Original source · versioned page text
Attachment 7 - Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSTORMWATER MANAGEMENT PLAN Client: Devcon Capital 9 Location: 11 Leo Alley Road, Noosavile DOCUMENT ISSUE APPROVAL Project No: 192297 Title: Stormwater Management Plan Client: Devcon Capital 9 Date: November 2020 Issue: D Distribution: Noosa Shire Council – Two (2) copies, 1 digital Covey Associates – One (1) copy Devcon Capital 9 – One (1) copy © Copyright Covey Associates Pty Ltd (2019). This document is the property of Covey Associates Pty Ltd. This document and the information contained in it are solely for the use of the authorised recipient and this document may not be used, copies of reproduced in whole or part for any purpose other than that for which it was supplied by Covey Associates Pty Ltd. Covey Associates Pty Ltd makes no representation, undertakes no duty and accepts no responsibility to any third party who may use or rely upon this document or the information contained in it. COPYRIGHT NOTICE: Parts of this document contain material originally prepared by: This material is the intellectual property and copyright of Covey Associates Pty Ltd. Author: Allister Gaffney Reviewed: Mark Cumming BEng (Hons), MEng BEng (Hons), RPEQ
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.