Original source · versioned page text
2021-03-09 P&E Agenda - Item 5 - Attachment 1 - Noosa Trail Masterplan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Strategy Action Timeframe Partners /
Short: 1-2 yrs Stakeholders
Medium: 3-5 yrs
Long: 5-10 yrs
Woondum Forest Reserve • Initiate feasibility into creation of a stand- Long • QLD Parks and Wildlife
alone mountain bike network within Service
Long-term aim to advocate for and
Woondum Forest Reserve with careful • Noosa Council
establish high quality stand-alone
consideration of trailhead / parking location, • Gympie Regional
trail network within Woondum Forest
residential impacts, trail design / plan. Council
Reserve, utilising ridgeline and
elevation for first class MTB trails • Tourism Noosa
with trailhead at Johnstons Lookout.
Consideration given to a walk/run
route addition. Loop back trails and/
or consideration given to gravity
drop trail to Cooran terminus to
link with public transport (train and/
or trails to Pomona). Note Gympie
to the north-west has existing
trail product in Victory Heights,
Woondum creating a stepping-stone
trail destination to/from Gympie,
back into Noosa.
Alternative low-input, • Curation and promotion of a select network Long • Noosa Council
high-yield cycling – of ‘gravel grind’ and back country touring • Gympie Regional
gravel grind/back country routes that leverage the high concentration Council
(including Kin Kin to Gympie) of high quality, significant elevation • Tourism Noosa
gravel road routes available in the Noosa
• Event operators
hinterland, matched to key focal points
(lookouts, townships).
• Tour operators
• Support service
• Develop guide / collateral to promote. providers/retailers
• Sporting / recreation
clubs (MTB, horse, trail
run)
Trail signage / interpretation • Audit trail signage for location, condition and Ongoing • Noosa Council
suitability. • QLD Parks and Wildlife
Complete revision of Noosa Trail
Service
Network branding and on-trail • Devise trail signage (directional and
signage, with high priority allocated interpretive) masterplan reflecting new / • Kabi Kabi
to in-use trails (i.e. Wooroi) and redeveloped / realigned trail network. • Tourism Noosa
those trails identified for priority
• Commission brand redevelopment for
development.
Noosa Trail Network to reflect across all
assets (signage, interpretation, marketing,
information on and offline).
Stage One Works Cost Estimate document by TRC Tourism provided on request to Tourism Noosa
The development of this plan could not have been
done without the enormous support of the over 40 plus
stakeholders who have been consulted in this process.
There has never been a better time for the ideas
in this plan to be developed. It will support Noosa
as a truly sustainable green destination and harnesses the
natural beauty of the hinterland, encouraging health and
wellbeing for our community and for our visitors.
NOOSA TRAIL MASTERPLAN | APRIL 2020 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.