                   REINFORCED CONCRETE                                                                                                                                                            23. FABRIC LAPS:                                                                                             CONSTRUCTION INSPECTIONS                                                                         EARTHWORKS
                                                                                                                                                                                                                                   FABRIC LAP                                                                                                                                                                   1. LEVEL 1 REPORT BY THE GITA
                                                                                                                                                                                                                                                                                                               THE CONTRACTOR IS TO CONFIRM APPLICABLE NOTIFICATION POINTS [NOTIFY] AND INSPECTION
                   GENERAL                                                                                                                                                                                                                                                                                     REQUIREMENTS [INSPECT] WITH THE CERTIFYING ENGINEER PRIOR TO UNDERTAKING WORKS
                   1.  CARRY OUT ALL CONCRETE WORK IN ACCORDANCE WITH AS 3600 AND THE SPECIFICATION.                                                                                                                                                                               25mm                                                                                                                         STORMWATER
                                                                                                                                                                                                                                                                                                               WHERE CERTIFICATION OF THOSE WORKS. THESE WORKS MAY INCLUDE BUT ARE NOT LIMITED                  1. BEDDING/DRAINAGE MATERIAL DOCKETS & PSD
                       KEEP A COPY OF THE DOCUMENTS ON SITE.
                                                                                                                                                                                                  24. FABRIC TO EXTEND 70 WITH A CROSSWIRE ONTO WALLS UNLESS NOTED OTHERWISE.                                  TO:                                                                                              2. BACKFILL MATERIAL DOCKETS
                   2. VERIFY ALL SETTING OUT DIMENSIONS WITH THE SUPERINTENDANT AND/OR THE
                                                                                                                                                                                                                                                                                                               1. PRESTART MEETING [INSPECT]                                                                    3. COMPACTION TESTING FOR GRAVEL BACKFILL
                       SURVEYOR.
                   3. DO NOT OBTAIN DIMENSIONS BY SCALING THE DRAWINGS.                                                                                                                          DANLEY DOWEL JOINT                                                                                            2. VERIFICATION/POTHOLE OF EXISTING SERVICES AT CONNECTIONS/CROSSINGS [NOTIFY]                   4. MANHOLE CONCRETE DOCKETS & COMPRESSIVE STRENGTH TESTS
                                                                                                                                                                                                                                                                                                               3. ESTABLISHMENT OF EROSION AND SEDIMENT CONTROLS [INSPECT]                                      5. LEAN MIX DOCKETS
                   CONCRETE
                                                                                                                                                                                                 1.       WHERE NOMINATED THE CONTRACTOR IS TO ALLOW FOR ALL COMPONENTS OF DANLEY                              4. ENCOUNTERING UNSUITABLE MATERIAL OR ROCK [NOTIFY]                                             6. MATERIAL CERTIFICATES FOR ASPRO, PIPES AND PRE-CAST PITS
                   4. ALL WORKMANSHIP AND MATERIALS SHALL COMPLY WITH AS 3600 CURRENT EDITIONS WITH
                                                                                                                                                                                                          DOWEL JOINT SYSTEM INCLUDING TEMPLATES & PEGGING TO ENSURE THAT ALL DOWEL                            5. COMPLETION OF EARTHWORKS [INSPECT]                                                            7.  AS CONSTRUCTED SURVEY CONFIRMING STORMWATER ASSET INVERT LEVELS, PIPE SIZES,
                       AMENDMENTS, EXCEPT WHERE VARIED BY THE CONTRACT DOCUMENTS.
                                                                                                                                                                                                          BARS REMAIN IN THE CORRECT ALIGNMENT & POSITION REFER DETAILS.                                       6. COMMENCEMENT OF EXCAVATION FOR CIVIL SERVICE TRENCHES [NOTIFY]                                    STRUCTURE SIZES AND STRUCTURE SURFACE LEVELS
                   5. CONCRETE CHARACTERISTICS:
                                                                                                                                                                                                                                                                                                               7. PIPE LAYING AND JOINTING PRIOR TO BACKFILL [INSPECT]                                          8. AS CONSTRUCTED SURVEY TO BE PROVIDED IS GDA2020 COORDINATES IN DWG FORMAT
                                           ELEMENT COMPRESSIVE STRENGTH SLUMP MAX AGG                                                                                                                                                                                                                          8. CONCRETE BASE AND EACH LIFT OF SEWER AND STORMWATER MAINTENANCE                                   AND IN REQUIRED ADAC FORMAT
                                                     F'c - 28 DAYS (MPa) (mm) SIZE (mm)
                                                                                                                                                                                                 CONCRETE PAVEMENT JOINT                                                                                           STRUCTURES [INSPECT]                                                                         9. STORMWATER CCTV (VIDEO AND REPORT)
                             ALL KERBS, PITS ETC              20          80     20                                                                                                                                                                                                                            9. PREPARATION OF SUBGRADE TO PAVEMENT AND PROOF ROLL (FLEXIBLE AND RIGID)
                                                                                                                                                                                                 1.       WHERE NOMINATED, JOINTS TO BE SAWN AS SOON AS CONCRETE HAS HARDENED
                             FOOTPATH                         25          80     20                                                                                                                                                                                                                                [INSPECT]                                                                                    PROPRIETARY STORMWATER QUALITY
                                                                                                                                                                                                          SUFFICIENTLY THAT IT WILL NOT BE DAMAGED BY SAWING. IF AN UNPLANNED CRACK
                             CARPARK PAVEMENT                 32          65     20                                                                                                                                                                                                                            10. PLACING OF GRAVEL LOWER SUB-BASE PAVEMENT LAYER AND PROOFROLL (FLEXIBLE)                     1.  SIGN OFF FOR THE INSTALLATION AND COMMISSIONING OF THE PROPRIETARY DEVICE
                                                                                                                                                                                                          OCCURS THE CONTRACTOR SHALL REPLACE WHOLE SLABS EITHER SIDE OF THE
                             OSD TANK BASE AND LID            40          80     20                                                                                                                                                                                                                                [INSPECT]                                                                                        SYSTEMS BY THE PROPRIETOR.
                                                                                                                                                                                                          UNPLANNED CRACK, UNLESS DIRECTED OTHERWISE.
                   6.   NO 'BRECCIA' TYPE AGGREGATE IS TO BE USED.                                                                                                                                                                                                                                             11. PLACING OF GRAVEL SUB-BASE PAVEMENT LAYER AND PROOFROLL (FLEXIBLE) [INSPECT]
                                                                                                                                                                                                  2.      a) PROVIDE JOINTS AS DETAILED
                   7.   CEMENT TO BE TYPE SL TO AS 3972 U.N.O. MAX CONCRETE SHRINKAGE TO BE 600 MICRON                                                                                                                                                                                                         12. PLACEMENT OF KERB [NOTIFY]                                                                   SEWER AND WATER (AUTHORITY ASSET)
                                                                                                                                                                                                          b) ALL LONGITUDINAL JOINTS SHALL BE FORMED AND INCLUDE TIE BARS OR DIAMOND
                        TO AS1012.                                                                                                                                                                                                                                                                             13. PLACING OF GRAVEL BASE PAVEMENT LAYER AND PROOFROLL (PRE-SEAL) (FLEXIBLE)                    1. BEDDING/DRAINAGE MATERIAL DOCKETS & PSD
                                                                                                                                                                                                             DOWELS AS SPECIFIED. ALL TRANSVERSE CONSTRUCTION JOINTS SHALL BE FORMED
                   8. NO ADMIXTURES ARE TO BE USED WITHOUT THE APPROVAL OF THE ENGINEERS.                                                                                                                                                                                                                          [INSPECT]                                                                                    2. BACKFILL MATERIAL DOCKETS
                                                                                                                                                                                                             AND INCLUDE PLATES OR DIAMOND DOWELS AS SPECIFIED.
                   9. A VIBRATOR IS TO BE USED FOR THE COMPACTION OF ALL CONCRETE.                                                                                                                                                                                                                             14. PRIME AND SEAL INSTALLATION PRIOR TO AC [NOTIFY]                                             3. COMPACTION TESTING FOR GRAVEL BACKFILL
                                                                                                                                                                                                          c) UNO BOND BREAKER TO BE PROPRIETARY DANLEY PLATE AND DIAMOND DOWEL
                   10. ALL CONCRETE PLACEMENT TO UTILISE ALIPHATIC ALCOHOL APPLIED TO THE CONCRETE                                                                                                                                                                                                             15. LAYING OF ASPHALTIC CONCRETE [INSPECT]                                                       4. MANHOLE CONCRETE DOCKETS & COMPRESSIVE STRENGTH TESTS
                                                                                                                                                                                                             COVERS.
                        AFTER THE INITIAL SCREED. CONCRETE SHALL BE CURED IN ACCORDANCE WITH AS3600                                                                                                                                                                                                            16. PLACING OF GRAVEL BASE PAVEMENT LAYER AND PROOFROLL (RIGID) [INSPECT]                        5. LEAN MIX DOCKETS WHERE REQUIRED
                                                                                                                                                                                                  3.      DOWELS, PLATES AND TIE BARS SHALL BE:
                        FOR A MINIMUM OF 7DAYS AFTER POURING, UTILISING AN APPROVED, NON-OIL BASED                                                                                                                                                                                                             17. CONCRETE STEEL & STRUCTURAL INSPECTIONS [INSPECT]                                            6. BACTERIAL AND CHLORINATION TESTING FOR WATER
                                                                                                                                                                                                          · STRAIGHT
                        CURING COMPOUND OR THE COVERING OF THE ENTIRE SLAB WITH A CLEAR PLASTIC                                                                                                                                                                                                                18. LIVE CONNECTIONS - CONNECTION TO AUTHORITY ASSETS (WATER, SEWER, STORMWATER)                 7. PRESSURE TESTING RESULTS FOR WATER
                                                                                                                                                                                                          · TO LENGTH SPECIFIED
                        SHEET.                                                                                                                                                                                                                                                                                     [INSPECT]                                                                                    8. SEWER VAC TEST FOR BOTH PIPELINES AND STRUCTURES.
                                                                                                                                                                                                          · CLEAN AND FREE FROM MILL SCALE, RUST AND OIL
                   11. ALL CONCRETE SHALL BE SUBJECT TO PROJECT CONTROL SAMPLE AND TESTING TO AS                                                                                                                                                                                                               19. PRE-ON MAINTENANCE INSPECTION WITH SERVICES AUTHORITY [INSPECT]                              9. SEWER PIPE OVALITY TESTING
                                                                                                                                                                                                          · SAWN TO LENGTH NOT CROPPED
                        3600.                                                                                                                                                                                                                                                                                  20. DEFECTS INSPECTION [INSPECT]                                                                 10. MATERIAL CERTIFICATES FOR ASPRO, PIPES AND PRE-CAST PITS
                                                                                                                                                                                                          · HOT DIPPED GALVANISED AFTER SAWING TO LENGTH
                   12. THE CONTRACTOR MAY ADD AN APPROVED SUPERPLASTICISING ADMIXTURE TO INCREASE                                                                                                                                                                                                              21. ON MAINTENANCE INSPECTIONS [INSPECT]                                                         11. AS CONSTRUCTED SURVEY CONFIRMING SEWER ASSET INVERT LEVELS, PIPE SIZES,
                                                                                                                                                                                                  4.      DIMENSIONS OF SEALANT RESERVOIR DEPENDANT ON THE SEALANT TYPE ADOPTED.
                        SLUMP OF PAVEMENT CONCRETE TO NOT MORE THAN 100mm. QUALITY AND MIXING                                                                                                                                                                                                                  22. OFF MAINTENANCE INSPECTIONS WITH SERVICES AUTHORITY WHERE REQUIRED [INSPECT]                     STRUCTURE SIZES AND STRUCTURE SURFACE LEVELS
                                                                                                                                                                                                          ENGINEERS APPROVAL TO BE OBTAINED FOR SEALANT AND RESERVOIR DIMENSIONS AND
                        PROCEDURE TO BE IN ACCORDANCE WITH THE MANUFACTURERS WRITTEN INSTRUCTIONS.                                                                                                                                                                                                             23. OFF MAINTENANCE INSPECTIONS [INSPECT]                                                        12. AS CONSTRUCTED SURVEY CONFIRMING WATER ASSET INVERT LEVELS, PIPE SIZES, BENDS,
                                                                                                                                                                                                          DETAIL PROPOSED BY THE CONTRACTOR. REFER TO DETAILS FOR TYPICAL ARRANGEMENT
                   13. SLIP JOINTS TO BE USED ON ALL LOAD-BEARING MASONRY WALLS. USE 2 LAYERS OF                                                                                                          AND SEALANT.                                                                                                                                                                                              FITTINGS AND HYDRANT AND VALVE SURFACE LEVELS
                        GALVANISED FLAT STEEL WITH GRAPHITE GREASE BETWEEN.                                                                                                                                                                                                                                    THE CONTRACTOR SHALL ALLOW ADEQUATE TIME IN THEIR PROGRAM FOR INSPECTIONS BY THE                 13. AS CONSTRUCTED SURVEY TO BE PROVIDED IS GDA2020 COORDINATES IN DWG FORMAT
                                                                                                                                                                                                  5.      PRIOR TO THE PLACEMENT OF CONCRETE IN THE ADJACENT SLAB, 10mm ABELFLEX WITH
                   FINISHING                                                                                                                                                                                                                                                                                   CERTIFYING ENGINEER AND THE LOCAL AUTHORITY (IF REQUIRED) AT EACH STAGE OF                           AND IN REQUIRED ADAC FORMAT
                                                                                                                                                                                                          RIPOFF STRIP SHALL BE ADHERED TO THE ALREADY CAST AND CLEANED CONCRETE FACE
                   14. THE CONCRETE SHALL BE SCREEDED TO THE REQUIRED CROSS SECTION PROFILE, FREE                                                                                                         USING AN APPROVED WATERPROOF ADHESIVE. ADHESIVE SHALL BE LIBERALLY APPLIED                           CONSTRUCTION.                                                                                    14. SEWER CCTV (VIDEO FOOTAGE AND REPORT)
                        OF DEPRESSIONS AND HIGH AREAS TO SATISFY THE REQUIREMENTS OF AN INITIAL FINISH.                                                                                                   TO THE FULL FACE OF THE CONCRETE SLAB TO BE COVERED BY THE FILLER, AND ON THE                        NOTWITHSTANDING THE REQUIREMENTS FOR NOTICE BY THE LOCAL AUTHORITY, THE
                   15. FINAL FINISHING SHALL COMMENCE ONLY AS SOON AS THE WATER SHEEN HAS LEFT THE                                                                                                        FULL FACE OF THE FILLER TO BE ADHERED.                                                               CERTIFYING ENGINEER SHALL BE GIVEN A MINIMUM OF 3 FULL BUSINESS DAYS' NOTICE OF THE              RETAINING WALLS
                        PAVEMENT SURFACE AND NOT IN ANY AREA WHERE THERE IS FREE SURFACE WATER.                                                                                                   6.      REFER TO EARTHWORKS NOTES FOR PREPARATION OF SUB-BASE AND SUB-GRADE.                                 REQUIRED INSPECTIONS.                                                                            1.  THE RETAINING WALL SYSTEM DESIGN IS TO BE UNDERTAKEN AS PART OF THE
                        REFER ARCHITECTURAL SPECIFICATIONS FOR FINISHES TO SURFACES.                                                                                                                                                                                                                           THE CONTRACTOR SHALL BE DEEMED TO BE FAMILIAR WITH ALL LOCAL AUTHORITY                               OPERATIONAL DESIGN WORKS PHASE (AND TO BE IN ACCORDANCE WITH THE ASSOCIATED
                                                                                                                                                                                                  7.      CONTRACTION, LONGITUDINAL, ISOLATION AND CONSTRUCTION JOINTS SHALL BE LOCATED
                   REINFORCEMENT                                                                                                                                                                          AS SPECIFIED.                                                                                                                                                                                             GEOTECH.
                                                                                                                                                                                                                                                                                                               REQUIREMENTS FOR SUPERVISION AND INSPECTIONS AND MAKE PROVISION FOR THEM IN THEIR
                   16. COVER TO REINFORCEMENT FOR CORROSION PROTECTION SHALL BE AS DETAILED OR AS                                                                                                 8.      SAWCUTTING SHALL COMMENCE AS EARLY AS POSSIBLE UTILISING SOFFCUT TO AVOID                            LUMP SUM PRICE.
                        A MINIMUM 40mm TO TOP REINFORCEMENT, 50mm TO BOTTOM REINFORCEMENT.                                                                                                                UNCONTROLLED SHRINKAGE CRACKING, BUT NOT SO EARLY AS TO CAUSE UNACCEPTABLE                           THE CONTRACTOR SHALL BE UNDERTAKING THEIR OWN INSPECTIONS AND REQUEST
                   17. PIPES OR CONDUITS SHALL NOT BE PLACED WITHIN THE COVER TO REINFORCEMENT.                                                                                                           RAVELING OF JOINT EDGES. PROGRAM SITE AND TIME OF CONCRETE POURS TO PERMIT                           INSPECTIONS ONLY WHEN THE WORKS MEET THE REQUIRED SPECIFICATIONS.
                   18. REINFORCEMENT QUALITY                                                                                                                                                              SAWING TO BE CARRIED OUT WITHOUT CAUSING NOISE POLLUTION.
                        19.1 BAR REINFORCEMENT                                                                                                                                                    9.      CONCURRENTLY WITH THE SAWING OPERATIONS THE SAWN GROOVE SHALL BE WASHED
                                                                                                                                                                                                          FREE OF MATERIAL.                                                                                    CONSTRUCTION QA DOCUMENTATION
                             SYMBOL                      BAR SHAPE                          STRENGTH DUCTILITY TO COMPLY WITH
                                                                                           GRADE (MPa) CLASS   AUST. STANDARD                                                                    10.      SAWN GROOVES FORMING THE RESERVOIR FOR A JOINT SEALANT SHALL BE FORMED IN
                                                                                                                                                                                                          TWO STAGES. THE SECOND SAWCUT SHALL BE MADE AS LATE AS POSSIBLE.                                     1.   THE CONTRACTOR SHALL PROVIDE THE FOLLOWING QA DOCUMENTATION TO THE
                                   N          DEFORMED RIBBED BAR                                  500                NORMAL                     AS 4671                                                                                                                                                            CERTIFYING ENGINEER FOR THE PREPARATION OF FORM 12 AND/OR CONSTRUCTION
                                   R          PLAIN ROUND BAR                                      250                NORMAL                     AS 4671                                                                                                                                                            CERTIFICATION. THE PROVISION OF THIS INFORMATION DOES NOT REMOVE THE
                                   Y          DEFORMED BAR                                         410                NORMAL                     AS 1302
                                                                                                                                                                                                  ASPHALTIC CONCRETE
                                                                                                                                                                                                                                                                                                                    REQUIREMENT FOR THE CERTIFYING ENGINEER TO ADEQUATELY INSPECT THE WORKS
                                              *SEE NOTE                                                                                                                                                                                                                                                             DURING CONSTRUCTION
                                                                                                                                                                                                 GENERAL
                            ALL BARS TO BE "N" UNLESS NOTED OTHERWISE THE NUMBER FOLLOWING THE SYMBOL IS                                                                                         1.   ASPHALTIC CONCRETE MIX DESIGN, MANUFACTURE, PLACING AND COMPACTION SHALL BE
                             THE NOMINAL BAR SIZE IN mm. FOR EXAMPLE, N16 DENOTES A DEFORMED RIBBED BAR, OF                                                                                           IN ACCORDANCE WITH THE SPECIFICATION FOR AC10 MIX AND AS 2734 - 1984 ASPHALT                             GENERAL
                             GRADE 500MPa NORMAL DUCTILE STEEL, WITH A NOMINAL 16mm DIAMETER.                                                                                                         (HOT MIXED) PAVING - A GUIDE TO GOOD PRACTICE. MINERAL FILLER TO COMPLY WITH AS                          1.  ALL CBR TESTS, COMPACTION TESTS, AND OTHER GEOTECHNICAL TESTING IS TO BE
                             *NOTE: Y BARS MAY BE REPLACED WITH N BARS OF SAME SIZE.                                                                                                                  2357-1980 MINERAL FILLERS FOR ASPHALT.                                                                       UNDERTAKEN BY THE GEOTECHNICAL TESTING AND INSPECTION AUTHORITY (GITA) FOR
                             19.2 MESH REINFORCEMENT                                                                                                                                             PAVEMENT PREPARATION                                                                                              THE SITE
20cm




                                                                                                                                                                                                 2. THE EXISTING SURFACE TO BE SEALED SHALL BE DRY AND BROOMED BEFORE                                          2. ALL SURVEY DOCUMENTATION TO BE UNDERTAKEN BY A LICENCED REGISTERED
                             SYMBOL                     DENOTES                              STRENGTH DUCTILITY TO COMPLY WITH                                                                                                                                                                                     SURVEYOR.
                                                                                                                                                                                                      COMMENCEMENT OF WORK TO ENSURE COMPLETE REMOVAL OF ALL SUPERFICIAL
                                                                                            GRADE (MPa) CLASS   AUST. STANDARD
                                                                                                                                                                                                      FOREIGN MATTER.
                                  RL         RECTANGULAR MESH OF                                     500                  LOW                     AS 4671                                        3. ALL DEPRESSIONS OR UNEVEN AREAS ARE TO BE TACK-COATED AND BROUGHT UP TO                                    ROADWORKS/PAVEMENTS
                                             DEFORMED RIBBED BARS                                                                                                                                     GENERAL LEVEL OF PAVEMENT WITH ASPHALTIC CONCRETE BEFORE LAYING OF MAIN                                  1.  CBR TEST RESULTS FOR ALL VEHICLE PAVEMENT SUBGRADE (NUMBER OF TESTS TO BE
                                  SL         SQUARE MESH OF                                          500                  LOW                     AS 4671                                             COURSE.                                                                                                      THE GREATER OF 50m SPACING ALONG LENGTH OF ROAD OR LOCAL AUTHORITY
                                             DEFORMED RIBBED BARS                                                                                                                                TACK COAT                                                                                                         REQUIREMENT). CBR TEST & LOCATION TO BE CONFIRMED BY GITA THAT THE TEST RESULT
                                                                                                                                                                                                 4. THE WHOLE OF THE AREA TO BE SHEETED WITH ASPHALTIC CONCRETE SHALL BE LIGHTLY                                   IS REPRESENTATIVE OF THE SUBGRADE MATERIAL FOR THAT TEST AREA.
                                   F         RECTANGULAR OR                                          450                                          AS 1304
                                                                                                                                                                                                      AND EVENLY COATED WITH RAPID SETTING BITUMEN.                                                            2. COMPACTION TESTS FOR ROAD PAVEMENT LAYERS (NUMBER OF TESTS TO BE THE
                                             SQUARE MESH OF PLAIN
                                                                                                                                                                                                 JOINTS                                                                                                            GREATER OF 50m SPACING ALONG LENGTH OF ROAD OR LOCAL AUTHORITY REQUIREMENT).
                                             WIRE *SEE NOTE
                                                                                                                                                                                                 5. THE NUMBER OF JOINTS BOTH LONGITUDINAL AND TRANSVERSE SHALL BE KEPT TO A                                       COMPACTION TEST RESULTS FOR SUBGRADE REPLACEMENT
                       THE NUMBERS FOLLOWING THE SYMBOL DENOTE THE PRODUCT CODE. FOR EXAMPLE, SL92                                                                                                                                                                                                             3. GRAVEL PAVEMENT DOCKETS
                                                                                                                                                                                                      MINIMUM.
                       DENOTES A SQUARE MESH OF 9mm (NOMINAL DIAMETER) DEFORMED RIBBED BARS AT                                                                                                                                                                                                                 4. AC DATA SHEETS
                                                                                                                                                                                                 6. THE DENSITY AND SURFACE FINISH AT JOINTS SHALL BE SIMILAR TO THOSE OF THE
                       200mm CENTRES, OF GRADE 500MPa LOW DUCTILITY STEEL.                                                                                                                                                                                                                                     5. PRIMER AND SEAL DATA SHEETS
                                                                                                                                                                                                      REMAINDER OF THE LAYER.
                       *NOTE: F MESH MAY BE REPLACED WITH RL OR SL MESH OF THE SAME CONFIGURATION.                                                                                                                                                                                                             6. AC COMPACTION TEST RESULTS
                                                                                                                                                                                                 COMPACTION
                   19. REINFORCEMENT IS REPRESENTED DIAGRAMMATICALLY; IT IS NOT NECESSARILY SHOWN IN                                                                                                                                                                                                           7. SURVEY PICKUPS CONFIRMING LEVELS OF EACH PAVEMENT LAYER
                                                                                                                                                                                                 7.   ALL COMPACTION SHALL BE UNDERTAKEN USING SELF PROPELLED ROLLERS.
                       TRUE PROJECTION.                                                                                                                                                                                                                                                                        8. CONCRETE COMPRESSIVE STRENGTH TEST RESULTS FOR KERBS, FOOTPATHS AND RIGID
                                                                                                                                                                                                 8. INITIAL ROLLING SHALL BE COMPLETED BEFORE THE MIX TEMPERATURE FALLS BELOW
10cm




                   20. SPLICES IN REINFORCEMENT SHALL BE MADE ONLY IN THE POSITION SHOWN. THE WRITTEN                                                                                                                                                                                                              PAVEMENTS (IF APPLICABLE)
                                                                                                                                                                                                      105°C.
                       APPROVAL OF THE ENGINEER SHALL BE OBTAINED FOR ANY OTHER SPLICE.                                                                                                                                                                                                                        9. AS CONSTRUCTED SURVEY OF THE FINISHED SURFACE TO BE PICKED UP AT 5M GRIDS AND
                                                                                                                                                                                                 9. SECONDARY ROLLING SHALL BE COMPLETED BEFORE THE MIX TEMPERATURE FALLS




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       \\briproj1\projects\NA25\NA251816\Drawings\CAD\CIV\Drawings\NA251816-0000-C01-0101.dwg
                   21. WELDING OF REINFORCEMENT WILL BE PERMITTED ONLY AFTER APPROVAL BY THE                                                                                                                                                                                                                       AT ANY PAVEMENT EDGE OR CHANGE IN GRADE.
                                                                                                                                                                                                      BELOW 60°C.
                       ENGINEER.                                                                                                                                                                                                                                                                               10. AS CONSTRUCTED SURVEY TO BE PROVIDED IS GDA2020 COORDINATES IN DWG FORMAT
                                                                                                                                                                                                 FINISHED PAVEMENT PROPERTIES
                   22. SITE BENDING OF Y OR N BARS SHALL BE DONE COLD WITH POWER OR MECHANICAL                                                                                                                                                                                                                     AND IN REQUIRED ADAC FORMAT
                                                                                                                                                                                                 10. FINISHED SURFACES SHALL BE SMOOTH, DENSE AND TRUE TO SHAPE AND SHALL NOT
                       BENDING TOOLS.
                                                                                                                                                                                                      VARY MORE THAN THE SPECIFIED TOLERANCES.



                                                                                                                                                                                                                                                                                                                                                                                                 ENGINEER'S CERTIFICATION
                                                                                                                                                                                                                                                                                                                                                                                                 NAME:
                                                                                                                                                                                                                                                                                                                                                                                                 RPEQ No:
                                                                                                                                                                                                                                                                                                                                                                                                 SIGNED:

                                                                                                                                                        North                            Scale                                                                    Client                       Architect                                                                                         Project                                            Drawing Title
                                                                                                                                                                                                                                                                                                                                                             ACOR Consultants Pty Ltd
                                                                                                                                                                                                                                                                  ALDI STORES                                                                                                                    NOOSAVILLE ALDI                                    CIVIL SERVICES
                                                                                                                                                                                                                                                                                                                                                                 Level 7, 104 Melbourne Street
1cm at full size




                                                                                                                                                                                                                                                                                                                                                                                                                                                    CONSTRUCTION NOTES
                                                                                                                                                                                                                                                                                                                                                                     South Brisbane QLD 4101                                                        SHEET 2
                                                                                                                                                                                                                                                                                                                                                                          T +61 7 3844 5900                                                         Drawn           Designed      Q.A. Check   Date       Scale @ A1




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Jul 09, 2026 - 5:20pm
                                                                                                                                                                                                                                                                                                                                                                                                 201 WEYBA ROAD NOOSAVILLE QLD 4566                 JG              PK            SS           09.07.26   NTS
0




                      B      ISSUE FOR TENDER                                                                         09.07.26       JG        PK                                                                                                                                              110 GOTHA STREET FORTITUDE VALLEY QLD                                                                                                                Project No.     Drawing No.                               Issue
                      A
                   Issue.
                             90% DD ISSUE
                             Description
                                                                                                                      26.06.26
                                                                                                                         Date
                                                                                                                                     JG
                                                                                                                                    Drawn
                                                                                                                                               PK
                                                                                                                                             Approved
                                                                                                                                                                                                   PRINT IN COLOUR                                                                             T: 07 3252 1188                                                                                                      FOR TENDER                      NA251816        C01-0102                                   B
-1




                   © COPYRIGHT of this design and plan is the property of ACOR Consultants Pty Ltd, ACN 079 306 246 ABN 40 079 306 246, all rights reserved. It must not be used, modified, reproduced or copied wholly or in part without written permission from ACOR Consultants Pty Ltd.

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

NA251816_OPW_DRAWINGS.pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.