Skip to the record
Search everything, all in one place.

Council archive · source document

DA Form 1 · OPW26/0058

of 12

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

   
   
 

6.3) Additional aspects of development

LJ Additional aspects of development are relevant to this development application and the details for these aspects
that would be required under Part 3 Section 1 of this form have been attached to this development application

Not required
6.4) Is the application for State facilitated development?
(CO Yes - Has a notice of declaration been given by the Minister?

CINo

   
  
  
 

  
   
 
   

Section 2 — Further development details
7) Does the proposed development application involve any of the following?

 

 

 

 

Material change of use (1 Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot LO Yes — complete division 2

Operational work C1 Yes — complete division 3

Building work C1 Yes - complete DA Form 2— Building work details

 

 

 

Division 1 — Material change of use

Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument.

       

8.1) Describe the proposed material change of use

Provide a general description of the Provide the planning scheme definition | Number of dwelling | Gross floor

proposed use (include each definition in a new row) units (if applicable) area (m?)
(if applicable)

 

 

 

 

 

 

|

 

8.2) Does the proposed use involve the use of existing buildings on the premises?

C1 Yes

CI No

8.3) Does the proposed development relate to temporary accepted development under the Planning Regulation?
OO Yes — provide details below or include details in a schedule to this development application

LC No

Provide a general description of the temporary accepted development Specify the stated period dates
under the Planning Regulation

 

   

 

 

 

 

 

 

 

Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfic
9.1) What is the total number of existing lots making up the premises?

9.2) What is the nature of the lot reconfiguration? (tick ail applicable boxes)

guring a lot.

 
 

   

   
     

 

 

L] Subdivision (complete 10) U1 Dividing land into parts by agreement (complete 11)
(J Boundary realignment (compiete 12) (1 Creating or changing an easement giving access to a lot
from a constructed road (complete 13)

 

 

 

Queensland
Government

 

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

DA Form 1.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.