Original source · versioned page text
B - Code Compliance.pdf
Waste Management Code
PO7 AO7.1 AO7.1 to AO7.4 – Not Applicable
Demolition, removal, relocation or associated works Infrastructure including reticulated water, sewerage, The development does not involve any construction,
do not result in: stormwater, and electricity are protected from damage demolition, or earthworks, and therefore there is no
a) 'live' or 'active' infrastructure that may present and made safe to the standard required by the regulatory risk to infrastructure.
risk to people using the site or surrounding authority.
areas; or AO7.2
b) damage to infrastructure or other works. Infrastructure is disconnected, capped or sealed
including:
Editor's note— An approval will be required from Council's a) electricity meters are removed and electrical wires
Building and Plumbing Services for decommissioning plumbing disconnected;
apparatus including: b) telephone lines are disconnected; and
a) sanitary drains or reticulated water supply; and
c) data cables are disconnected and removed.
b) septic tanks, holding tanks or on-site treatment systems.
AO7.3
A temporary crossing is provided to protect road reserve
infrastructure including kerb and channel.
AO7.4
Any damage to footpaths, street plantings, natural
vegetation, kerb and channel, bridges or roadways at the
removal site, the new site or between the sites is repaired
or reinstated to at least pre-existing conditions.
PO8 AO8.1 AO7.1 to AO7.4 – Not Applicable
Waste materials are removed from the site to avoid Waste materials are removed from the site. The development does not generate waste from as no
causing unhealthy conditions including: AO8.2 construction, demolition, or earthworks are
a) potential fire hazard; If a development permit has not been issued for the future proposed.
b) ponding of water; and use of the site:
c) breeding of vermin. a) hard surfaced areas including concrete slabs are
removed or covered with a minimum of 300
millimetres of soil; and
b) disturbed areas are revegetated.
PO9 PO9 PO9 – Complies
The potential for movement from the site, of soils or No acceptable outcome provided The development does not involve any works and
similar materials is minimised. therefore erosion or sediment release is not expected.
PO10 PO10 PO10 – Not Applicable
Vacant sites do not have an adverse impact upon the No acceptable outcome provided The site is fully developed with well-established
amenity of the surrounding areas. landscaping, streetscape character and overall
amenity.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (B - Code Compliance.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.