Attachment 7 - Stormwater Management Plan

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Council documents




                         undertaken to determine easement rights and terms. The search will also provide some
                         direction regarding building structures and services within the easements.
                 Stormwater
                 2.      The issue of whether the current site’s condition could be considered for “non-
                         worsening” calculations was discussed. Council advised that it did not have much
                         information on the site and the drainage considerations as the development was a
                         “State” development. It was suggested that the capacity of the downstream drainage
                         system especially along the eastern boundary, was a constraining factor. It was
                         discussed that there was opportunity to provide some detention within the treatment
                         areas (adjacent to the eastern carpark and at the entrance to the site) to ensure that
                         runoff did not exceed the capacity of the downstream system and create drainage issues
                         for the adjoining properties.
                 3.      The question of ownership and dimensions of the downstream drainage system was
                         discussed. Council’s assets section have advised that the drainage system adjacent to
                         the site’s eastern boundary is a private drainage system.
                 Traffic
                 4.      The issue of heavy/service vehicles was discussed. It was suggested that given the size
                         of the individual tenancies, that it was unlikely that large vehicles would be required. Any
                         application would need to demonstrate the type of vehicle required for the proposed
                         development.
                 5.      There is no dedicated loading area indicated on the plans. Any application would need
                         to demonstrate that loading/unloading to/from delivery vehicles can be undertaken on
                         site without impacting on through traffic or customer carspaces
                 5.      The vehicle path to the waste collection area must be suitable for Council’s waste
                         collection vehicle as described in The Noosa Plan - Planning Scheme Policies 9 and 11.
                         It would appear from the submitted plan that the waste collection area may not be
                         sufficient to cater for the whole of the development. Any application would need to
                         include areas and a waste management plan in accordance with The Noosa Plan -
                         Planning Scheme Policies 9 and 11
                 6.      The width of the access driveway in the road reserve indicated on the submitted plan
                         appears to be excessive. It is suggested that the driveway be designed to the minimum
                         required to service the development.
                 6.      INFRASTRUCTURE CHARGES

                 A request for written advice for an Infrastructure Charges Contribution Estimate relevant to
                 your proposal may be obtained for a fee.
                 7.      FURTHER ADVICE TO BE SOUGHT

                 You are advised to contact Unitywater and any relevant Queensland Government Agencies
                 for their specific requirements in respect of your proposal.
                 Yours Faithfully




                  This document is a record of prelodgement discussions and will not be made available for public viewing. Prelodgement
                  discussions are conducted to explore development options and requirements, identify issues and provide guidance to prospective
                  applicants about Council’s policies for development. The recorded discussion items and outcomes in no way imply or commit to
                  an approval of the proposal on the part of Council or Council officers, nor guarantee that all potential issues associated with a
                  development proposal have been raised / identified. When a formal development application is lodged, the proposal will be
                  assessed on its planning merits in accordance with Council’s policy framework existing at the time of the assessment.
Document Set ID: 20847782
Version: 5, Version Date: 11/04/2019                                                                                             Print Date: 11 April 2019, 11:17 AM
Log in to download the original file

Attachment 7 - Stormwater Management Plan.pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.