Civil Engineering Plans

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 1, section 2. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
METHOD
                                                                               |
                                                                                   |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 STATEMENT
                                                                                       |
                                                                                           |
                                                                                                   |
                                                                                                           |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     150mm CBR15 TEMPORARY PAVEMENT            ·         SHEET PILES TO BE INSTALLED PLUMB & WITHIN 50mm OF DESIGN PLAN ALIGNMENT
                                                                                                                   ||
                                                                                                               |




                                                                                                                        ||
                                                                                                                             ||
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           ·         VIBRATION MONITORING IN ACCORDANCE WITH AUSTRALIAN STANDARDS TO BE
W




                                                                                                                                     |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               CARRIED OUT DURING ALL SHEETPILING AND ANCHORING OPERATIONS.
                                                                                                                                         |
                                                                                                                                             |
                                                                                                                                                                                                                                                                                                                          S




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  8.90           PROPOSED EARTHWORKS LEVEL                 ·         MAXIMUM VIBRATION LIMITS OF 5MM/SEC TO BE ACHIEVED FOR ADJACENT
                                 W




                                                                                                                                                 |
                                                                                                                                                     |
                      S




                                                                                                                                                         |
                                                                                                                                                             |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       ''EMERALD'' BUILDING
                                                                                                                                                                     |
                                                                                                                                                                 |




                                                                                                                                                                         |
                                                                                                                                                                             |                                                                                                                                                                                                                                                                                                                                                                                                                                                             ·         CONTRACTOR TO INDEMNIFY PRINCIPLE AGAINST ANY ACTIONS ARISING FROM
                                                                                                                                             W
                                                                                                                                                                                     |        |                                                                                                                                                                                                                                                                                                                                                                                                  ANCHORED SHEET PILING TO
                                                                                                                                                                                 |




                                                                                                                                                                                          |
                                                                                                                                                                                                       |                                                                                                                                                                                                                                                                                                                                                                                                                                             STRUCTURAL OR COSMETIC DAMAGE TO ''EMERALD'' BUILDING DUE TO
                                                                                                                                                                                                  |




                                                                       W                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         MANUFACTURERS DESIGN &
                                                                                                                                                                                                           |




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 CERTIFICATION.                                      CONSTRUCTION OPERATIONS.
                                                                                                                                                                                                           |




                                                                                                                                                                                                                                                                                                                                                                                                                                                             ALL BATTER GRADIENTS
                                                                                                                                                                                                   |
           W




                                                                                                                                                                                                  |




                                                                                                                                                                                              |
                                                                                                   D
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                NOTE:
                                                                                                                    E




                                                                                                                                                                                         | |
                                                                                                                             03




                                                                                                                                                                                                                                                                                                                                                                                                                                                             TO BE CONFIRMED BY                                                                                                                  PROPOSED TOP OF BATTER
                                                                                                                                                                                         |




                                                                                                                                                                                              |                                                                                                                                                                                                                                                                                                                                                                  | | | | | | | | | | | | |   |
                                                                                                                             W
                                                                                                                        PE




                                                                                                                                                                                                  |




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   ALL SERVICES TO BE LOCATED BY CONTRACTOR ON SITE PRIOR TO CONSTRUCTION. ANY
                                                                                                                                                                                                                                                                                                                                                                                                                                                             GEOTECHNICAL                                                                                                                        PROPOSED TOE OF BATTER
                                                                                                                                                                                                                                                                       S




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   DAMAGE TO EXISTING SERVICES TO BE RECTIFIED AT CONTRACTORS EXPENSE.
                                                                                                                                                 W




                                     W
                                                                                                                                                                                                    D
                                                                                                                                                                                                                                                                                                                                                                                                                                                             ENGINEER'S ONSITE                                                                                                                   EXISTING SURFACE CONTOUR

                                                                                                           W
                                                                                                                                                                                                   S                                                                                                                                                                                                                                                                                                                                                                          E                  EXISTING ELECTRICAL RETICULATION
                                                                            S
                                                                                                                                                                                                                                                                                                                                                                                                                                                               ALL WORKS TO BE CARRIED OUT IN STRICT                                                                          T                  EXISTING TELSTRA RETICULATION                 NETT EARTHWORKS VOLUMES
                                                                                                                                                                                                                                                                                                                                                                                                                                                               ACCORDANCE WITH APPROVED SETTLERS                                                                              D                  EXISTING STORMWATER DRAINAGE
                                                                                                                                                                                                                                                                                                                                                                                                                                                               COVE NOOSA RESIDENTIAL HIGH DENSITY                                                                                                                                                  EARTHWORKS FILL (SOLID)                                     = 11746m³
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              W                  EXISTING WATER RETICULATION
                                                                                                                                                                                                                                                                                                                                                                                                                                                               ENVIRONMENTAL MANAGEMENT PLAN (EMP1)                                                                                                                                                 EARTHWORKS CUT                                              = 45036m³
                                                                                                                                                                                                                                                                                                                                                                                                                                                               DATED 21 JULY 2005 BY WBM OCEANICS.                                                                            S                  EXISTING SEWER RETICULATION

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 STORMWATER MANHOLE / LABEL                         NOTE: ALL QUANTITIES SOLID COMPACTED IN GROUND. VOLUMES HAVE BEEN
                                                                                                                                                                                                                                                                                                                                                                                                                                              0               10              20               30                 40              50                                                                                                                CALCULATED FROM EXISTING SURFACE TO EARTHWORKS PAD LEVEL (VOLUMES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    INCLUDE ADDITIONAL EXCAVATION REQUIRED FOR CBR15 MATERIAL AND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    EXCAVATION FOR TEMPORARY BATTERS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                    SCALE 1:500 (A1), 1:1000 (A3)


    NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
                                                                                                                   PURPOSES.
                                                                                                                           PBL                                                                                                                                                                                                                                                                                                                                                                                                                    PROJECT:                                                                                                       DRAWING TITLE:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Brah 101 pty ltd t/a Alta Projects
                                                                                                                                                                                                                                                                                                                      Drawn: PBL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                               A.B.N. 91 611 354 511                                                                                                                                                             PRELIMINARY EARTHWORKS LAYOUT
                                                                                                                                                                                                                                  FOR APPROVAL                                                                         Date: AUG 2022                                                                                                                                          26 Memorial Avenue, Cotton Tree                                    PROPOSED HOTEL
                                                                                                                                                                                                                                                   NOT FOR CONSTRUCTION                                                                                                                                                                                                        PO Box 559, Cotton Tree, QLD, 4558                                                                                                                                                                                        Revision     Sheet
                                                                                                                                                                                                                                                                                                                 Checked:. . . . . . . . . . .
                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Tel (07) 5475 4125 Fax (07) 5479 1607                              at 3-7 SERENITY CLOSE, NOOSA HEADS                                                                             DRAWING No:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  A6769-22-PEW01           A         1 of
                                                                                                                                                                                                                                               STEVEN HARRISON
                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Email: [email protected]
      A    05/10/2022       ISSUE FOR APPROVAL                                                                                                                                                PBL                    S.H.
                                                                                                                                                                                                                                   .......................
                                                                                                                                                                                                                                       DIRECTOR APPROVAL                                                                    Datum AHD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Web: http://www.alta.net.au                                        for CALILE MALOUF INVESTMENTS
     REV       DATE                                                        DESCRIPTION                                                                                                        BY                    CHKD               RPEQ - 4784                                                                          A1 SHEET SIZE                                      FILENAME : a6769-22-PEW01 EARTHWORKS LAYOUT.dwg - DATE : 5/10/22 - 2:43pm - XREF's: X-BASE; X-SURVEY; X-ARCH L2; X-ARCH L1; X-ARCH L3; X-ARCH L4; H-Approved-SH; H-Checked-SH                                                                Council Ref:
Log in to download the original file

Civil Engineering Plans.pdf · 5.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.