Attachment 7 - Stormwater Management Plan

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                  STORMWATER MANAGEMENT PLAN
Client: Devcon Capital 9                                               Location: 11 Leo Alley Road, Noosaville


1.0 INTRODUCTION
This Stormwater Management Plan (SMP) has been commissioned by Leo Alley Drive
Developments Pty Ltd (PWH) to support a development application for 11 Leo Alley Road,
Noosaville. This SMP contains information relating to the stormwater quality and quantity
management of runoff associated with the development.

Noosa Shire Council (NSC) requires that stormwater quality and quantity be appropriately managed
and treated prior to discharge from the site. The Queensland State Planning Policy (SPP 2017) also
requires that urban development projects demonstrate how the potential impacts to receiving
environments are mitigated. The objective of this SMP is to outline the requirements for effective
stormwater management for the development in its entirety.

2.0 SITE DESCRIPTION

2.1      Site Location

The proposed development is located at 11 Leo Alley Road, Noosaville. The real property description
is Part of Lot 252 on SP104257. Refer to Figure 1 for further detail.

The site is approximately 0.5 ha in size and has compacted hardstand for an existing landscaping
supply business.




      Figure 1 – Site Locality (courtesy of Nearmap.com, accessed 4 June 2019, dated 27 May 2019)

2.2      Proposed Land-use

The proposal is for an industrial complex consisting of 21 industrial units and associated
infrastructure. Refer to the enclosed site plan in Appendix A for more details.




Covey Associates Pty Ltd                             1                                  Project No: 192297
Consulting Engineers                                                                      26719Rpt, Issue D
Log in to download the original file

Attachment 7 - Stormwater Management Plan.pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.