.
Unrestricted Cash – These are funds where there is no regulatory, policy or budgetary
commitment to retain funds for specific purposes. These funds can be separated into the
following:
• Working Capital – The cycle of revenue received twice yearly through rates that is held
in the bank and spent over the following six months on operations and capital.
Page 9
GENERAL COMMITTEE MEETING 16 DECEMBER 2024
• Long Term Surplus – Uncommitted cash set aside to fund the 10-year capital works
program.
Overall, Council’s $101.3 million total cash balance compromises:
• $44.9 million (44.3%) in restricted cash. This includes unspent levy funds, advance grant
& subsidy payments, developer contributions, natural disaster provision and future landfill
rehabilitation provision
• $11.3 million (11.2%) committed for the delivery of capital works projects
• $28.8 million ($28.4%) to meet sustainability requirements, equivalent to 3 months cash
cover.
• $9.4 million (9.3%) in working capital to pay for operations through to the next rating cycle
• $6.9 million (6.8%) in unrestricted free cash, which is the cash available to fund emergent
or new capital works projects. There is no funding to replenish this unless Council
generates a surplus operating position.
Figure 10: Allocation of Cash Balances
Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no significant emerging risks regarding
performance identified at this stage, however the delay in the delivery of the capital program
may impact Council’s asset sustainability and renewal targets.
Page 10
GENERAL COMMITTEE MEETING 16 DECEMBER 2024
Category Comments
Operating Surplus Ratio • Intent: Identifies the extent
to which revenues cover
operational expenses, to
ensure community equity is
not degraded
• Target: Greater than 0%
• Result: 20.1%
• Comment: The slowly
declining ratio reflects the
levying of 50% of rates in
July and gradual utilisation of
these monies as expenditure
occurs on operations through
to the next rating cycle in
January 2025.
Cash Expense Cover • Intent: Indicates how long
council can continue paying
its day-to-day expenses from
cash at bank without needing
additional cash flows
• Target: > 3 months
• Result: 10.6 months
• Comment: Cash cover
remains above target, while
business as usual
expenditure through to 30
June 2025 will degrade
Council’s cash holdings,
albeit not below the target
range of 3 – 6 months.
Cash balances include funding
for capital programs, unspent
grant monies paid in advance,
Waste Levy subsidy
prepayments and QRA advance
payments for disaster projects
which are restricted for specific
purposes and inflate the ratio.
Asset Sustainability Ratio • Intent: Measures the extent
to which assets are being
replaced as their condition
degrades to ensure service
potential is maintained
• Target: 80% of depreciation
budget spent on renewals
annually
• Result: 28.8% achieved,
however below forecast
result due to project delays
and scheduling.
• Comment: The ratio will
progressively increases each
month as expenditure on
renewals occurs as part of
Page 11
GENERAL COMMITTEE MEETING 16 DECEMBER 2024
Category Comments
the capital works program.
For transparency QRA
disaster projects have been
excluded from the ratio
calculations. Should capital
works continue to fall
forecast for the remainder of
the year this may impact the
achievement of Council’s
asset sustainability and
renewal targets
Net Financial Liabilities Ratio • Intent: Outlines the level that
net Council debt can be
serviced by operating
revenues. A ratio below zero
implies that liabilities are less
than cash (and other current
assets) and there is
adequate borrowing capacity
available if needed.
• Target: less than 60%
• Result: -41.7%
• Comment: Council has low
debt levels and strong cash
holdings. The first bi-annual
rates run in July also inflates
the YTD actual outcome.
Investment Return • Intent: Ensure appropriate
return on investment yield for
cash at bank.
• Target: 0.25% above current
Bloomberg commonwealth
10-year bond rate yield
(4.44%)
• Result: 5.57%
• Comment: With higher-
than-normal cash
balances due to the
advance payment of
grants and subsidies and
a delayed capital program,
combined with bond rates
remaining steady, Council
has invested surplus cash
in higher yielding term
deposits to maximise
returns. Council’s
investment returns remain
above target.
Page 12
GENERAL COMMITTEE MEETING 16 DECEMBER 2024
Category Comments
Rates in Arrears • Intent: Ensuring that the
amount of unpaid rates
remains sustainable and
does not negatively impact
cash flows
• Target: 5% industry
benchmark
• Result: 6.6%
• Comment: Rates arrears
continue to decline from the
high point in the cycle with
payments coming due in
August. Reminder notices
have been issued, and
arrears will continue to
stabilise through to January
as they are collected, and
payment arrangements
implemented.
Link to Corporate Plan
Theme No. 5. - Excellence
This theme focuses on customer experience, financial sustainability, innovation and technology,
levels of service, governance, our employees and volunteers, funding streams and asset
management practices.
Objective 5.2 - Continue to deliver a financially sustainable Council that has the resources now and
into the future to achieve its strategic objectives. This will be supported through the introduction of
enhanced sustainability reporting and performance indicators, as well as ESG (environment social
and governance) accounting practices as guided by statutory requirements.
Previous Council Consideration
Nil
Finance
As above
Risk & Opportunities
Council’s risk register identifies a number of risks that could impact on its ongoing financial
sustainability. In order to manage and mitigate these risks Council uses various tools which include
monthly ongoing financial reporting to identify and address emerging issues, conservative budgeting,
compliance with the Financial Sustainability Policy, regular budget reviews, effective liquidity
Page 13
GENERAL COMMITTEE MEETING 16 DECEMBER 2024
management to ensure sufficient fiscal flexibility, as well as adhering to the Reserves and Restricted
Cash policy which requires that Council maintains both a disaster management reserve and a
minimum 3 months cash cover to fund emergent matters.
Some examples of potential risks that may impact on Council’s operational performance, capital
program delivery, cashflow and cash reserves include:
• Substantial damage to or failure of Council infrastructure due to natural disaster or other
emergent issue that may require significant unplanned investment;
• An extended closure of Council facilities impacting operational revenues;
• A prolonged IT system failure affecting Council’s ability to deliver services or issue rates
notices;
• Economic conditions affecting ratepayers’ ability to pay rates;
• Market driven increases in construction and operational costs significantly above estimates;
• Labour and material shortages and delays.
• Strategies, plans and projects deliverables that have not been accurately costed
Human Rights
Human Rights Compatibility Statement
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in a
manner that is compatible with human rights. This report should be read in conjunction with Council’s
Human Rights Policy.
Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.
Departments consulted:
Office of the CEO, Mayor & Community Services Corporate Services
Councillors
Mayor & Councillors X Director X Director
X Chief Executive Officer Community Development X Financial Services
Executive Officers Sport & Active Lifestyles Fleet
Community Engagement Arts & Culture Revenue Services
People & Culture Community Connection ICT
Governance Customer Experience Procurement
Commercial Property
Strategy & Environment Development & Regulation Infrastructure Services
X Director X Director X Director
Page 14
GENERAL COMMITTEE MEETING 16 DECEMBER 2024
Strategic Land Use Planning Development Assessment Infrastructure Planning, Design
and Delivery
Economic Development & Local Laws Civil and Asset operations
Destination Management
Environmental Services Environmental Health Waste
Innovation & Digital Hub Building & Plumbing Building & Facilities
Property / Permits Disaster Management
Used in these records
FINANCIAL PERFORMANCE REPORT – NOV 2024 · FINANCIAL PERFORMANCE REPORTReportsMeeting 716 · read item & discussion ↗
About this file
- File size
- 629 KB (small file)
- File type
No other editions are linked here.