Original source · versioned page text
B - Code Compliance.pdf
Water Quality and Drainage Code
Guidelines (October 2014) and for Wetland Systems the
Wetland Technical Design Guideline (May 2017).
PO8 AO8.1 AO8.1 to AO8.2 – Not Applicable
Water quality treatment infrastructure to be Detailed life cycle costing is provided for the entire The proposed change of use from a Multiple Dwelling
dedicated as public assets are proven to be suitable treatment train system including replacement costs of unit to a Short Term Accommodation unit involves no
for its use and of a cost effective and efficient asset parts. physical works or alterations to the existing
standard. AO8.2 stormwater systems. There are no new treatment
Treatment systems dedicated as public assets are systems proposed or necessary.
designed to minimise maintenance, renewal and
adaption costs and the requirement for specialised
equipment, material or maintenance techniques.
AO8.3
Vegetated stormwater management systems to be
dedicated as public assets are established and
maintained during the maintenance period to ensure
optimal vegetated growth and that the functional
elements of the system achieve the design function at the
end of the maintenance period.
PO9 AO9.1 AO9.1 to AO9.2 – Not Applicable
Treatment systems are designed to eliminate or Free draining inlets and outlets are provided to ensure The proposed change of use from a Multiple Dwelling
minimise health, safety and aesthetic hazards, that waters do not pond for more than 24 hours. unit to a Short Term Accommodation unit involves no
including risks associated with insect breeding, AO9.2 physical works or alterations to the existing
odour and public safety. Developments are designed to eliminate retaining walls stormwater systems. There are no proposed retaining
in excess of 0.8m for any water quality treatment device. structures.
Hydrology and Waterway Stability
PO10 AO10 AO10 – Complies
Development prevents increased bed and bank The development is designed to: The proposed change of use from a Multiple Dwelling
erosion and sedimentation in receiving waterways by a) limit the peak 1 year ARI event discharge within the unit to a Short Term Accommodation unit does not
avoiding changes in low rate, peak flow run-off and receiving waterway to the pre-development peak 1 involve any physical works or alterations to the
flow duration. year discharge; existing stormwater systems. Consequently, flows
b) maximise pervious areas by using pervious from current development conditions are maintained,
alternatives for otherwise impervious areas wherever and there will be no changes to pervious area.
possible;
c) provide for capture and reuse of stormwater for non-
potable purposes for gardening, toilet flushing,
laundry and hot water supply uses;
d) incorporate appropriate detention features; and
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (B - Code Compliance.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.