51901.3557.01 - Request to change existing approval
SCRC CORRESPONDENCE
B0406038
Sunshine Coast Kequest to Change Existing Approval and/or
Extension to Relevant Period
NOTES: Which entity issued the approval?
ALL questions MUST be completed unless the form indicates Sunshine Coast Regional Council
otherwise. Other entity - please specify:
This form must be submitted to Council accompanied by the
Is the approval for a mobile and temporary ERA?
applicable fee.
Attach extra pages if there is insufficient space on the form. No
If Council was the Assessment Manager for the existing approval, Yes - complete below
and the approval was issued by the Court, then:- Insert the name of each local government area in which the
(a) a request to change the development approval and/or mobile and temporary ERA is proposed to
conditions is made to the Court; and operate/operating.
(b) a request to extend the relevant period for the approval is
made to Council.
All terms used on the form have the meaning given in the
Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009. 3. Nature of request
Please tick ALL applicable categories
F1.- Details of the person making the request
To change the development approval
Full name - individual or company To change the development conditions
To extend the relevant period before lapsing
Contact name -for company Please attach documentation outlining the details of
and the reasons and justification for the requested
V change or extension.
Postal address
4. Location of the premises
S2 Gvv^ecr\C is
d Postcode Street address
Unit no. Street no. Street name
Contact phone number Fax number - if applicable 1,014.1 j 4S.-0
Suburb Postcode
I-Ash2'
Mobile number -if applicable
Lot and plan description
5 ' 7a r
Lot no. Plan type & plan no.
E-mail address -if applicable
n
2. Details of the existing approval
Type of approval - please tick ALL applicable categories
Development Per
Concurrence Agencies
Preliminary Approval f1
Compliance Permit WaS there one or more concurrence agencies involved in
Material Change of U e the original approval?
Reconfiguring a Lot -- 7 SEP 2011 No
Operational Works Yes - provide details below
Building Works
T ewa ftl n Not,- Under s372 of the Sustainable Planning Act 2009 the person
Plumbing or Drainage orks making the request is required to give a copy of this request to all
concurrence agencies.
Compliance Certificate
Environmentally Relevant Activity (ERA) Concurrence Agency Date copy given
Application number Date issued
1 i /
(si i i• 3s_s7)
q^ q ^l
PD-DA-FM401 / 1-30/04/2010 psi 21 f; Page 1 of 2
[OCR of page images]
SCRC CORRESPONDENCE
B0406038
Kequest
Sunshine Coast
NOTES:
ALi questions MUST be completed unless the form indicates
otherwise.
This form must be submitted to Council accompanied by the
applicable fee.
Attach extra pages if there is insufficient space on the form.
If Council was the Assessment Manager.for the existing copra
and the approval was issued by the Court, then:-
(a) a request to change the development approval and/or
conditions is made to the Court; and
(b) a request to extend the relevant period for the approval is
made to Council.
All terms used on the form have the meaning given in the
Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
{4. Details of the person making the request
Full name — individual or company
\ 76
Contact name — for company
LN\A |
Postal address
neland MC
BO Box Ws
Maca
- Postcode 4+ ]Ya
Contact phone number Fax number - if applicable
Le\a [ \A°
Mobile number — if applicable
LOYS4ua0S 3604
E-mail address — if applicable a
J
ES
Type of approval — please tick ALL applicable categories
Development Pe: a
Preliminary Approval
Compliance Permit
Material Change of Use
Details of the existing approval
Deve lo MYER
_4 SEP 2011
$ £
“oun
D<
Reconfiguring a Lot
Operational Works
Building Works
Plumbing or Drainage Works
Compliance Certificate _
Environmentally Relevant Activity (ERA)
Tewantin
Application number Date issued
L-WC WAG
=
5) Gol. 3587. O/ :
to Change Existing Approval and/or
Extension to Relevant Period
Which entity issued the approval?
Sunshine Coast Regional Council
Other entity — please specify:
Is th
><
approval for a mobile and temporary ERA?
No
Yes — complete below
Insert the name of each local government area in which the
mobile and temporary ERA is proposed to
operate/operating.
[-3. Nature of request
Please tick ALL applicable categories
To change the development approval
To change the development conditions
To extend the relevant period before lapsing
Please attach documentation outlining the details of
and the reasons and justification for the requested
change or extension.
[4. Location of the premises
Street address
Unitno. Streetno. Street name
ki Jod
Suburb Postcode
LNoox, T4sb
Lot and plan description
Lot no. Plan sype & plan no.
43
Bud s31e ake Dar as
ol fice
oe]
Was there one or more concurrence agencies involved in
the original approval?
No
Yes — provide details below
Note\- Under s372 of the Sustainable Planning Act 2009 the person
g the request is required to give a copy of this request to all
concurrence agencies.
Concurrence Agencies
Concurrence Agency Date copy given
~ |S N
~I~
(S17o!. 3557)
PD-DA-FM401/1-30/04/2010
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (51901.3557.01 - Request to change existing approval.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 2 pages
Page 2
6. Pre-request response notice 8. Does the request involve a State resource
prescribed under the Sustainable Planning
Has a pre-request response notice been given by a relevant
Regulation 2009, Schedule 14?
entity (e.g. a concurrence agency) for this request?
No No
F Yes Yes - complete Table C below
If yes, please attach a copy of the notice.
Table C - State owned resource
Nature of State owned resource
Owner's consent 1
Is the owner's consent required for this request?
No Nature of evidence required
Yes - complete either Table A or Table B below Evidence of allocation of /entitlement to, the resource
Note - if more than one owner of the land all owners' details are Evidence the chief executive has agreed to the request
required.
Attach a copy of the evidence required above.
Table A - owner's consent provided on form
Owner's name/s NOTES: For question 8
Section 370(3) and (4) of the Sustainable Planning Act 2009 requires
I/We, the above-mentioned ow s of the land, consent to that if an application for the development approval were made at
the making of this request. the time of making this request and evidence under section 264(1) of
Signature/s the Sustainable Planning Act 2009 would be required to support the
application, this request must be accompanied by the written
agreement of the chief executive from whom evidence would be
Date
required under section 264(1).
Section 264 of the Sustainable Planning Act 2009 provides that if a
development involves a State resource, a regulation may require the
Table B - owner's consent attached application to be supported by certain evidence prescribed under
Owner's name/s regulation. Schedule 14 of the Sustainable Planning Regulation 2009
prescribes the State resources for which evidence is required to be
given, and the evidence required, to support the application.
The owner's written consent is attached.
NOTES: For question 7 C Applicant's declaration
Under section 371 of the Sustainable Planning Act 2009, if the
person making the request is not the owner of the land to which the
approval relates, the request must be accompanied by the owner's
consent.
However, owner's consent is not required if the approval:
B aking thi request, I declare that all information in this
• relates to land the was acquisition land to which section
263(2)(d) of the Sustainable Planning Act 2009 applied when reques d correct.
the application for the approval was made; or
• is for building work or operational work for the supply of
community infrastructure on land designated for the
community infrastructure; or
• the consent of the owner would not be required under section
263(1) of the Sustainable Planning Act 2009 if a development
application were made for the requested change.
Also, owner's consent is not required if the Assessment Manager is
satisfied that.
• the number of owners of the land make it impractical to obtain
owners' consent, and the requested change does not materially
affect the owners' land; or
• having regard to the nature of the proposed change, the owner
has unreasonably withheld consent and the requested change
does not materially affect the owner's land.
PD-DA-FM401/1-30/04/2010 Page 2 of 2
[OCR of page images]
‘
| 6. Pre-request response notice 2 . | 8. Does the request involve a State resource
g ‘ prescribed under the Sustainable Planning
Has a pre-request response notice been given by a relevant Regulation 2009, Schedule 14?
entity (e.g. a concurrence agency) for this request? 2
<| No No
Yes Yes — complete Table C below
\ if yes, please attach a copy of the notice.
EA Owner’s consent |
is the owner’s consent required for this request?
No
Yes — complete either Table A or Table B below
Note — If more than one owner of the land all owners’ details are
required.
Table A — owner's consent provided on form
Owner’s name/s
Rawson HE
\/We, the above-mentioned ow 's of the land, consent to
the making of this request.
Signature/s
or
Date HoleX JAY easel
Table B — owner's consent attached
Owner’s name/s
| The owner's written consent is attached.
NOTES: For question 7
Under section 371 of the Sustainable Planning Act 2009, if the
person making the request is not the owner of the land:to which the
approval relates, the request must be accompanied by the owner’s
consent.
However, owner's consent is not required if the approval:
e — relates to land the was acquisition land to which section
263(2)(d) of the Sustainable Planning Act 2009 applied when
the application for the approval was made; or
° is for building work or operational work for the supply of
community infrastructure on land designated for the
community infrastructure; or
¢ — the consent of the owner would not be required under section
263(1) of the Sustainable Planning Act 2009 if a development
application were made for the requested change.
Also, owner’s consent is not required if the Assessment Manager is
satisfied that:
e the number of owners of the land make it impractical to obtain
owners’ consent, and the requested change does not materially
affect the owners’ land; or .
has unreasonably withheld consent and the requested change
© having regard to the nature of the proposed change, the owner.
does not materially affect the owner’s land:
PD-DA-FM401/1-30/04/2010
Table C - State owned resource
Nature of State owned resource
Nature of evidence required
Evidence of allocation of /entitlement to, the resource
Evidence the chief executive has agreed to the request
\ Attach a copy of the evidence required above.
NOTES: For question 8
Section 370(3) and (4) of the Sustainable Planning Act 2009 requires
that if an application for the development approval were made at
the time of making this request and evidence under section 264(1) of
the Sustainable Planning Act 2009 would be required to support the
application, this request must be accompanied by the written
agreement of the chief executive from whom evidence would be
required under section 264(1).
Section 264 of the Sustainable Planning Act 2009 provides that if a
development involves a State resource, a regulation may require the
application to be supported by certain evidence prescribed under
regulation. Schedule 14 of the Sustainable Planning Regulation 2009
prescribes the State resources for which evidence is required to be
given, and the evidence required, to support the application.
[9. Applicant’s declaration — |
Page 2 of 2
Page 3
September 7, 2011
Michael Cantori
Locked Bag 72
Sunshine Coast Mail Center
Queensland
4560
Re: Development Permit TPC 1190 -14111 Edgar Bennett Ave, Noosa Heads (Lot 43 BUP 5738)
Dear Sir,
This letter is sent to acknowledge receipt council letter dated the 8th August 2011; it will be my intention to
pursue the change of use for the above mentioned property from its current use being conference center
to accommodation sole purpose principle place of residence
Enclosed is a copy of the change of use application the fees and originals will be sent by post today to the
above mentioned address,
Please let me know if there is any further requirement I need to comply with
Signed under seal this 6th day of September,2011.
Nicho
Manager
0457053604
[email protected]
Coal City Drilling Pty Ltd
26 Len Shield Street, Paget, Mackay, Queensland, 4740, Australia
Tel: 0457053604 / Fax:
[OCR of page images]
September 7, 2011
Michael Cantori
Locked Bag 72
Sunshine Coast Mail Center
Queensland
4560
Re: Development Permit TPC 1190 ~ 141/14 Edgar Bennett Ave, Noosa Heads (Lot 43 BUP 5738)
Dear Sir,
This letter is sent to acknowledge receipt council letter dated the 8 August 2011; it will be my intention to
pursue the change of use for the above mentioned property from its current use being conference center
to accommodation sole purpose principle place of residence
Enclosed is a copy of the change of use application the fees and originals will be sent by post today to the
above mentioned address.
Please let me know if there is any further requirement | need to comply with
Signed under seal this 6th day of September,2011.
Sincerely,
Nicholas Wiperi
Manager
0457053604
[email protected]
Coal Gity Drilling Pty Ltd
26 Len Shield Street, Paget, Mackay, Queensland, 4740, Australia
Tel: 0457053604 / Fax: