B - Code Compliance
Waterways Works Code
PO23 AO23.1 AO23.1 to AO23.4 – Not Applicable
The flood detention and amenity functions of the For premises adjoining a waterway within the Noosa The development does not involve Operational
area adjacent to the revetment wall within Noosa Water estate, no building work, filling or excavation Works within Noosa Waters Estate waterways.
Waters Estate are retained and enhanced by works within 4.5 metres of the centre line of the top of the
ensuring— concrete revetment wall.
a) works do not protrude through a batter line of
AO23.2
1:4.5 measured from the centre line of the
A minimum of 25% of the area within 4.5 metres of the
revetment wall;
revetment wall is planted with shrubs and small trees with
b) there is no additional load placed on the
a mature height of 3 metres or less.
revetment wall;
c) works do not pose a risk to the membrane AO23.3
adjoining the revetment wall; The ground surface within the first metre of the revetment
d) amenity of the waterway and surrounding land wall—
uses is not adversely affected by development a) is grass or ground cover; and
(building, filling or excavation) ensuring— b) does not include shrubs.
i. the 4.5 metre setback area is predominantly
soft landscaping;
ii. a maximum of 25% of the area is
impervious; AO23.4
iii. dominant impervious areas and masonry Side boundary fences within 4.5 metres of the revetment
retaining walls are avoided; wall taper down to a maximum height of 1.2 metres at
iv. retaining structures and the like are light the revetment wall and no more than 1.5 metres at a
weight, low rise and screened by distance of 2.25 metres from the revetment wall.
landscaping;
v. natural materials such as timber or rock are
used rather than manufactured materials;
vi. the acoustic privacy and access to sunlight
of surrounding development is protected;
and
vii. views are not impeded.
PO24 AO24 PO24 – Not Applicable
No shore side anchor points are installed within 4.5 No acceptable outcome provided The development does not involve Operational
metres of the centre line of the revetment wall. Works within Noosa Waters Estate waterways.
PO25 AO25 PO25 – Not Applicable
No mooring, anchoring, tying or docking of vessels No acceptable outcome provided The development does not involve Operational
occurs adjacent to the revetment wall. Works within Noosa Waters Estate waterways.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (B - Code Compliance.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.