Skip to the record
Beware of cheap imitations.

Council archive · source document

Negotiated Report (Representations made) OPW22 0299 [As Published] · OPW22/0299

of 7

Text shows just the words. Original shows the document exactly as it was published.

                           ED 22116 OPW-10                        Planting Plan prepared by 9 November 2022
                                                                  Element Design
                                                                  As amended by
                                                                  conditions

                           22_10_31_AIA_Markbain_Natas     1      Arboricultural Impact   31 October 2022
                           ha Katharina                           Assessment by Consult
                                                                  Arborist




               3.     CONCLUSION & REASONS FOR DECISION
               The proposed changes to the stormwater design are generally in accordance with Council’s
               standard and considered acceptable.
               RECOMMENDATION
               With regard to Application No. OPW22/0299, and the representations made, Council on 15 May
               2023 decided to:
               A.     Agree to amend condition1 to read as follows:
               Development undertaken in accordance with this approval must generally comply with the
               approved plans of development. The approved plans are listed in the following table unless
               otherwise amended by these conditions.

                           Plan No.                        Rev.   Plan/Document Name      Date

                           21617-C001                      D      Locality Plan & Drawing 19 April 2023
                                                                  Index prepared by TOD
                                                                  Engineers and Project
                                                                  Management

                           21617-C100                      C      Nominal Bulk Earthworks 23 February 2023
                                                                  prepared    by     TOD
                                                                  Engineers and Project
                                                                  Management

                           21617-C200                      D      General   Arrangement 19 April 2023
                                                                  prepared   by    TOD
                                                                  Engineers and Project
                                                                  Management

                           21617-C201                      C      Site Sections prepared 23 February 2023
                                                                  by TOD Engineers and
                                                                  Project Management

                           21617-C202                      D      Roadworks     Sections 19 April 2023
                                                                  prepared   by    TOD
                                                                  Engineers and Project
                                                                  Management




                                                                                                 Page 5 of 7

Document Set ID: 22424924
Version: 3, Version Date: 15/05/2023

Used in these records

About this file

File size
94 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Report (Representations made) OPW22 0299 [As Published].pdf · 94 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.