Original source · versioned page text
B - Code Compliance
Tourist Accommodation Zone Code
PO26 AO26 AO26 – Not Applicable
Filling and excavation for operational works do not Filling and excavation for operation works are designed There are no earthworks proposed or required.
directly, indirectly or cumulatively cause adverse and constructed to ensure overland flow and/or flooding
impacts external to the development site by: is not worsened, impeded, or otherwise diverted to
a) causing ponding of water on the site or adversely affect other properties or downstream
nearby land; environments.
b) increasing flooding, which adversely affects
the safety or use of any land upstream or
downstream; or
c) adversely affecting the flow of water in any
overland flow path.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (B - Code Compliance.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.