Waste Management Code
Overall Outcome Response
The Overall Outcomes of the Waste Management Code are:
2a) Development provides opportunities to minimise waste generation and 2a - Complies
increase re-use and recycling. The STA unit's transient occupancy typically generates less waste, and visitors will have
access to both waste and recycling bins on site.
2b) The storage, disposal and management of solid, liquid and vegetative 2b - Complies
waste is conducted in a safe and ecologically sustainable manner without The development does not change the current kerbside collection arrangements
environmental nuisance. including frequency.
2c) The on-site storage of waste does not create environmental nuisance or 2c – Complies
adverse visual impact to adjoining properties during the construction or The STA unit will be commercially cleaned following stays to ensure waste is not causing
operational phase of development. nuisance.
2d) Council and other licensed trade waste services are able to conveniently 2d - Not Applicable
collect and dispose of waste generated by the development. The proposed accommodation use does not generate trade waste.
2e) The removal of waste generated by the demolition or removal of a building 2d - Not Applicable
is undertaken safely and without impacts on infrastructure or the local No demolition works are proposed.
environment and the site is left in a clean and usable condition.
Performance outcomes Acceptable outcomes Response
Waste Separation
PO1 AO1.1 AO1.1 to AO1.2 – Complies
Development that generates several classes of waste Construction, operational and demolition works are The proposal does not involve any physical works and
is designed so waste is collected, stored and planned and managed in accordance with Planning therefore no construction or demolition waste will be
disposed of in a safe and ecologically sustainable Scheme Policy PSP9 Waste management. generated. The existing waste collection operations
manner. will be maintained within the site unaltered.
Editor’s Note— PSP9 Waste Management requires Waste
Management Plans to be prepared as part of certain types of
development applications to ensure proper consideration is given to
waste minimisation, segregation and reuse.
AO1.2
Adequate area is provided on-site for the collection and
separate storage of recyclable, non-recyclable,
vegetative and hazardous materials in their specific waste
streams during construction or demolition works and the
operational phase of development.
PO2 AO2 AO2 – Complies
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (B - Code Compliance.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.