Council archive · source document
Operational Works Application OPW17-0552 · OPW17/0552
Department of Infrastructure, Local Government and Plannir
Section 2 — Further development details
© Does the proposed development application involve any af the following?
Material change of use (1 Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot (J Yes — complete division 2
Operational work [Yes — complete division 3
Building work (J Yes — complete DA Form 2 ~ Building work details
Division 1 — Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a local
planning instrument.
ee) DeSoaios in) ieee material Sei tie
Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m? }
(if applicable)
28.2) Does ire. proposed use involve the use of existing buildings on the premises? i
(Yes
C1 No
Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
Pah ie total number. of Scie lets making up the premises?
Diels the nature he tney (elt reconfiguration? (Te ale eres co,
(J Subdivision (complete 10)) ( Dividing land into parts by agreement (complete 71))
(1 Boundary realignment (complete 12}) (J Creating or changing an easement giving access to a lot from
a construction road (complete 13))
oS co :
10.1) Eor this\ development, how. many lots are being created and what is the intended use of those lots:
Intended use of lots created Industrial Other, please specify:
Residential Commercial
Number of lots created
10.2) Will the subdivision be staged?)
(J Yes — provide additional details below
[No
How many stages will the works include?
What stage(s) will this development application
apply to?
11) Dividing land into parts by esi =howr acy eee are being created and wie is the intended use of the
PEeye
Intended use of parts created
Residential Commercial industrial Other, please specify:
Number of parts created
Page 4
DA Form 1 — Development Application details
Version 1.0—3 July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application OPW17-0552 .pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.