Council archive · source document
OPW25/0012 - Arborist Report & Vegetation Management Plan
Plans and drawings: the text below has words only, no drawings.
Very large file (12.2 MB): may take a few minutes to open.
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
● ● ● ● [OCR of page images] Arborist Report 3 &7 Serenity Close, Noosa Heads 5 VEGETATION MANAGEMENT This section of the plan sets outs tree protection measures for retained trees, including: i. Pre-construction and clearing management measures, ii. Demolition, iii. Construction measures, iv. Compliance measures, and, v. Post-construction management measures. The purpose of the measures is to minimise development impacts on the trees. Proposed tree retention procedures have been prepared in accordance with Australian Standard AS 4970-2009 Protection of trees on development sites (Standards Australia 2009) and current best practice. The nominated measures can be conditioned as part of a permit and implemented as part of the demolition and construction stages to maintain the long-term viability of the tree. 5.1 PRE-CONSTRUCTION AND CLEARING Pre-construction and clearing management measures for removal and retention of trees are indicated on the VMP (Appendix 1). These recommendations can be conditioned by Council as part of any development permit and can be addressed at the detailed design stage. All measures outlined in the VMP are to be implemented by the developer and their contractors at all times whilst any site works are occurring within the curtilage of the retained trees. Compliance with the requirements is to be administered by a Project Arborist (AQF Level 5) with experience in construction supervision. 5.2. DEMOLITION The following measures are to be implemented during demolition of any existing dwellings, roadways and other structures on site to be removed, including the existing sales office: e Prestart meeting to occur with Project Arborist, site supervisor and demolition contractor. e TPZ fence to be installed in accordance with VMP drawings (Appendix 1) and in consultation with Project Arborist. e All works adjacent or within the TPZ to be supervised by Project Arborist. e All demolition within TPZ to be undertaken with minimal use of heavy machinery. Handheld machinery, such as jackhammer, to be used where it is practical to do so. LTORIAS 11] 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW25/0012 - Arborist Report & Vegetation Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 12.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.