Re: OPW22/0100 ~ Lot 80 RP71151, Lot 1 RP130594, Lot 81 RP71151
89, 91 & 93 Eumundi Noosa Road, Noosaville
We have reviewed Noosa Council’s request for further advice dated 31 May 2022 and provide our response to
the Engineering related items.
Issue 1: Existing Stormwater Infrastructure’s Condition/Capacity
The CCTV survey of the downstream stormwater network provided shows a number of cracks and minor
damage to the existing infrastructure.
No confirmation that the system has the capacity assumed in the SWMP has been provided.
Response:
We can certify that the existing stormwater network draining the site as confirmed by the recent CCTV
camera survey and earlier survey investigations is consistent with the pipe sizes used in our stormwater
drainage analysis. The stormwater network draining the site has adequate capacity.
Issue 2: Erosion and Sediment Control
The erosion and sediment control plans provided with the application are not considered capable of
meeting Condition 55 of approval MCU21/0156 or the likely conditions of approval for this OPW. The ESCP
is a tool for the applicant to achieve compliance with the outcomes required by the conditions, and as such
feedback from Council is provided to assist the applicant achieve those requirements and reduce the risk
of enforcement action and potential loss of performance bond during construction.
It is strongly recommended that additional consideration be given to how downstream and adjacent
properties will be protected from runoff during construction and how site discharges will minimise sediment
discharge from the site consistent with current best practice.
[OCR of page images]
>) SCG
CONSULTING
ENGINEERS
1 June 2022
SCG Ref: 31131(L4)
By email: [email protected] Cc: [email protected]
The Chief Executive Officer
Noosa Council
PO Box 141
Tewantin Qld 4565
Dear Sir
Re: OPW22/0100 ~ Lot 80 RP71151, Lot 1 RP130594, Lot 81 RP71151
89, 91 & 93 Eumundi Noosa Road, Noosaville
We have reviewed Noosa Council’s request for further advice dated 31 May 2022 and provide our response to
the Engineering related items.
Issue 1: Existing Stormwater Infrastructure’s Condition/Capacity
The CCTV survey of the downstream stormwater network provided shows a number of cracks and minor
damage to the existing infrastructure.
No confirmation that the system has the capacity assumed in the SWMP has been provided.
Response:
We can certify that the existing stormwater network draining the site as confirmed by the recent CCTV
camera survey and earlier survey investigations is consistent with the pipe sizes used in our stormwater
drainage analysis. The stormwater network draining the site has adequate capacity.
Issue 2: Erosion and Sediment Control
The erosion and sediment control plans provided with the application are not considered capable of
meeting Condition 55 of approval MCU21/0156 or the likely conditions of approval for this OPW. The ESCP
is a tool for the applicant to achieve compliance with the outcomes required by the conditions, and as such
feedback from Council is provided to assist the applicant achieve those requirements and reduce the risk
of enforcement action and potential loss of performance bond during construction.
It is strongly recommended that additional consideration be given to how downstream and adjacent
properties will be protected from runoff during construction and how site discharges will minimise sediment
discharge from the site consistent with current best practice.
07 5455 5604
07 5455 5696
[email protected]
: WWw.scg-engineers.com
PO Box 1661 Noosa Heads Qid 4567
Unit 1/11 Project Ave Noosaville Qld 4566 STRUCTURAL | CIVIL | GEOTECHNICAL
Debuild Pty Ltd Trading as ABN 40 098 481 899
Z2 ms
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Further Advice Response letter SCG 31131(L4).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 2 pages
Page 2
Response:
2.1 We have reviewed the guidelines on sediment basins by ICEA. We consider the proposed sediment basin
for the subject site to be consistent with a Type D Basin. The reason behind this decision is that automatic
chemical flocculation is not practical. The designs for IECA basin types A, B & D establish volumes for
settling and storage of sediments. We agree with this principle and have revised our proposed basin to
include these features, however we don’t believe this to be adequate enough to reduce sediment loads
for this site and as such we have retained the proposed bidim and gravel filtration features in a forebay
arrangement upstream from the basin. This decision is based upon the authors experience with projects
over the last 20 years where similar filtration features have functioned well in reducing sediment loads
during the construction phases.
2.2 Noted.
2.3 The sediment fence wrapped in builder’s plastic is proposed to divert runoff along the northern boundary
towards the sediment basin and avoid runoff entering into the neighbouring Busy Bees Childcare Centre.
An alternative solution such as a soil bund along the boundary will not work due to the proximity of the
proposed building works that will occur along the boundary .
2.4 The proposed overflow level of the weir wall in the basin will be RL 11.30m. We note Council’s concern
and have shown an earth bund extending up from the corner of the sediment basin along the northern
boundary to a point where the bund extends past the RL 11.5m contour.
Issue 3 & 4: Stormwater Drainage
There are a number of conditions of the higher-order approval and FIR which have not been addressed
Response:
QUDM section 7.4 provides guidance on the roadway flow limits and capacities. It suggests flow width for
major roads as not applicable.
Site drainage entering the road will be from roof runoff only where gutter capacities are limited to Q20.
Therefore, only Q20 flows require consideration of impact.
Noosa Eumundi Road has a longitudinal grade of 1 in 30 where the site drainage will connect to the kerb.
Q20 kerb flows without the site drainage would be approximately 90mm deep and 1.3m wide (kerb flow).
When including the site drainage, the flow depth increases to 96mm and the flow width to 1.39m.
We have included overland flow rates and driveway capacities at 4 critical points on the sites driveway.
Year 2100 storm intensities have been used for these calculations and Mannings channel flow equations
have been used for the driveway profile flow capacities. The results confirm the driveway has the capacity
to convey the year 2100 flows.
Issue 5: Stormwater Quality
There are a number of conditions of the higher-order approval which have either not been addressed or for
which details require modification
Response:
5.1 Noted and revised.
5.2 Stone pitching has always been shown and SCG Consulting Engineers letter of response dated 19 May
2022 (item 10) attempted to further clarify this. However, to satisfy Council we have reduced the height
difference to 200mm and extended the stone pitching.
5.3 Noted and revised.
5.4 Noted and revised.
SCG Consulting Engineers Page 2 of 3 SCG Ref: 31131(L1)
[OCR of page images]
Response:
2.1
2.2
2.3
24
We have reviewed the guidelines on sediment basins by ICEA. We consider the proposed sediment basin
for the subject site to be consistent with a Type D Basin. The reason behind this decision is that automatic
chemical flocculation is not practical. The designs for IECA basin types A, B & D establish volumes for
settling and storage of sediments. We agree with this principle and have revised our proposed basin to
include these features, however we don’t believe this to be adequate enough to reduce sediment loads
for this site and as such we have retained the proposed bidim and gravel filtration features in a forebay
arrangement upstream from the basin. This decision is based upon the authors experience with projects
over the last 20 years where similar filtration features have functioned well in reducing sediment loads
during the construction phases.
Noted.
The sediment fence wrapped in builder’s plastic is proposed to divert runoff along the northern boundary
towards the sediment basin and avoid runoff entering into the neighbouring Busy Bees Childcare Centre.
An alternative solution such as a soil bund along the boundary will not work due to the proximity of the
proposed building works that will occur along the boundary .
The proposed overflow level of the weir wall in the basin will be RL 11.30m. We note Council’s concern
and have shown an earth bund extending up from the corner of the sediment basin along the northern
boundary to a point where the bund extends past the RL 11.5m contour.
Issue 3 & 4: Stormwater Drainage
There are a number of conditions of the higher-order approval and FIR which have not been addressed
Response:
QUDM section 7.4 provides guidance on the roadway flow limits and capacities. It suggests flow width for
major roads as not applicable.
Site drainage entering the road will be from roof runoff only where gutter capacities are limited to Qzo.
Therefore, only Q20 flows require consideration of impact.
Noosa Eumundi Road has a longitudinal grade of 1 in 30 where the site drainage will connect to the kerb.
Qzo kerb flows without the site drainage would be approximately 90mm deep and 1.3m wide (kerb flow).
When including the site drainage, the flow depth increases to 96mm and the flow width to 1.39m.
We have included overland flow rates and driveway capacities at 4 critical points on the sites driveway.
Year 2100 storm intensities have been used for these calculations and Mannings channel flow equations
have been used for the driveway profile flow capacities. The results confirm the driveway has the capacity
to convey the year 2100 flows.
Issue 5: Stormwater Quality
There are a number of conditions of the higher-order approval which have either not been addressed or for
which details require modification
Response:
5.1
Noted and revised.
5.2 Stone pitching has always been shown and SCG Consulting Engineers letter of response dated 19 May
2022 (item 10) attempted to further clarify this. However, to satisfy Council we have reduced the height
difference to 200mm and extended the stone pitching.
5.3 Noted and revised.
5.4 Noted and revised.
SCG Consulting Engineers Page 2 of 3 SCG Ref: 31131(L1)
Page 3
We attach copies of our plans revised to address the above issues. If you require any further information, please do not hesitate to contact our office. Yours faithfully SEAN RICHARDSON – RPEQ 5835 For and on behalf of SCG CONSULTING ENGINEERS Enc SCG Consulting Engineers Drawing numbers: 31131 – OW2.1.RevB, OW2.2.RevA, SW1.1.RevF, SW1.2.RevB SCG Consulting Engineers Page 3 of 3 SCG Ref: 31131(L1) [OCR of page images] We attach copies of our plans revised to address the above issues. If you require any further information, please do not hesitate to contact our office. Yours faithfully SEAN RICHARDSON — RPEQ 5835 For and on behalf of SCG CONSULTING ENGINEERS Enc SCG Consulting Engineers Drawing numbers: 31131 — OW2.1.RevB, OW2.2.RevA, SW1.1.RevF, SW1.2.RevB SCG Consulting Engineers Page 3 of 3 SCG Ref: 31131(L1)