Transport Code

          stormwater run-off from contributing
          catchments and the preservation of all-
          weather access;
  c. kerb and channel—
     i.   controls vehicle movement by delineating
          the carriageway for all users;
    ii.   conveys road pavement run-off to
          stormwater drainage in a manner that
          allows the road to be trafficable in 1%AEP
          local rainfall events; and
  d. verges and footpaths provide—
     i.   safe access for pedestrians and cyclists
          clear of obstructions;
    ii.   an access area for vehicles onto properties;
   iii.   a corridor allocated for services and
          utilities; and
   iv.    additional amenity for minor roads.
Road Design and Construction
PO7                                                      AO7                                               PO7 – Complies
Development and building siting is responsive to         No acceptable outcome provided                    The existing building is oriented to maximise solar
Noosa Shire’s sub-tropical climate and the site’s                                                          access and shading opportunities. Further, ample
characteristics including topography, orientation,                                                         landscaping is provided throughout the site to
existing vegetation and prevailing winds.                                                                  enhance cooling effects.
PO8                                               AO8                                                      AO8 – Not Applicable
Development provides for cyclists on roads as     Roads provide for on-road cycling in accordance with the The development does not propose any new roads.
required for each category of road as identified in
                                                  standards specified in Council’s Planning Scheme Policy Noosa Drive is fully constructed, providing linkages
the Noosa Road Hierarchy.                         PSP6 Engineering Design Standards – Roads, drainage to secondary and primary cyclist networks.
                                                  and earthworks.
PO9                                               AO9.1                                                    AO9.1 to AO9.8 – Not Applicable
Development is designed to encourage walking and Pathway planning and design is in accordance with No new pedestrian infrastructure is proposed.
cycling wherever possible over the use of private pedestrian and cycling aspects of Austroads Guides.
vehicles.                                         AO9.2
                                                  Attractive and safe pedestrian and cycle connections to
                                                  and through the site are provided with shade trees,
                                                  graded walking and cycle paths and lighting.
                                                  AO9.3

Log in to download the original (B - Code Compliance.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.