Original source · versioned page text
MCU21/0104.01 Application For A Minor Change To A Development Approval For A Material Change Of Use Of Premises (Undefined Use – Motorcycle / Scooter Sales & Repair) – 16 Rene St, Noosaville · Attachment 1 - (MCU21 0104.01) - Proposed Conditions
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 7 MAY 2024 ATTACHMENT 1 – (MCU21/0104.01) – PROPOSED AMENDED CONDITIONS 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Sheet No. Rev. Plan/Document Name Date PA1 1 Location prepared by Flexure 07.03.2024 PA4 1 Plan prepared by Flexure 07.03.2024 Annotated by Council PA5 1 Roof prepared by Flexure 07.03.2024 Annotated by Council PA6 1 Elevations prepared by Flexure 07.03.2024 Annotated by Council PA7 1 Sections prepared by Flexure 07.03.2024 Annotated by Council 5. The indoor and outdoor sales use area is limited to the areas detailed for these uses on the approved plans. 7. A minimum of 9 car parking spaces must be provided and marked on the site and made available and accessible at all times while the use is open for business. The works, including access to the parking, must be undertaken in accordance with an Operational Works approval and generally in accordance with drawing number PA 4 – issue 1 prepared by Flexure dated 7 March 2024. The works must include in particular: a. Car spaces 6, 9 and 10 dedicated as “staff” spaces; b. All car parking areas and access driveways must be maintained exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times; c. Directional signage must be provided to direct customers to the car parking spaces provided on site. 8. Service vehicle parking and standing spaces must be provided on the site and must include in particular a loading bay for a single unit truck 12 metres x 3.6 metres. 10. The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval and be generally in accordance with the drawing titled “Stormwater Management Plan”, number 0085-C1.2 prepared by SCG Consulting dated December 2023. Page 1 of 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original