OPW25/0012 - Arborist Report & Vegetation Management Plan

of 75

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (12.2 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 13, section 1. The text section number identifies this passage in the reader.

●


●


●
●


[OCR of page images]
Arborist Report
3 &7 Serenity Close, Noosa Heads

5 VEGETATION MANAGEMENT

This section of the plan sets outs tree protection measures for retained trees, including:

i. Pre-construction and clearing management measures,
ii. Demolition,
iii. Construction measures,
iv. Compliance measures, and,
v.  Post-construction management measures.

The purpose of the measures is to minimise development impacts on the trees.

Proposed tree retention procedures have been prepared in accordance with Australian
Standard AS 4970-2009 Protection of trees on development sites (Standards Australia
2009) and current best practice.

The nominated measures can be conditioned as part of a permit and implemented as part
of the demolition and construction stages to maintain the long-term viability of the tree.

5.1 PRE-CONSTRUCTION AND CLEARING

Pre-construction and clearing management measures for removal and retention of trees
are indicated on the VMP (Appendix 1). These recommendations can be conditioned by
Council as part of any development permit and can be addressed at the detailed design
stage.

All measures outlined in the VMP are to be implemented by the developer and their
contractors at all times whilst any site works are occurring within the curtilage of the
retained trees. Compliance with the requirements is to be administered by a Project
Arborist (AQF Level 5) with experience in construction supervision.

5.2. DEMOLITION

The following measures are to be implemented during demolition of any existing
dwellings, roadways and other structures on site to be removed, including the existing
sales office:

e Prestart meeting to occur with Project Arborist, site supervisor and demolition
contractor.

e TPZ fence to be installed in accordance with VMP drawings (Appendix 1) and in
consultation with Project Arborist.

e All works adjacent or within the TPZ to be supervised by Project Arborist.

e All demolition within TPZ to be undertaken with minimal use of heavy machinery.
Handheld machinery, such as jackhammer, to be used where it is practical to do so.

LTORIAS

11] 20

Used in these records

About this file

File size
12.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW25_0012 - Arborist Report & Vegetation Management Plan.pdf · 12.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.