Original source · versioned page text
Attachment 7 - Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn SECTION Y
SCALE 1:40 (A3) C001
TYPICAL BIORETENTION BASIN AND OVERFLOW PIT DETAIL
SCALE 1:40 (A3)
TYPICAL BIORETENTION CLEANOUT DETAIL
SCALE 1:40 (A3)
290
BIORETENTION BASIN
This bioretention basin reduces the pollution of
our waterways by reducing the amount of
heavy metals, litter, suspended solids, and
210
nutrients discharged to the nearby waterway.
SCALE 1:40 (A3)
BIORETENTION EDUCATION SIGN SECTION X
TO BE FIXED USING S/S SCREWS TO POST OR FENCE AT EACH BIORETENTION BASIN IN SCALE 1:200 (A3)
SCALE 1:40 (A3) C001
A PUBLIC AREA OR VISIBLE TO PUBLIC FROM FOOTPATH
NOT TO SCALE
SECTION THROUGH DRIVEWAY - WESTERN SIDE (EASTERN SIDE DIFFERS)
Consulting Civil & PROPOSED INDUSTRIAL 192297 C300
Structural Engineers STORMWATER DETAILS COMPLEX 11 LEO ALLEY ROAD, B
Project Management DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.