Original source · versioned page text
2021-03-09 P&E Agenda - Item 5 - Attachment 1 - Noosa Trail Masterplan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Strategy Action Timeframe Partners /
Short: 1-2 yrs Stakeholders
Medium: 3-5 yrs
Long: 5-10 yrs
Golden Triangle focus > Wooroi/ • Investigate and identify detailed corridors Short-Medium • Noosa Council
Tewantin > Pomona > Ringtail/ and mapping for best trail alignments and • QLD Parks and Wildlife
Boreen Point supporting infrastructure design. Service
Primary focus for redevelopment • Confirm trail rationalisations and design/ • SEQ Water
opportunities presents within the build prioritisations, with planning for • Noosa Parks
so-called ‘Golden Triangle’ area regeneration and realignment timeframes. Association
bounded by Wooroi in the east, • Tourism Noosa
• Work with land managers / stakeholders
Pomona and Cooran in the west • Noosa & District
to ensure alignments meet environmental,
and the northern tip of Ringtail State Landcare
cultural, sustainability and user-demand
Forest in the north (with linkage
guidelines.
through to Boreen Point).
• Create a Golden Triangle Zone Trail
Whilst there are network trails to the
Masterplan – concurrent with an overarching
north towards Kin Kin, it is suggested
trail alignment Masterplan for region – to
that focusing on the Golden Triangle
inform permissions and implementation
area is best strategy due to proximity
process and dictate trail build process.
to Noosa Heads, concentration of
trail alignments both current and
potential within the zone, and best
opportunities for consistency of
experience and linkages.
Trails around Kin Kin should
be rationalised with a priority
on identifying select (and best)
equestrian loops and ‘gravel grind’ /
road cycling tour route designations.
Tewantin National Park / • Evaluate current land manager plans for Short-Medium • Noosa Council
Tinbeerwah land parcel, establishing and continuing • QLD Parks and Wildlife
dialogue with QPWS. Service
With best proximity to Noosa Heads,
Tewantin and Wooroi, along with • Identify preferred trail design and • Trailblazers
excellent under-utilised geographical alignments inclusive realignments, upgrades Mountainbike Club
features, Tewantin National Park and new trail build, that will service identified • Tourism Noosa
requires a trail plan focusing on markets for that zone. Inclusive of critical link
mountain bike specific trails with to Wooroi MTB trails.
some additional walk and run
• Work with land managers to incorporate trail
product development. Requires
plan into ongoing land management and
link solution to join with existing
development plans.
Wooroi trail network in the south.
Leverages off the Tinbeerwah • Work with local trail user groups to develop
Lookout, a feature target for ride, run volunteer maintenance ownership /
and walk. Single-use mountain bike modelling for maintenance.
trails to come off the north-south
ridge leading away to the north of • Develop ‘brand story’ for Tewantin Network
the lookout, with pedestrian walk/ as a cohesive chapter of a broader Noosa
run singletrack creating loop links Trail Network rebranding.
to the west into Lake Macdonald
(proposed) trailhead / recreation
area.
NOOSA TRAIL MASTERPLAN | APRIL 2020 49
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.