B - Code Compliance.pdf
Transport Code
AO12.6
Where clearance of habitat is unavoidable, once the area
disturbed by the works is re-established, replacement
habitat is planted in proximity of the works to create native
fauna habitat suitable for the area and maintained for the
life of the works.
PO13 AO13
Road infrastructure is constructed to minimise Road infrastructure is constructed in accordance with
adverse environmental impacts, including from run- Council’s Planning Scheme Policy PSP6 Engineering
off and erosion. Design Standards – Roads, drainage and earthworks
External Works and Infrastructure
PO14 AO14 AO14 - Complies
Development is provided with external works— Where not already existing, the following infrastructure Noosa Drive is a full width sealed road which includes
a) along the full extent of the frontage of the site components are provided at the frontage of the site— constructed concrete kerb and channel. All necessary
to an appropriate standard having regard to the a) full width sealed road; services are in place and no alterations are required
specified function of the road; and b) concrete kerb and channel where appropriate; to public utility mains, services or installations are
b) provided beyond the site’s frontage if required. c) forming and grading to footpaths; required.
d) vehicular kerb and footpath crossings;
e) a constructed bikeway;
f) a constructed footpath;
g) a constructed carriageway;
h) required alterations to public utility mains, services
or installations;
i) construction of any required alterations to public
utility mains, services or installations;
j) stormwater drainage works; and
k) installation of electrical conduits.
PO15 AO15 PO15 – Not Applicable
Any alterations or repairs to infrastructure as a result No acceptable outcome provided The development does not require any alterations to
of the development are made at no cost to Council. infrastructure.
PO16 AO16 PO16 – Not Applicable
Road infrastructure is proven to be suitable for its use No acceptable outcome provided The development does not propose any new road
prior to Council accepting the dedicated asset. infrastructure.
Staged Development
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (B - Code Compliance.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.